You are on page 1of 10

FORMULA POLINOMICA DE REAJUSTE (K)

Proceso
Obra REMODELACION Y AMPLIACION DE LA CAPACIDAD DE ALBERGUE EN EL E.P.S. - ICA - ETAPA II
Ubicación CACHICHE - ICA - ICA
Contratista CONSORCIO GMG-MECH-SETCON ASOCIADOS
Entidad INPE
Fecha Presupuesto Base Julio-09
Area Geografica 02

K = 0.288*(MOr / MOo) + 0.176*(CAr / CAo) + 0.109*(Ar / Ao) + 0.091*(Br / Bo) + 0.074*(Mr / Mo) + 0.073*(ADr / ADo) + 0.077*(MMr / MMo) + 0.112*(GGUr / GGUo)

F.POLINOMICA : 01 ESTRUCTURAS

Indice % COEF. P.BASE Nov-09 Dic-09 Abr-09 May-09 Jun-09 Jul-09 Ago-09 Sep-09

INEI DESCRIPCION Simbolo INC. INCID. Jul-09 Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr

47 MANO DE OBRA INC. LEYES SOCIALES MO 100.00% 0.288 397.23 413.41


0.300

21 CEMENTO PORTLAND TIPO I CA 55.68% 0.176 323.41 323.41

5 AGREGADO GRUESO 44.32% 214.54 207.94

275.16 272.24 0.174

3 ACERO DE CONSTRUCCION CORRUGADO A 100.00% 0.109 459.98 452.34


0.107

17 BLOQUE Y LADRILLO B 100.00% 0.091 669.34 643.80


0.088

43 MADERA NACIONAL PARA ENCOF. Y CARPINT. M 100.00% 0.074 495.79 499.13


0.074

13 ASFALTO AD 69.86% 0.073 1,131.79 1,253.01

30 DOLAR (GENERAL PONDERADO) 30.14% 378.60 363.47

904.80 984.93 0.08

48 MAQUINARIA Y EQUIPO NACIONAL MM 59.74% 0.077 338.21 330.19

49 MAQUINARIA Y EQUIPO IMPORTADO 40.26% 258.62 247.72

306.17 296.99 0.08

39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR GGU 100.00% 0.112 347.34 346.35


0.112

1.000 K= 1.009 0.000 0.000 0.000 0.000 0.000 0.000 0.000


FORMULA POLINOMICA DE REAJUSTE (K)
Proceso
Obra REMODELACION Y AMPLIACION DE LA CAPACIDAD DE ALBERGUE EN EL E.P.S. - ICA - ETAPA II
Ubicación CACHICHE - ICA - ICA
Contratista CONSORCIO GMG-MECH-SETCON ASOCIADOS
Entidad INPE
Fecha Presupuesto Base Julio-09
Area Geografica 02

K = 0.387*(MOr / MOo) + 0.076*(CPr / CPo) + 0.119*(Dr / Do) + 0.125*(Pr / Po) + 0.056*(Tr / To) + 0.076*(MPCr / MPCo) + 0.051*(MMr / MMo) + 0.110*(GGUr / GGUo)

F.POLINOMICA : 02 ARQUITECTURA

Indice % COEF. P.BASE Nov-09 Mar-09 Abr-09 May-09 Jun-09 Jul-09 Ago-09 Sep-09

INEI DESCRIPCION Simbolo INC. INCID. Jul-09 Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr

47 MANO DE OBRA INC. LEYES SOCIALES MO 100.00% 0.387 397.23 413.41


0.403

21 CEMENTO PORTLAND TIPO I CP 72.37% 0.076 323.41 323.41

62 POSTE DE CONCRETO 27.63% 387.77 380.68

341.19 339.23 0.076

30 DOLAR (GENERAL PONDERADO) D 100.00% 0.119 378.60 363.47


0.114

51 PERFIL DE ACERO LIVIANO P 100.00% 0.125 300.17 301.29


0.125

65 TUBERIA ACERO NEGRO Y/O GALV T 100.00% 0.056 332.24 339.74


0.057

54 PINTURA LATEX MPC 25.00% 0.076 329.89 329.73

24 CERAMICA ESMALTADA Y SIN ESMALTAR 22.37% 269.40 268.58

48 MAQUINARIA Y EQUIPO NACIONAL 52.63% 338.21 330.19

320.74 316.29 0.075

43 MADERA NACIONAL PARA ENCOFRADO MM 29.41% 0.051 495.79 499.13

46 MALLA DE ACERO 70.59% 576.81 564.24

552.98 545.09 0.050

39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR GGU 100.00% 0.110 347.34 346.35


0.110

1.000 K= 1.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000


FORMULA POLINOMICA DE REAJUSTE (K)
Proceso
Obra REMODELACION Y AMPLIACION DE LA CAPACIDAD DE ALBERGUE EN EL E.P.S. - ICA - ETAPA II
Ubicación CACHICHE - ICA - ICA
Contratista CONSORCIO GMG-MECH-SETCON ASOCIADOS
Entidad INPE
Fecha Presupuesto Base Julio-09
Area Geografica 02

K = 0.397*(MOr / MOo) + 0.148*(Tr / To) + 0.080*(Dr / Do) + 0.079*(Ar / Ao) + 0.056*(Cr / Co) + 0.064*(MMr / MMo) + 0.066*(PVTr / PVTo) + 0.110*(GGUr / GGUo)

