You are on page 1of 1

Objectives:

1. Examine the performance of IMMB for the construction of walls used for non-load bearing
2. Self-aligning and interlocking of IMMB to reduce the needed for skilled labor and enhance the
construction productivity
3. Stability and stiffness of mortarless wall during and after construction.
4. Factors that influence the accuracy of IMMB
5. Maximum height of IMMB walling that can be managed before requiring strengthening
6. Economics of IMMB walls compared to conventional systems.

You might also like