16 Besi bendrat kg
17 Baja konstruksi kg
18 Besi siku kg
19 Besi Canal C kg
20 Besi pelat tebal 6 mm, 8 mm kg
21 Besi track stang bh
22 Baut kuda-kuda ø 12 mm, 16mm kg
23 Baut angker kuda-kuda bh
24 Beton tumbuk m3
25 Beton campuran K-175 1pc : 2psr : 3krl m3
26 Cat besi / Cat kayu kg
27 Cat tembok ex. Maxilie kg
28 Cat meni dasaran kg
29 Cat dempul / plamir kg
30 Dolken kayu jati btg
31 Engsel lokal bh
32 Engsel daun pintu model T bh
33 Engsel daun Jendela bh
34 Eternit / Asbes 100 x 100 cm bh
35 Espagnolet bh
36 Galfanis m'
37 Genteng beton ex. Lokal bh
38 Genteng Vlam Press Lokal bh
39 Genteng kaca bh
40 Genteng kramik / Glazur bh
41 Genteng kodok Karang Pilang bh
42 Genteng bubungan pres lokal bh
43 Grendel Tanam set
44 Grendel Jendela SOLID set
43 Hak angin bh
44 Handle Bodi Pintu Kamar set
45 Handle Bodi Pintu KM/WC set
46 Handle Pintu Kamar set
47 Handle Pintu KM/WC set
48 Kaca bening 5 mm m2
49 Kaca bening 3 mm m2
50 Kaca rayban 5 mm m2
51 Kapur bubuk zak
52 Kapur bubuk 1 zak = Rp. 2000 m3
53 Kapur gamping kg
54 Kawat Bendrat kg
55 Kayu glugu m'
56 Kayu jati m3
57 Balok Kamper 8/15; 8/12; 6/12 m3
58 Papan Kamper 2/20; 3/20; 3/30 m3
59 Reng Kamper 2/3; 3/5 @ 4 m m3
60 Usuk Kamper 5/7; 4/6 @ 4 m m3
61 Balok Bengkirai 8/15; 8/12; 6/12 m3
62 Papan Bengkirai 2/20; 3/20 @ 4 m m3
63 Usuk Bengkirai 5/7; 4/7 @ 4 m m3
64 Kayu dolken btg
65 Kayu gelagar jembatan m3
66 Balok Jati 8/12; 6/12; @ 4 m m3
67 Reng Jati 2/3; 3/5 @ 2 m m3
68 Usuk Jati 5/7; 4/6; 3/5 @ 2 m3
69 Papan Jati 2/20; 3/20; 3/30 m3
70 Kayu Kruing m3
71 Balok Meranti 8/12; 6/12; @ 4 m m3
72 Papan Meranti 2/20; 3/20 @ 4 m m3
73 Usuk meranti 5/7; 4/6 @ 4 m m3
74 Perancah Meranti 4/6; 5/7 @ 4 m m3
75 Kayu papan bekisting Meranti 2/20 @ 4 m m3
76 Kayu rangka atap ( potongan ) m3
77 Kayu rangka plafond ( potongan ) m3
78 Kayu Sengon m3
79 Koral beton / pecah mesin m3
80 Keramik Dinding 10 x 20 cm m2
81 Keramik Lantai Roman 20 x 20 cm m2
82 Keramik Dinding Roman 20 x 25 cm m2
83 Keramik Lantai 30 x 30 cm m2
84 Kramik Lantai Roman 40 x 40 cm m2
85 Kertas Gosok lbr
86 Kloset Duduk kramik ( K I A ) bh
87 Kloset jongkok kramik ( INA ) bh
88 Kloset jongkok Mono block bh
89 Kunci - kunci lokal bh
90 Kunci pintu SES bh
91 Triplek 6mm lbr
92 Lem aibon kg
93 Lem Rajawali kg
94 Lapisan Teakwood lbr
95 List Eternit profil Kamper 1/4 cm @ 2 m m'
96 List Eternit profil Kamper 5/3 cm @ 2 m m'
97 List Keramik Roman 5x20 cm bh
98 Meni besi/kayu ltr
99 Minyak cat/thinner ltr
100 Minyak Fluk ltr
101 Minyak pelumas ltr
102 Minyak solar dan minyak tanah ltr
103 Multiplex 4 mm ( 110 x 210 lbr
104 Multiplex playwood /glossy 5 mm ( 110 x 210 lbr
105 Multiplex 7 mm ( 110 x 210 lbr
106 Multiplex 9 mm ( 110 x 210 m2
107 Nako ( kerangka + daun ) daun
108 Paku uk. Panjang 3" kg
109 Paku uk. Panjang 2" kg
110 Paku uk. Panjang 1" kg
111 Paku asbes bh
