You are on page 1of 4

PORCELANATO OFICINAS

PISOS
OF. 401 A 89.56 M2
OF. 402 A 80.10
OF. 401 B 87.90
OF. 402 B 84.81
OF. 501 A 89.56
OF. 502 A 80.10
OF. 501 B 87.90
OF. 502 B 84.81
684.74 M2
ZOCALOS
OF. 401 A 57.39 ML
OF. 402 A 47.91
OF. 401 B 92.19
OF. 402 B 87.74
OF. 501 A 56.03
OF. 502 A 46.55
OF. 501 B 90.15
OF. 502 B 85.70
563.66 ML
56.37 M2

PORCELANATO AREAS COMUNES


PISOS
4TO PISO 18.81 M2
contrapasos 3.72 (3.1x1.2)
5TO PISO 18.81
contrapasos 3.72 (3.1x1.2)
AZOTEA 8.60
53.66 M2
ZOCALOS
4TO PISO 15.36 ML
contrapasos 3.10
5TO PISO 15.36
contrapasos 3.10
AZOTEA 8.74
45.66 ML
4.57 M2

EDIFICIO ORIGINAL
PISOS
1ER PISO 33.20 M2
contrapasos 3.24 (2.7x1.2)
2DO PISO 18.81
contrapasos 3.24 (2.7x1.2)
3ER PISO 18.81
contrapasos 3.24 (2.7x1.2)
80.54 M2
ZOCALOS
1ER PISO 26.66 ML
contrapasos 2.70
2DO PISO 15.36
contrapasos 2.70
3ER PISO 15.36
contrapasos 2.70
65.48 ML
6.55 M2
PORCELANATO OFICINAS
DEPARTAMENTOS ZOCALOS PISOS TOTAL COSTO/M2 COSTO/DPTO
OF. 401 A 57.39 ML 5.74 M2 89.56 M2 95.30 M2 12.00 S/ 1,143.59 S/
OF. 402 A 47.91 ML 4.79 M2 80.10 M2 84.89 M2 12.00 S/ 1,018.69 S/
OF. 401 B 92.19 ML 9.22 M2 87.90 M2 97.12 M2 12.00 S/ 1,165.43 S/
OF. 402 B 87.74 ML 8.77 M2 84.81 M2 93.58 M2 12.00 S/ 1,123.01 S/
OF. 501 A 56.03 ML 5.60 M2 89.56 M2 95.16 M2 12.00 S/ 1,141.96 S/
OF. 502 A 46.55 ML 4.66 M2 80.10 M2 84.76 M2 12.00 S/ 1,017.06 S/
OF. 501 B 90.15 ML 9.02 M2 87.90 M2 96.92 M2 12.00 S/ 1,162.98 S/
OF. 502 B 85.70 ML 8.57 M2 84.81 M2 93.38 M2 12.00 S/ 1,120.56 S/
563.66 ML 56.37 M2 684.74 M2 741.11 M2 8,893.27

1 porcelanato (0.60x0.60) 0.36 M2


1 caja (4 porcelanatos) 1.44 M2
INOCENCIO
nro porc area porc largo ancho area (m2)
SA 12/08/2017 28 0.36 10.08
LU 14/08/2017 5.80 3.60 20.88
MA 15/08/2017 3.33 3.73 12.42 24.75
3.80 1.16 4.41
22 0.36 7.92

FELIPE
nro porc area porc largo ancho area (m2)
SA 12/08/2017 22 0.36 7.92
LU 14/08/2017 2.62 0.98 2.57 16.77
2.51 2.36 5.92
23 0.36 8.28
MA 15/08/2017 14 0.36 5.04 16.49
3.54 3.24 11.45