NAMA PROYEK : FRO JASA PENDUKUNG PEKERJAAN CRUSHER & PEMELIHARAAN JALAN

NO. KONTRAK : #4600041064


DURASI KONTRAK
TGL. MULAI : 11/17/2017
TGL. BERAKHIR : 12/3/2020
PJO : ICHSAN YUSRAN

GIP
EXP.
NO B/N NAMA POSISI PROYEK
DATE OF BADGE
VALID UNTIL
ISSUE

1 C - 023590 ICHSAN YUSRAN PROJECT MANAGER FRO 20-Sep-20 14-Nov-20


2 C - 001903 JUMADI SUPERVISOR FRO 19-Sep-18 14-Nov-20
3 C - 021709 NADYA ANANTA PROJECT CONTROL FRO 17-Nov-15 14-Sep-21 14-Nov-20
4 C - 014860 EDUAR KADANG DRIVER FRO 12-Dec-13 14-Sep-21 14-Nov-20
5 C - 011937 HEBEN NEISER OPR. EXCAVATOR FRO 24-Apr-22 14-Nov-20
6 C - 018049 IRWANTO ARIFIN OPR. EXCAVATOR FRO 27-Mar-22 14-Nov-20
7 C - 006448 HENDRIK TANTONG OPR. EXCAVATOR FRO 27-Apr-21 14-Nov-20
8 C - 003757 RUDI HARTONO DRIVER TRONTON FRO 19-Aug-14 21-Jul-18 14-Nov-20
REKAP DATA KARYAWAN ( GIP, BADGE, MSSIP, & SIMPER ) PT. INDRA PRATAMA WASUPON

EXP. SIMPER
EXP. MSSIP
TRONTO FUEL WATER
EXC. DZR. DT. BUS
N TANK TANK
26-Sep-18
7-Dec-18
3-Oct-18
26-Sep-18 30-Nov-18 30-Nov-18
19-Oct-18 2-Oct-18
27-Mar-19 20-Mar-19
27-Mar-19 28-Oct-18
3-Jul-19 21-Sep-18 21-Sep-18
MA WASUPONDA

SLOPE
MCU
STABILITY
LV.

10-Feb-19 8-Aug-18

8-Aug-18
30-Nov-18 8-Aug-18

8-Aug-18