112 Paku jembatan kg
113 Paku kait bh
114 Paku kayu kg
115 Paku skrup bh
116 Paku seng ( paku payung ) kg
117 Paku sumbat bh
118 Pasir Cor m3
119 Pasir Pasang m3
120 Pasir Batu ( SIRTU ) m3
121 Pasir urug m3
122 Pipa PVC (air bersih) dia. 1" ljr - 4 mtr
123 Pipa PVC (air bersih) dia. 1/2" ljr - 4 mtr
124 Pipa PVC AW maspion dia. 3" ljr - 4 mtr
125 Pipa PVC (air bersih) AW Maspion dia. 3/4" ljr - 4 mtr
126 Pipa PVC AW maspion dia. 4" ljr - 4 mtr
127 Pipa PVC dia. 5" ljr - 4 mtr
128 Pipa PVC (air bersih) dia. 1,5" ljr - 4 mtr
129 Pipa Ledeng Galvanis ( GIP ) dia. 1" ljr - 4 mtr
130 Pipa Ledeng Galvanis ( GIP ) dia. 1,5" ljr - 4 mtr
131 Pipa Ledeng Galvanis ( GIP ) dia. 1/2" ljr - 4 mtr
131 Pipa Ledeng Galvanis ( GIP ) dia. 3/4" ljr - 4 mtr
132 Politur Mowilex kg
133 Rivet pak
134 Semen PC 50 kg per-zak kg
135 Semen PC 40 kg per-zak kg
136 Semen warna zak
137 Seng gelombang BJLS 27 lbr
138 Seng gelombang BJLS 30 lbr
139 Seng plat BJLS 27 lbr
140 Seng plat BJLS 30 lbr
141 Septitank dan resapan kapasitas 1 M3 unit
142 Septitank dan resapan kapasitas 10 M3 unit
143 Septitank dan resapan kapasitas 2 M3 unit
144 Septitank dan resapan kapasitas 6 M3 unit
145 Sikutan set
146 Stop kontak Broco bh
147 Skakelar ganda Broco bh
148 Skakelar tunggal Broco bh
149 Titik lampu + Instalasi ttk
150 Zekring kast unit
151 Kapur m3
152 Baja Ringan 1 kg
153 Baut Segala Ukuran 1 kg
154 Kunci/Slot Pintu bh
155 Paving Block Lokal 6cm bh
156 Gypsum Board ex. Elephent 9mm lbr
157 Besi Hollow 40x40mm m'
158 Plamir Tembok 1 kg
159 Kwas 3" bh
160 Sock 3/4" bh
161 Sock 4" bh
162 Knee 3/4" bh
163 Knee 4" bh
164 TBM kg
165 Lem PVC Isaarplas tube
166 Kabel NYA 2.5 mm m'
167 Pipa PVC 5/8" ljr
168 T dos PVC bh
169 Las doof bh
170 Kabel NYA 4.0 mm bh
171 Isolator m'
172 Fitting Plafond bh
NO SATUAN
1 3
Rp 125,000.00
Rp 20,000.00
Rp 23,500.00
Rp 18,975.00
Rp 9,650.00
Rp 9,650.00
Rp 9,650.00
Rp 9,900.00
Rp 6,500.00
Rp 4,500.00
Rp 67,500.00
Rp 366,340.00
Rp 453,200.00
Rp 48,800.00
Rp 80,960.00
Rp 25,500.00
Rp 13,000.00
Rp 95,000.00
Rp 9,500.00
Rp 65,000.00
Rp 35,000.00
Rp 17,000.00
Rp 65,000.00
Rp 44,500.00
Rp 4,200.00
Rp 1,200.00
Rp 14,100.00
Rp 6,500.00
Rp 4,700.00
Rp 2,100.00
Rp 35,750.00
Rp 46,000.00
Rp 4,500.00
Rp 67,500.00
Rp 67,500.00
Rp 102,500.00
Rp 88,500.00
Rp 127,200.00
Rp 83,800.00
Rp 183,600.00
Rp 2,000.00
Rp 318,000.00
Rp 1,000.00
Rp 18,975.00
Rp 31,500.00
Rp 5,750,000.00
Rp 2,500,000.00
Rp 2,700,000.00
Rp 2,150,000.00
Rp 2,300,000.00
Rp 2,400,000.00
Rp 2,575,000.00
Rp 2,050,000.00
Rp 17,500.00
Rp 1,950,000.00
Rp 8,250,000.00
Rp 4,500,000.00
Rp 7,700,000.00
Rp 8,500,000.00
Rp 4,250,000.00
Rp 1,665,000.00
Rp 3,000,000.00
Rp 1,669,000.00
Rp 1,428,000.00
Rp 1,547,000.00
Rp 1,200,000.00
Rp 1,250,000.00
Rp 937,500.00
Rp 405,000.00
Rp 32,500.00
Rp 38,000.00
Rp 41,500.00
Rp 42,600.00
Rp 45,000.00
