PETRONAS
CARIGALI
CARIGALI STANDARD
PROCEDURE
JACKET / TOPSIDES
PRoci
REVISION: 4
EDURE NO : CSP-04
PROJECT SPECIFIC PROCEDURE GUIDELINES
FOR
PETRONAS CARIGALI SDN BHD
In the event of any ambiguity, inconsistency or conflict between this procedure and the
Contract Document and / or the Petronas Technical Standards (PTS), the Contract
Document and / or PTS shall take precedence over this procedure. CARIGALI's
interpretation shall be final
KUALA LUMPUR,
PCSB
REV | DATE PREPARED BY REVIEWED BY APPROVED BY
N
z Name | siGnarure | pate |] ame | stevature | pate | Name [siGNatut DATE
0 [rand st st___|7avel] prc [pre [rive] msm | msm |iaviaee
1 [rosedlapa [apa frosesl] pre [prc [rosa] mam | wsw_ | i338
2 [savscza | cect [sano] ere [pre fiosos| msm | msm [ios
3_[iasiod ARB wae] MRS si
4 [pariog) im fj aba | D~ [22/70] PBS parrpernonas
PROCEDURE NO: CSP-04
CARIGALI PROJECT SPECIFIC PROCEDURE}
GUIDELIN REVISION, : 4
REVISION LIST ”
SECTION | REV] DATE L DESCRIPTION OF AMENDMENT
Allsections |_3__| 14 Mar 06 | Revisions made due to editorial changes to the procedure.
Sect 5.18 [4 | 22 July 08 | Revisions made to update the testing and precommisioning_|
‘procedure - = i
De
- ¥ 12 |?106
CSP OF Rev iatPROCEDURE NO: CSP-04
brreowas PROJECT SPECIFIC PROCEDURE] 8 EPUMENOS CSP OF
CARIGALI GUIDELINES
REVISION
JACKET / TOPSIDES a ee
fF CONTENTS
SECTION DESCRIPTION PAGE
1.0 PURPOSE 3
20 COPE . 3
3.0 REFERENCES 3
4.0 DEFINITIONS, 3
5.0 GUIDELINES 3
5.1 Project Quality Assurance Plan 4
5.2 Planning Package 4
5.3 Weighing Procedure 9
54 Loadout and Seafastening Procedure 10
‘abrication Procedure 2
‘airing Procedure 1B
5.7 Trial Fitting Procedure 13
Lifting Procedure 14
bh Grouting Procedure 15
5.10 NDE Procedure ( Radiographic Testing ) 15
5.11 NDE Procedure ( Ultrasonic Testing ) 16
5.12 NDE Procedure 16
( Magnetic Particle Inspection )
5.13. NDE Procedure 16
(Dye Penetrant Inspection )
5.14 Levelling and Dimensional Control 16
5.15. Distortion Control Procedure 7
5.16 Mechanical, Electrical and Instrumentation 18
Installation Procedure
5.17 Heat Tracing and Installation Procedure 19
5.18 Detailed Testing and Precommissioning 20
Procedure
6.0 SPECIAL REQUIREMENTS 30
7.0 RECORDS 30