ENGINEERING DATA TRANSMITTAL aes pa Fposmmor ia
Sauti rac 0145 ENG (0872000) 1 or 1 | danuary26,2015 | sioosssisar.sons
o Frou nave Te
ALGIHAZ GO. FOR CONTRACTING 8 TRADING lou AL-GABGAB SR PROJECT ENGINEER
kes Karen
Box 7451 Riyadh 11464, KSA [.20348 CENTRAL ADMINISTRATION UILOING, ABQANQ
ine sore ae
< jd Tam 24 [EH
ONYANESH PADAVAL, Project Director gi)
Ta
xn harp cane nce sage 1 ama ne
cect, BLIOOOIES Contact No SEDOORNOE
e ‘UPGRADE POWER TRANSMISSION SYSTEMLSAOO
ATEN amr nt | parewAtCorert. [pei td ror Deenen 0 Frat rearrnt
ECE DRE Fear
ease res an ru copy Fax #572300 Sota ro 1 Props ison
some me [2008 Conta Acrn. Buin, Abg@
rm ne Op
i DOCUMENT secure wen SAPAT REMARKS
Method OF Statements 0s
or sent -ar 7205 | PAT tiers have ben cad lease roost
A ‘Gantry Demolition Work “AGSATSRSRED
(Haradh GOSP-2) Rav 01 won 22.2018
== LASTITEN =
ce: SES/NRANKFOWISSINDS
SSROPO CENTRAL FLE (10-0085)
‘Saudi Aramco: Company General UseAL GIHAZ CO. LTD. Maile IP
DOCUMENT TRANSMITTAL
CN# 6600029903; BI # 10-00865
[To: ‘SAUDI ARAMCO OTL COMPANY S.No: -AG/SA/T/SR/15/061
Date 22-Jan-15
JAtten: —Mr.Hussain A Al Askari
Sx Project Engineer
lee: Mr. Ahmed H. Abdullah
Project Engineer
Project: Upgrade Power Transmission System at Southeren Area Oil Operation
Contract No: 6600029903 BI-10-00865
Document Type Gul] Submittal = [—v Drawing v
specication [] others oO
Tem No, Document Description oH Remarks
Method Statement for Gantry Demolition Work
ao Penner eee o1 set For SAPOIT Approval
For tnformation [—] For Approval 7 For Signature. [—]
For Process Return With More [—] Your Response [—]
Details
As requested [ Your File
[Checked By Name: Date
lbocument Originator: Muhammad Hammad 224an-35
\Verified By Name ‘Signature: Date:
lac Deptt: Norman G Marcos LIP 22sanas,
[Transmitted By: ’ Received By:
Name: Ramanand Raizada Name:
Signature: Signature:
Date: 22-Jan-15 Date:ENGINEERING DATA TRANSMITTAL ever: are: [SORTOL NG
‘Saul Avamen 0145 ENG (0672000) oF 1 | Janvary08,2018 | soosssisRiTR-23-15
@ From wave: me
‘ALGIHAZ CO. FOR CONTRACTING & TRADING G1. AL-GABGAB SR PROJECT ENGINEER
P.0.Box 1454 Riyadh 11464, KSA
tw
DNYANESH PADAVAL, Project Director
[c-20%44, CENTRAL ADMINISTRATION BUILDING, ABQNG
[sow ewe ORE By» Bis
dein ster ovr mgm 1 tow tm
‘moner BEIDAIEEE Tenor Ne SCOT
ate ‘wx: _UPGRADE PONVER TRANSWSSION SYST
eee metic |[Feriew i Conment [Tpevew And Ayprove Cierenp(one) (pesttrnemtia
aT 7 rT
je younsX Pez esp nd etn acopyo Fax 572-000 Sout fea OF Projets sor
= ee ore 120k ane Ain Sg Roe
uscd Lp [15+ [remnant
rr poem Sd SANT REMARKS
: Method OF Statement AGiSATISR AOR
Hy Gantry Demolition Work wos
(Hawiyah WIP & Haradh GOSP-2) [Please comply with all comments and resubrrit
= ASTITEM =
ce: SESALAIMNUFDNESSOS
'SAQPO CENTRAL FLE (8-10-0885)
Saucl Aramco: Company General Use