Rp 5,000.00
Rp 650,000.00
Rp 150,000.00
Rp 350,000.00
Rp 27,500.00
Rp 110,000.00
Rp 92,500.00
Rp 17,500.00
Rp 18,000.00
Rp 90,000.00
Rp 2,500.00
Rp 12,500.00
Rp 15,000.00
Rp 11,500.00
Rp 7,850.00
Rp 750.00
Rp 13,000.00
Rp 950.00
Rp 75,000.00
Rp 95,900.00
Rp 86,500.00
Rp 192,900.00
Rp 15,000.00
Rp 18,750.00
Rp 14,500.00
Rp 10,500.00
Rp 1,250.00
Rp 5,500.00
Rp 825.00
Rp 8,750.00
Rp 425.00
Rp 8,300.00
Rp 425.00
Rp 275,000.00
Rp 105,000.00
Rp 90,000.00
Rp 75,000.00
Rp 27,500.00
Rp 15,000.00
Rp 23,250.00
Rp 21,250.00
Rp 76,475.00
Rp 95,000.00
Rp 37,750.00
Rp 54,250.00
Rp 85,000.00
Rp 31,750.00
Rp 44,900.00
Rp 60,000.00
Rp 35,000.00
Rp 1,250.00
Rp 1,150.00
Rp 45,000.00
Rp 46,550.00
Rp 52,500.00
Rp 27,000.00
Rp 28,500.00
Rp 950,000.00
Rp 3,950,000.00
Rp 1,350,000.00
Rp 2,750,000.00
Rp 17,500.00
Rp 27,000.00
Rp 37,800.00
Rp 33,000.00
Rp 42,500.00
Rp 135,000.00
Rp 193,000.00
Rp 125,000.00
Rp 19,600.00
Rp 375,000.00
Rp 1,800.00
Rp 55,000.00
Rp 4,000.00
Rp 11,200.00
Rp 12,700.00
Rp 300.00
Rp 17,500.00
Rp 400.00
Rp 20,000.00
Rp 2,000.00
Rp 5,750.00
Rp 4,400.00
Rp 7,500.00
Rp 1,050.00
Rp 150.00
Rp 7,200.00
Rp 800.00
Rp 10,600.00
Rp 63,300.00
Rp 93,300.00
Rp 27,600.00
Rp 31,800.00
Rp 35,900.00
Rp 38,600.00
Rp 44,000.00
Rp 18,100.00
Rp 30,000.00
Rp 67,700.00
Rp 98,400.00
Rp 135,200.00
Rp 4,699,900.00
Rp 19,100.00
Rp 193,266.00
Rp 750,000.00
Rp 350,000.00
Rp 39,200.00
Rp 43,700.00
Rp 1,377,700.00
Rp 455,100.00
Rp 455,100.00
R HARI 8 JAM KERJA
Rp 150,000.00
Rp 135,000.00
Rp 135,000.00
Rp 135,000.00
Rp 135,000.00
Rp 135,000.00
Rp 135,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 95,000.00
Rp 100,000.00
Rp 75,000.00
Rp 500,000.00
Rp 450,000.00
Rp 150,000.00
Rp 110,000.00
Rp 35,000.00
Rp 50,000.00
Rp 90,000.00
Rp 40,000.00
Rp 45,000.00
Rp 22,000.00
DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KERJA 2017-2018
Rp 28,500.00
Rp 22,500.00
Rp 35,000.00
Rp 500.00
Rp 53,000.00
Rp 30,000.00
Rp 30,000.00
Rp 85,000.00
Rp 100,000.00
Rp 350,000.00
Rp 120,000.00
Rp 260,000.00
Rp 337,000.00
Rp 200,000.00
Rp 175,000.00
Rp 32,000.00
Rp 39,000.00
Rp 87,000.00
Rp 188,000.00
Rp 303,000.00
Rp 65,000.00
Rp 197,000.00
Rp 525,000.00
Rp 315,000.00
Rp 365,000.00
Rp 2,250,000.00
Rp 2,900,000.00
Rp 476,000.00
Rp 2,100,000.00
Rp 3,530,000.00
Rp 560,000.00
Rp 175,000.00
Rp 340,000.00
Rp 135,000.00
Rp 12,500.00
Rp 42,000.00
Rp 34,100.00
Rp 29,500.00
Rp 20,000.00
Rp 34,000.00
Rp 130,000.00
Rp 500,000.00
Rp 115,000.00
Rp 85,000.00
Rp 27,500.00
Rp 150,000.00
Rp 23,500.00
Rp 29,000.00
Rp 35,000.00
Rp 85,000.00
Rp 65,000.00
Rp 80,000.00
Rp 7,500.00
Rp 55,000.00
29.2
36
Rp 1,360.00 3400000 1220
Rp 37.50
Rp 40.63
1.5
Rp 1.40
Rp 36.88
Rp 160,000.00
0.8883333333
1.58 18.96
Rp 5,416.67 /m
Rp 7,654.78 0.617 /m
Rp 8,122.36 Rp 8,783.78 /kg
10833.3333333333
5500
0.6166666667
105600
Rp 10,080.00
Rp 16,203.33
Rp 18,666.67 18600
