You are on page 1of 133
PETRONAS CARIGALI CARIGALI STANDARD PROCEDURE JACKET / TOPSIDES PRoci REVISION: 4 EDURE NO : CSP-04 PROJECT SPECIFIC PROCEDURE GUIDELINES FOR PETRONAS CARIGALI SDN BHD In the event of any ambiguity, inconsistency or conflict between this procedure and the Contract Document and / or the Petronas Technical Standards (PTS), the Contract Document and / or PTS shall take precedence over this procedure. CARIGALI's interpretation shall be final KUALA LUMPUR, PCSB REV | DATE PREPARED BY REVIEWED BY APPROVED BY N z Name | siGnarure | pate |] ame | stevature | pate | Name [siGNatut DATE 0 [rand st st___|7avel] prc [pre [rive] msm | msm |iaviaee 1 [rosedlapa [apa frosesl] pre [prc [rosa] mam | wsw_ | i338 2 [savscza | cect [sano] ere [pre fiosos| msm | msm [ios 3_[iasiod ARB wae] MRS si 4 [pariog) im fj aba | D~ [22/70] PBS parr pernonas PROCEDURE NO: CSP-04 CARIGALI PROJECT SPECIFIC PROCEDURE} GUIDELIN REVISION, : 4 REVISION LIST ” SECTION | REV] DATE L DESCRIPTION OF AMENDMENT Allsections |_3__| 14 Mar 06 | Revisions made due to editorial changes to the procedure. Sect 5.18 [4 | 22 July 08 | Revisions made to update the testing and precommisioning_| ‘procedure - = i De - ¥ 12 |?106 CSP OF Rev iat PROCEDURE NO: CSP-04 brreowas PROJECT SPECIFIC PROCEDURE] 8 EPUMENOS CSP OF CARIGALI GUIDELINES REVISION JACKET / TOPSIDES a ee fF CONTENTS SECTION DESCRIPTION PAGE 1.0 PURPOSE 3 20 COPE . 3 3.0 REFERENCES 3 4.0 DEFINITIONS, 3 5.0 GUIDELINES 3 5.1 Project Quality Assurance Plan 4 5.2 Planning Package 4 5.3 Weighing Procedure 9 54 Loadout and Seafastening Procedure 10 ‘abrication Procedure 2 ‘airing Procedure 1B 5.7 Trial Fitting Procedure 13 Lifting Procedure 14 bh Grouting Procedure 15 5.10 NDE Procedure ( Radiographic Testing ) 15 5.11 NDE Procedure ( Ultrasonic Testing ) 16 5.12 NDE Procedure 16 ( Magnetic Particle Inspection ) 5.13. NDE Procedure 16 (Dye Penetrant Inspection ) 5.14 Levelling and Dimensional Control 16 5.15. Distortion Control Procedure 7 5.16 Mechanical, Electrical and Instrumentation 18 Installation Procedure 5.17 Heat Tracing and Installation Procedure 19 5.18 Detailed Testing and Precommissioning 20 Procedure 6.0 SPECIAL REQUIREMENTS 30 7.0 RECORDS 30

You might also like