You are on page 1of 12
PROARTYOr owe roar Jay 5. Mier 08-02-08 X-407325-01 CAMERON | ioncvcoey ATE a ar Wit ona208 iv = Page 1 of | CAMERON'S IN-PLANT PROOF AND FUNCTION TEST PROCEDERK FOR U.& UM BLOWOUT PREVENTERS (BOPs), IN ACCORDANCE WITH APLIGA 3rd EAASO 135833. ‘This text procedure és applicable for dril-through eqpipment manufactured in accordance with APL IGA. 3rd Ed. ‘This test procedure or the appropriate sections of this Test procedure are to be performed prior to shipping the equipment from tho maauftcturer facility. The test uid for wellbore and hydraulic operating aysiom teste shall be ambient temperature tap water, dye and rot more shan 19% mist inhibitors ofuble ofl may be added. NOTE: Before shipping tho BOP, the operating system nast ba completly filed (a air removed) ‘with a fuid able 1o withstand -40 deg, F temperature without freezing, A recommended fluid would be PIN 718100. A chart recorder or date acquisition systens shall be used on'all pressure ests, TH? permanent ‘eootd generated aall identi the recording device, be dated, and signed L—_- PROOF TEST & FUNCTION TEST - IYDRAULIC OPERATING SYSTEM A. PROOF TEST . B CLOSING FUNCTION TEST C. OPENING FUNCTION TEST D. LOCKING FUNCTION TEST E, UNLOCK FUNCTION TEST IL PROOF TEST - BODY + IL LOCKED MODE FUNCTION TEST— RAMS. ; A. FIXED BORE OR BLIND RAMS +B. SIEAR RAMS FLEX AND VARIABLE RORE RAMS BREAKIN TEST (LOCK MODE FUNCTION TEST ‘IV. DRIFT TEST \. VISUAL INSPECTION OF RAM PACKERS “s11"001459" LNGUUND"BO-BAE"102°I2-FZCZBI-K AUNIHONL-a¥S/ Hd rS'rCI® OEZ/E/D ee _@ ha PROPERTY OF [emai one newsion = IY 8. Nee os.s2.05 7 ©} cameron lena i zs Xs102925-01 ME. Whitey 08.02.08 Page 1 of 2 Seder of Testing: ‘Tre Hy eoeate Proof, Shell, and Tests & 1 are to precede the ition Tests I. ‘The Drift Test IV shall be conducted last prior to vieeal inepedton. and Hold Periods: in temperature, sting of elastomer nels, ce compression of trapped air in the equipment being texted, Hata Peviods are given as minimums en per APL T6A, id pani sae holding periods may be Fal 12 sscommodate the requirements of the various seiing aahorton, ‘Timing of the test Definitions: Yealage Visiblo passage of the pressurized uid from the inside to tho outside ofthe pressure containment yolume ofthe equipment being tested, Subiized The presaure shall be considered to be stabilized when the pressure deci ste islets ‘han or equ tothe munutéctues's specified decline rte forthe specific tet Beiog conducted. ‘NO VISIBI.E1.EAKAGE IS ALLOWED DURING ANY PRESSURE TESTS 1 PROOF TEST & FUNCTION TEST. HYDRAULIC OPERATING SYSTEM ‘This text should be performed with bonnet assemblica installed on BOP body, NOTE: Ifa BOP body is not available, the Hydraulic Opcrating System Tests may be performed with the Bonnet Subassembily on the floor. AL F TEST — \ULIC OPERATING SYSTEM; | NOTE - This text sequence shall be conducted only once nuccessfully prior to releore af 0 i10P. WARNING " Steps (3) through (8) is 0 Proof Test. The BOP snust be isolated froin jersonnel during Pressure Teves! D1 819" INBEHINI-OT"DEB“TG°18-SZEZPI-X AWNHONL aks id! Eotrd care REVISION | 1 Hey 8. Niger 96-0. : @ CAMERON [agp ee | %-102825.03 MAP Whitay 06.02.06 | | L—___|__ Pages ora | 2) Connect hoses 10 the BOP open, close, tock, and i ics should be manifolded to one pressure source, amicaeaccea oe 8) Reduce the pressure to zero pal. THIS CONCLUDES THE PROOF TEST PORTION OF THE HYDRAULIC OPERATING SYSTEM TESTS 8. CLOSING FUNCTION Test; 1) Verify dhat the BOP is in. ‘the CLOSED position. 2) Disconnect the BOP cuntro! ‘system close fiction from the BOP. 3) Connect 2 hove with 4 chart recorder tothe BOP elote port ‘This hose should be coenected to ‘test preamure source, 4) Apply 3000 pei hydomtatic tat pressure te the BOP clone por, £9) Ate rina of 3000 pai tet pressure ia reached and hes stabilized, hold for peiod of et fonat three minutes, The allowahle preasure decline rat fr thi eatin 10 pai per meson 6) Reduce the hydrostatic test pressure co revo pas 7) Apply minimum of 3000 pai hydromatc et pressure fo the BOP close port 8) Alte ¢ minimum of 3000 pai tom pressure is reached and mabilized, hold for period not leas than fMftean mates, ‘The allowable preasure decline rate fr this teat ist0 pai par mina, 9) Reduce hydrostatic test pressure to zero pal. \ #1001609" ANBHEND"CO"BAP1OR-IB-SZEZBI-K ANSON Wit +S

You might also like