Rp 21,448.33
Rp 25,946.67 25900
Rp 26,693.33
Rp 1,260,000.00 14 Rp 105,000.00
Rp 1,920,000.00 21.3333333333 Rp 160,000.00
Rp 2,664,000.00
Rp 3,300,000.00
Rp 4,462,500.00
Rp 5,940,000.00
Rp 6,931,200.00
Rp 8,170,000.00
Rp 9,412,800.00
10128000
11250
9750
Rp 179,600.00 1.2 102000
Rp 281,600.00
Rp 718,400.00
39000
85000
500
Rp 4,166.67 Rp 41,666.67
21000
Rp 87,500.00
Rp 8,666.67
Rp 10,000.00
Rp 150,000.00
PEKERJAAN : RENOVASI RUMAH TYPE 130m2
LOKASI : GRESIK
TAHUN : 2018
HARGA
NO URAIAN PEKERJAAN
SATUAN
1 2 3
I PEKERJAAN PERSIAPAN
9,500.00
7,500.00 17,000.00
17,000.00
39,600.00
40,250.00
300.00 80,150.00
12,000.00
9,500.00
750.00 22,250.00
102,400.00
64,125.00
10,125.00 74,250.00
74,250.00
136,800.00
10,800.00 147,600.00
26,400.00 26,400.00
174,000.00
148,500.00 148,500.00
28,500.00
15,000.00 43,500.00
192,000.00
9,690.00
2,850.00 12,540.00
12,540.00
19,000.00
6,000.00 25,000.00
25,000.00
185,000.00
274,720.00
124,200.00 583,920.00
90,000.00
30,000.00 120,000.00
703,920.00
43,200.00
19,516.00
12,150.00
6,000.00 80,866.00
28,500.00
12,000.00
1,350.00
2,250.00 44,100.00
124,966.00
90,000.00
19,516.00
5,000.00
12,150.00 126,666.00
12,000.00
28,500.00
1,350.00
2,250.00 44,100.00
170,766.00
75,000.00
16,800.00
5,000.00 96,800.00
28,500.00
12,000.00
1,350.00
1,500.00 43,350.00
140,150.00
8,160.00
5,400.00
2,500.00 16,060.00
18,000.00
28,500.00
2,700.00
1,500.00 50,700.00
66,760.00
2,380.00
200.00 2,580.00
12,000.00
1,350.00
19,000.00
1,500.00 33,850.00
36,430.00
504,560.00
143,000.00
204,000.00
4,300.00 855,860.00
156,750.00
33,000.00
3,780.00
12,450.00 205,980.00
1,061,840.00
9,339.47
425.00
1,000.00 10,764.47
902.50
1,140.00
108.00
60.00 2,210.50
12,974.97
26,250.00
54,750.00
24,750.00
7,500.00
25,000.00 82,950.00
24,700.00
8,100.00
31,200.00
3,900.00 40,740.00
123,690.00
1,061,840.00 248,930.50
640,444.70
799,517.88
40,800.00
1,236,900.00 3,530,572.08
3,779,502.58
1,061,840.00 248,930.50
933,981.86
753,186.84
34,068.00
1,649,200.00 4,183,346.20
4,432,276.70
1,061,840.00 248,930.50
1,280,889.40
930,515.81
54,468.00
2,143,960.00 5,222,742.71
5,471,673.21
1,061,840.00 248,930.50
1,423,210.45
1,092,264.42
90,576.00
2,473,800.00 5,892,760.37
6,141,690.87
1,061,840.00 248,930.50
800,555.88
838,776.26
34,068.00
2,267,650.00 4,753,959.63
5,002,890.13
1,061,840.00 248,930.50
914,921.00
856,919.16
38,760.00
2,356,000.00 4,979,509.66
5,228,440.16
1,061,840.00 248,930.50
1,423,210.45
1,092,264.42
90,576.00
3,298,400.00 6,717,360.37
6,966,290.87
1,061,840.00 248,930.50
400,277.94
558,637.49
1,484,280.00
10,200.00 2,204,464.93
2,453,395.43
1,061,840.00 248,930.50
683,348.61
683,348.61
34,000.00
872,173.08 3,085,779.80
3,334,710.30
1,061,840.00 248,930.50
854,185.77
854,185.77
34,000.00
1,129,702.00 3,684,983.04
3,933,913.54
5,000,000.00
900,000.00
5,900,000.00 5,900,000.00
1,061,840.00 248,930.50