F.POLINOMICA : 03 INSTALACIONES SANITARIAS

Indice % COEF. P.BASE Nov-09 Mar-09 Abr-09 May-09 Jun-09 Jul-09 Ago-09 Sep-09

INEI DESCRIPCION Simbolo INC. INCID. Jul-09 Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr

47 MANO DE OBRA INC. LEYES SOCIALES MO 100.00% 0.397 397.23 413.41


0.413

72 TUBERIA PVC PARA AGUA T 100.00% 0.148 334.36 340.04


0.151

30 DOLAR (GENERAL PONDERADO) D 100.00% 0.080 378.60 363.47


0.077

10 APARATO SANITARIO CON GRIFERIA A 100.00% 0.079 321.85 321.48


0.079

21 CEMENTO PORTLAND TIPO I C 100.00% 0.056 323.41 323.41


0.056

49 MAQUINARIA Y EQUIPO IMPORTADO MM 73.44% 0.064 258.62 247.72

43 MADERA NACIONAL PARA ENCOFRADO 26.56% 495.79 499.13

321.62 314.50 0.06

77 VALVULA DE BRONCE NACIONAL PVT 27.27% 0.066 286.03 281.98

56 PLANCHA DE ACERO LAC 45.46% 580.43 587.20

65 TUBERIA DE ACERO NEGRO Y/O GALVANIZADO 27.27% 332.24 339.74

432.46 436.47 0.07

39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR GGU 100.00% 0.110 347.34 346.35


0.110

1.000 K= 1.016 0.000 0.000 0.000 0.000 0.000 0.000 0.000


FORMULA POLINOMICA DE REAJUSTE (K)
Proceso
Obra REMODELACION Y AMPLIACION DE LA CAPACIDAD DE ALBERGUE EN EL E.P.S. - ICA - ETAPA II
Ubicación CACHICHE - ICA - ICA
Contratista CONSORCIO GMG-MECH-SETCON ASOCIADOS
Entidad INPE
Fecha Presupuesto Base Julio-09
Area Geografica 02

K = 0.106*(MOr / MOo) + 0.384*(CAr / CAo) + 0.212*(AAr / AAo) + 0.068*(Dr / Do) + 0.066*(MPDr / MPDo) + 0.056*(TPr / TPo) + 0.108*(GGUr / GGUo)

F.POLINOMICA : 04 INSTALACIONES ELECTRICAS

Indice % COEF. P.BASE Nov-09 Mar-09 Abr-09 May-09 Jun-09 Jul-09 Ago-09 Sep-09

INEI DESCRIPCION Simbolo INC. INCID. Jul-09 Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr Indice Kr

47 MANO DE OBRA INC. LEYES SOCIALES MO 100.00% 0.106 397.23 413.41


0.110

7 ALAMBRE Y CABLE TIPO TW Y THW CA 25.22% 0.384 484.14 528.24

19 CABLE NYY - CABLE NKY 74.78% 560.09 608.76

540.94 588.45 0.42

11 ARTEFACTO ALUMBRADO EXTERIOR AA 27.83% 0.212 251.94 237.25

12 ARTEFACTO ALUMBRADO INTERIOR 72.17% 282.76 271.54

274.18 262.00 0.20

30 DOLAR (GENERAL PONDERADO) GGU 100.00% 0.068 378.60 363.47


0.065

31 DÓLAR MAS INFLACION USA MDP 16.67% 0.066 367.47 359.80

48 MAQUINARIA Y EQUIPO NACIONAL 54.55% 338.21 330.19

62 POSTE DE CONCRETO 28.79% 387.77 380.68

357.35 349.66 0.07

72 TUBERIA DE PVC PARA AGUA TP 51.79% 0.056 334.36 340.04

57 PLANCHA DE ACERO LAF 48.21% 442.10 463.28

386.31 399.46 0.06

39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR GGU 100.00% 0.108 347.34 346.35


0.108
FORMULA POLINOMICA DE REAJUSTE (K)
Proceso
Obra REMODELACION Y AMPLIACION DE LA CAPACIDAD DE ALBERGUE EN EL E.P.S. - ICA - ETAPA II
Ubicación CACHICHE - ICA - ICA
Contratista CONSORCIO GMG-MECH-SETCON ASOCIADOS
Entidad INPE
Fecha Presupuesto Base Julio-09
Area Geografica 02

1.000 K= 1.027 0.000 0.000 0.000 0.000 0.000 0.000 0.000

VAL K-1 REAJUSTE VAL. REAJUSTADA


ESTRUCTURAS 2,911,626.32 0.009 26,204.64 2,937,830.96
ARQUITECTURA 2,052,694.11 0.010 20,526.94 2,073,221.05
INSTALACIONES SANITARIAS 150,294.86 0.016 2,404.72 152,699.58
INSTALACIONES ELECTRICAS 461,437.08 0.027 12,458.80 473,895.88

COSTO DIRECTO 5,576,052.37 61,595.10 5,637,647.47


GASTOS GENERALES (7%) 390,323.67 4,311.66 394,635.32
UTILIDAD (5%) 278,802.62 3,079.75 281,882.37

SUBTOTAL 6,245,178.65 68,986.51 6,314,165.16


IGV 1,186,583.94 13,107.44 1,199,691.38
a
TOTAL 7,431,762.60 82,093.95 7,513,856.54
Oct-09

Indice Kr

0.000
Oct-09

Indice Kr

0.000
Oct-09

Indice Kr

0.000
Oct-09

Indice Kr
0.000

You might also like