Va PACKAGE V1 : CONSTRUCTION AND COMPLETION
MT. OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED
‘PROIECT ‘WORKS FROM SG BULOH TO KOTA DAMANSARA
— STATION
GANDA:
cae WEEKLY PROGRESS
“en REPORT NO.38
27 FEB 2014 — 06 MAR 2014IE we
Seer o = pron} 2
Te ar Tama —F
(snes -wuuna ren] AD eo, ‘onaunsog on
7 spe ses) 965] 9
% | aes
a [ares
fz a | wwoou |
Tae
rin} 58
snense |
so 0 | onraws
: roan,
we = ae = a | aes |
Seay REA [ Rano amen | oR | eRe | Ta = al
ve eae ve
PERNT PUS AE TAT HORE WESPACKAGE Vi: CONSTRUCTION AND COMPLETION OF VADUCT GUIDEWAY AND OTHER
‘ASSOCIATED WORK FROM SG BULOM TO KOTA DAMANSARA
‘PrBOD: 27 FEBRUARY 201406 mach. 2034
No JUST OF acre any,
[Water downer 2
2 [oump Tek a5
3 fexeater a
oad cane 2
(6 [ewer crane a
7 fier Ping =
3 [senerter set a
3 |wateriet “
30 |weldng st cu
2 leaning acne 2
13 [sadhoe “
1 |Tower Soot 2
15 Jon cuter 20
16 [conpactor Fate 7
{17 [Underground seriees Detector Epa z
[ear utng machine 0
21 —[ponable Concrete ar =
23h Compresior ie
33 ret Mourad ary Cane 2
30 [escsator Cm Seater a