957,223.20
4,530,744.81
28,152.00 6,329,029.52
6,577,960.02
137,500.00
4,200.00
16,000.00
5,500.00
163,200.00
9,000.00
25,000.00
16,500,000.00
52,500.00
283,500.00
252,000.00
665,000.00 1,253,000.00
17,787,000.00
1,000.00
600,000.00
9,000.00
2,700.00
14,175.00
126,000.00
33,250.00
785,125.00
754,320.00
60,000.00
105,000.00
125,000.00
1,044,320.00
484,000.00
132,000.00
60,000.00
120,000.00
796,000.00
960,498.00 3,571,510.50
313,200.00
1,962,812.50
90,000.00
85,000.00
60,000.00
100,000.00
450,000.00 450,000.00
4,021,510.50
928,481.40 3,161,931.40
313,200.00
1,570,250.00
90,000.00
60,000.00
200,000.00
450,000.00 450,000.00
3,611,931.40
856,800.00
100,000.00
1,044,320.00 1,901,120.00
2,001,120.00
1,175,040.00
4,179,000.00
300,000.00 5,354,040.00
5,654,040.00
1,060,800.00
2,786,000.00
200,000.00
4,046,800.00 3,846,800.00
776,832.00
1,592,000.00
200,000.00
2,568,832.00 2,368,832.00
388,416.00
796,000.00
100,000.00 1,184,416.00
1,284,416.00
254,592.00
78,000.00
100,000.00 332,592.00
432,592.00
652,800.00
557,200.00
200,000.00
1,410,000.00 1,210,000.00
1,305,600.00
1,114,400.00 2,420,000.00
100,000.00
2,520,000.00
150,000.00
150,000.00
96,250.00
1,080.00
9,000.00
14,250.00
1,200.00
121,780.00
90,000.00
45,000.00
4,800.00
139,800.00
7,875.00
1,200.00
103.00
150.00 #REF!
Err:509
4,800.00
#REF!
#REF!
Err:509
11,350.50
3,000.00
103.00
2,000.00
Err:509
4,800.00
#REF!
#REF!
Err:509
18,550.00
3,990.00
1,995.00
165.00
#REF!
15,600.00
#REF!
#REF!
131,250.00 157,240.00
13,600.00
4,590.00
7,800.00
38,000.00
1,350.00
1,500.00 40,850.00
198,090.00
105,000.00 172,300.00
13,600.00
45,900.00
7,800.00
1,350.00
38,000.00
1,500.00 40,850.00
213,150.00
47,250.00 50,892.00
1,632.00
810.00
1,200.00
3,600.00
405.00
5,700.00
450.00 10,155.00
61,047.00
131,250.00 172,038.00
12,648.00
4,860.00
23,280.00
6,075.00
38,000.00 44,075.00
216,113.00
126,000.00 151,990.00
13,600.00
4,590.00
7,800.00
54,000.00
950.00 54,950.00
206,940.00
6,745.00 23,245.00
12,000.00
1,500.00
3,000.00
3,800.00
9,600.00
1,080.00
600.00 15,080.00
38,325.00
6,792.50 30,292.50
19,000.00
1,500.00
3,000.00
3,800.00
9,600.00
1,080.00
600.00 15,080.00
45,372.50
20,000.00 20,000.00
95.00
24,000.00
6,750.00 30,845.00
50,845.00
29,500.00 29,500.00
95.00
24,000.00
675.00 24,770.00
54,270.00
10,000.00 20,500.00
2,700.00
7,800.00
95.00
24,000.00
675.00 24,770.00
45,270.00
34,000.00 148,833.33
19,500.00
95,333.33
95.00
24,000.00
675.00 24,770.00
173,603.33
42,000.00 42,000.00
95.00
24,000.00
6,750.00 30,845.00
72,845.00
34,100.00 34,100.00
95.00
24,000.00
6,750.00 30,845.00
64,945.00
23,500.00 51,000.00
27,500.00
23,750.00
30,000.00
3,375.00 57,125.00
108,125.00
29,000.00 56,500.00
27,500.00
23,750.00
30,000.00
3,375.00 57,125.00
113,625.00
35,000.00 62,500.00
27,500.00
23,750.00
30,000.00
3,375.00 57,125.00
119,625.00
65,000.00 92,500.00
