You are on page 1of 1

13200

32433.4 JAMES ST legend


13000 afd - aluminium framed door
afw - aluminium framed window
accessible parking al lvr - aluminium louvre

d
e

h
f

j
2 spaces bdy - boundary
br - brickwork
00 bg - box gutter

1350
9
8.
rl 8.741
ramp
ramp - 1:18 pb on stud cb - concrete blockwork
cfc - compressed fibre cement sheeting
dry / cold store meter room conc. - concrete
artwork display cleaners male wc
cafe kitchen CG.07 / CG.08 CG.18 conc col. - concrete column
disabled C.g.06 crs - corrugated zincalume roof sheeting
terrace CG.10 CG.12

4930
wc CG.11 ct - ceramic tile

5008
waste dp - downpipe
female CG.19
exg. - existing
wc CG.09 exit. - emergency exit
sc
ct on cb
fcl - finished ceiling level
line of bulkhead
over shown dotted ffl - finished floor level
fg - fixed glass
cafe
fascia of lower
roof shown dotted fsl - finished slab level
glass entrance conc. col. conc. col. C.g.05 cafe
terrace gl lvr - glass louvre
a ffl rl 9.513
Terrace insln - insulation
entry ffl rl 9.463
terrace
a
al framed
lvr - louvre
ffl rl 9.463 gallery shop extent of skylight concertina door
retain existing amenities
proposed niches C.g.04 reduced mdf - medium density fibreboard
retain existing firestair
removed and upgrade to comply md - metal deck roofing
mwc - metal wall cladding
st col. fascia of lower st col. with BCA
roof shown dotted
demolish exg. kilm and flue pb - plasterboard
ply - plywood
male pv - paving
admin exit.
conc. col. conc. col.
shower

A.g.05 rl - reduced level (AHD)


exg. 16 sq.m female ren - render
entrance rs - roof sheeting
proposed doors rw - retaining wall
A.g.08 proposed opening entry deleted
11.5 sq.m stair hall gallery removed C.g.01 sb - steel balustrade
skt - skirting board
b A.g.06
14.5 sq.m
A.g.03
50 sq.m
conc. ffl rl 9.513 sky - sky light
st. b - steel beam
exg. ffl rl 9.513 proposed opening lift and shop B.g.01 st col. - steel column
removed store removed 79 sq.m
exg. ffl rl 9.507
b st p - steel purlin
st t - stair timber
retain existing remove
staircase st s - stair steel
internal wall
t - timber
exit. tb - timber batten
services void B.g.02 t dk - timber decking
FIP
CG.14 23 sq.m tsf - timber strip flooring
widen and heighten
exg door to original v.ply - veneer plywood
dimensions and detail
Terrace
balcony ffl rl 9.463 conc.
st col. added
retain existing windows
gallery a / 2
C.g.02 wall shortened
ffl rl 9.513

c conc.

permanent exg door


gallery
corridor
c
A.g.01
135.5 sq.m gallery gallery bridge over
0 1.0 2.0 5.0
A.g.04 shown dotted courtyard
exg. ffl rl 9.513 32.5 sq.m gallery a / 1
cupboard C.g.03
added ffl rl 9.513
st col.

conc. Issue Date Amendment


duct
D 21.11.07 Section 96

26000
Les Darcy lift
gallery proposed mobile partitions
removed
A.g.02
62 sq.m store maitland regional

exg. ffl rl 9.513 art gallery


cleaner /
store
4013

A.g.07 lift and staircase


11.5 sq.m altered crate handling / Paul Berkemeier Architect
store room in association with Barry McGregor
CG.15
and Associates

Section 96 Application
Dwg No DA 03
Title Ground Floor Plan
6300

Scale 1:200
crate store loading dock
possible extension CG.16 CG.17 Date 21.11. 2007
not required proposed chiller and boiler
internal planning kiosk removed Drawn BT/VJW
altered

FRAIA Nominated Architect 4017


BSc(Arch) BArch(hons)Syd MArch Harvard
Copyright Paul Berkemeier Architect Pty Ltd
67 Milson Road Cremorne NSW 2090
ABN 35 003 589 400 ACN 003 589 400
d
e

h
f

5780 2000
Phone 02 9909 1277 Facsimile 02 9953 1834
e.mail pba@nsw.bigpond.net.au
c.o.s. 11000