27,500.00
23,750.00
30,000.00
3,375.00 57,125.00
149,625.00
85,000.00 112,500.00
27,500.00
23,750.00
30,000.00
3,375.00 57,125.00
169,625.00
80,000.00 80,000.00
23,750.00
30,000.00
3,375.00 57,125.00
137,125.00
85,000.00 85,000.00
23,750.00
30,000.00
3,375.00 57,125.00
142,125.00
115,000.00 115,000.00
23,750.00
30,000.00
3,375.00 57,125.00
172,125.00
9,600.00 16,160.00
6,560.00
3,420.00
7,200.00
810.00
270.00 11,700.00
27,860.00
11,700.00 19,695.00
7,995.00
3,420.00
7,200.00
810.00
270.00 11,700.00
31,395.00
26,100.00 35,235.00
9,135.00
3,420.00
7,200.00
810.00
270.00 11,700.00
46,935.00
56,400.00 94,940.00
38,540.00
7,695.00
16,200.00
1,822.50
615.00 26,332.50
121,272.50
90,900.00 122,715.00
31,815.00
76,950.00
16,200.00
18,225.00
615.00 111,990.00
234,705.00
65,000.00 77,500.00
12,500.00
4,050.00
18,000.00 22,050.00
99,550.00
175,000.00 187,500.00
12,500.00
4,050.00
18,000.00 22,050.00
209,550.00
525,000.00 537,500.00
12,500.00
4,050.00
18,000.00 22,050.00
559,550.00
8,160.00 375,860.00
2,700.00
365,000.00
142,500.00
180,000.00
21,600.00
24,000.00 368,100.00
743,960.00
2,250,000.00 2,861,000.00
135,000.00
476,000.00
104,500.00
132,000.00
21,600.00
24,000.00 282,100.00
3,143,100.00
8,160.00 813,060.00
2,700.00
175,000.00
560,000.00
67,200.00
114,000.00
174,000.00
20,250.00
15,000.00 323,250.00
1,136,310.00
2,100,000.00 2,352,000.00
252,000.00
104,500.00
132,000.00
21,600.00
24,000.00 282,100.00
2,634,100.00
RENCANA ANGGARAN BIAYA
I Pekerjaan Persiapan
1 Pembersihan lapangan 52.00 m2 Rp 18,000.00
2 Bongkar dinding 10.20 m2 Rp 26,000.00
3 Bonkar atap 52.00 m2 Rp 40,000.00
4 Pasang bouwplank 36.60 m2 Rp 102,400.00
Jumlah
II Pekerjaan Tanah dan galian
1 Galian tanah pondasi 14.27 m3 Rp 74,250.00
2 Bor pondasi strouss d-30cm 10.00 titik Rp 174,000.00
3 Urugan pasir bawah pondasi 2.38 m3 Rp 192,000.00
4 Buang tanah galian 11.89 m3 Rp 25,000.00
5 Urugan tanah kembali 7.14 m3 Rp 12,540.00
Jumlah
III Pekerjaan pasangan dan plesteran
1 Pasangan pond. Batu kali 10.07 m3 Rp 703,920.00
2 Pasangan dinding bata merah 91.64 m2 Rp 170,766.00
3 Pasangan dinding bata ringan 10.20.60 243.56 m2 Rp 140,150.00
4 Plesteran dinding 338.79 m2 Rp 66,760.00
5 Acian dinding 338.79 m2 Rp 36,430.00
Jumlah
IV Pekerjaan beton bertulang
1 Sloof 20x25 2.60 m3 Rp 3,779,502.58
2 Balok 20x30 3.36 m3 Rp 4,432,276.70
3 Balok 15x25 1.00 m3 Rp 5,471,673.21
4 Balok 15x15 1.30 m3 Rp 6,141,690.87
5 Kolom 15x40 0.50 m3 Rp 5,002,890.13
6 Kolom 15x35 3.10 m3 Rp 5,228,440.16
7 Kolom 15x15 2.60 m3 Rp 6,966,290.87
8 Tangga 1.20 m3 Rp 5,900,000.00
9 Pondasi footplat 4.20 m3 Rp 2,453,395.43
10 Pelat lantai tebal 15 cm 8.60 m3 Rp 3,334,710.30
11 Pelat lantai tebal 12 cm 3.65 m3 Rp 3,933,913.54
12 Pondasi strouss d-30 2.20 m3 Rp 6,577,960.02
Jumlah
V Pekerjaan kusen dan daun
1 Kusen/pintu kayu jati (p1) 1.00 bh Rp 4,021,510.50
2 Kusen/pintu kayu jati (p2) 3.00 bh Rp 3,611,931.40
3 Kusen/pintu Alumunium (p3) 2.00 bh Rp 2,001,120.00
4 Kusen/pintu jendela Alumunium (pj1) 1.00 bh Rp 5,654,040.00
5 Kusen/pintu jendela Alumunium (pj2) 1.00 bh Rp 4,046,800.00
6 Kusen/jendela Alumunium (j1) 2.00 bh Rp 2,568,832.00
7 Kusen/jendela Alumunium (j2) 1.00 bh Rp 1,284,416.00
8 Kusen/jendela Alumunium (j3) 1.00 bh Rp 432,592.00
9 Kusen/jendela Alumunium (J4) 1.00 bh Rp 1,410,000.00
10 Kusen/jendela Alumunium (j5) 1.00 bh Rp 2,520,000.00
Jumlah
VI Pekerjaan atap dan plafon
1 Kuda-kuda/ reng galvalum 57.50 m2 Rp 150,000.00
2 Atap genteng Onduline 57.50 m2 Rp 121,780.00
3 Plafond kalsiboard 6mm + rangka hollow 102.00 m2 Rp 139,800.00
Jumlah
VII Pekerjaan besi/baja
1 Pagar besi hollow/wiremash 15.60 m Rp 500,000.00
2 Railling tangga + void 20.00 m Rp 500,000.00
3 Tangga baja 9.20 m Rp 500,000.00
Jumlah
VIII Pekerjaan penutup lantai & dinding
1 Keramik 40.40 ex. Roman 92.40 m2 Rp 198,090.00
2 Keramik kamar mandi 20.20 ex.Roman 5.50 m2 Rp 213,150.00
3 Plint lantai 10.60 95.60 m Rp 61,047.00
4 Dinding kamar mandi+dapur 30.60 ex. Ro 27.44 m2 Rp 216,113.00
5 Keramik carport 30.60 ex. Roman 10.40 m2 Rp 206,940.00
Jumlah
IX Pekerjaan pengecatan
1 Cat dasar & cat finishing Interior ex. Dulux 313.19 m2 Rp 38,325.00
2 Cat dasar & cat finishing Eksterior ex. Dulu 25.60 m2 Rp 45,372.50
Jumlah
X Pekerjaan instalasi listrik
1 Stop kontak tunggal ex. Panasonic 8.00 bh Rp 50,845.00
2 Stop kontak ganda ex. Panasonic 4.00 bh Rp 54,270.00
3 Saklar ganda ex. Panasonic 8.00 bh Rp 72,845.00
4 Saklar tunggal ex. Panasonic 7.00 bh Rp 64,945.00
5 Kabel listrik eterna nym 3x2.5x50m 2.50 rol Rp 500,000.00
7 Lampu led phillips 10.5w + Fitting plafon 6.00 bh Rp 119,625.00
8 Lampu led phillips 23w + Fitting plafon 14.00 bh Rp 169,625.00
9 Lampu led ceilling plafon phillips 7w 4.00 bh Rp 137,125.00
10 Kap lampu gantung + Lampu led phillips 1 6.00 bh Rp 207,125.00
11 Stop kontak antena tv 3.00 bh Rp 173,603.33
12 Box + MCB 1.00 bh Rp 172,125.00
Jumlah
XI Pekerjaan Plumbing
1 Pipa air bersih 1/2" ex. Wavin 36.70 m Rp 27,860.00
2 Pipa air bersih 3/4" ex. Wavin 9.00 m Rp 31,395.00
3 Pipa air kotor 3" ex. Wavin 63.60 m Rp 121,272.50
4 Pipa air kotor 4" ex. Wavin 15.00 m Rp 234,705.00
5 Kran air tembok ex. Wall faucet S5M NZ 5.00 bh Rp 99,550.00
6 Kran sink ex. TOTO tx609k 1.00 bh Rp 209,550.00
7 Wastafel ex. TOTO LW247 + kran 1.00 bh Rp 1,136,310.00
8 Shower 1 set ex. TOTO tx492srrz 1.00 bh Rp 2,634,100.00
9 Closet jongkok ex. TOTO CE7 1.00 bh Rp 743,960.00
10 Closet duduk ex. TOTO cw637j/sw637jp 1.00 bh Rp 3,143,100.00
JUMLAH TOTAL
Dibulatkan
AYA
JUMLAH HARGA
Rp 936,000.00
Rp 265,200.00
Rp 2,080,000.00
Rp 3,747,840.00
Rp 7,029,040.00
Rp 1,059,547.50
Rp 1,740,000.00
Rp 456,768.00
Rp 297,275.00
Rp 89,472.90
Rp 3,643,063.40
Rp 7,088,474.40
Rp 15,648,996.24
Rp 34,134,934.00
Rp 22,617,620.40
Rp 12,342,119.70
Rp 91,832,144.74
Rp 9,826,706.71
Rp 14,892,449.71
Rp 5,471,673.21
Rp 7,984,198.13
Rp 2,501,445.07
Rp 16,208,164.51
Rp 18,112,356.27
Rp 7,080,000.00
Rp 10,304,260.81
Rp 28,678,508.62
Rp 14,358,784.40
Rp 14,471,512.04
Rp 149,890,059.47
Rp 4,021,510.50
Rp 10,835,794.20
Rp 4,002,240.00
Rp 5,654,040.00
Rp 4,046,800.00
Rp 5,137,664.00
Rp 1,284,416.00
Rp 432,592.00
Rp 1,410,000.00
Rp 2,520,000.00
Rp 39,345,056.70
Rp 8,625,000.00
Rp 7,002,350.00
Rp 14,259,600.00
Rp 29,886,950.00
Rp 7,800,000.00
Rp 10,000,000.00
Rp 4,600,000.00
Rp 22,400,000.00
Rp 18,303,516.00
Rp 1,172,325.00
Rp 5,836,093.20
Rp 5,929,060.16
Rp 2,152,176.00
Rp 33,393,170.36
Rp 12,003,006.75
Rp 1,161,536.00
Rp 13,164,542.75
Rp 406,760.00
Rp 217,080.00
Rp 582,760.00
Rp 454,615.00
Rp 1,250,000.00
Rp 717,750.00
Rp 2,374,750.00
Rp 548,500.00
Rp 1,242,750.00
Rp 520,810.00
Rp 172,125.00
Rp 8,487,900.00
Rp 1,022,462.00
Rp 282,555.00
Rp 7,712,931.00
Rp 3,520,575.00
Rp 497,750.00
Rp 209,550.00
Rp 1,136,310.00
Rp 2,634,100.00
Rp 743,960.00
Rp 3,143,100.00
Rp 20,903,293.00
Rp 419,975,220.41
Rp 419,975,000.00
NO URAIAN PEKERJAAN VOLUME
I Pekerjaan Persiapan
1 Pembersihan lapangan 52.00 m2
2 Bongkar dinding 10.20 m2
3 Bonkar atap 52.00 m2
4 Pasang bouwplank 36.60 m2
IX Pekerjaan pengecatan
1 Cat dasar & cat finishing Interior ex. Dulux 313.19 m2
2 Cat dasar & cat finishing Eksterior ex. Dulux 25.60 m2
Rp 18,000.00 Rp 936,000.00
Rp 26,000.00 Rp 265,200.00
Rp 40,000.00 Rp 2,080,000.00
Rp 102,400.00 Rp 3,747,840.00
Jumlah Rp 7,029,040.00
Rp 74,250.00 Rp 1,059,547.50
Rp 147,600.00 Rp 1,476,000.00
Rp 43,500.00 Rp 103,486.50
Rp 25,000.00 Rp 297,275.00
Rp 12,540.00 Rp 89,472.90
Jumlah Rp 3,025,781.90
Rp 120,000.00 Rp 1,208,400.00
Rp 44,100.00 Rp 4,041,324.00
Rp 43,350.00 Rp 10,558,326.00
Rp 50,700.00 Rp 17,176,653.00
Rp 33,850.00 Rp 11,468,041.50
Jumlah Rp 44,452,744.50
Rp 248,930.50 Rp 647,219.30
Rp 248,930.50 Rp 836,406.48
Rp 248,930.50 Rp 248,930.50
Rp 248,930.50 Rp 323,609.65
Rp 248,930.50 Rp 124,465.25
Rp 248,930.50 Rp 771,684.55
Rp 248,930.50 Rp 647,219.30
Rp 5,900,000.00 Rp 7,080,000.00
Rp 248,930.50 Rp 1,045,508.10
Rp 248,930.50 Rp 2,140,802.30
Rp 248,930.50 Rp 908,596.33
Rp 248,930.50 Rp 547,647.10
Jumlah Rp 15,322,088.86
Rp 450,000.00 Rp 450,000.00
Rp 450,000.00 Rp 1,350,000.00
Rp 100,000.00 Rp 200,000.00
Rp 300,000.00 Rp 300,000.00
Rp 200,000.00 Rp 200,000.00
Rp 200,000.00 Rp 400,000.00
Rp 100,000.00 Rp 100,000.00
Rp 100,000.00 Rp 100,000.00
Rp 200,000.00 Rp 200,000.00
Rp 100,000.00 Rp 100,000.00
Jumlah Rp 3,400,000.00
Rp 150,000.00 Rp 8,625,000.00
Rp 121,780.00 Rp 7,002,350.00
Rp 139,800.00 Rp 14,259,600.00
Jumlah Rp 29,886,950.00
Rp 500,000.00 Rp 7,800,000.00
Rp 500,000.00 Rp 10,000,000.00
Rp 500,000.00 Rp 4,600,000.00
Jumlah Rp 22,400,000.00
Rp 40,850.00 Rp 3,774,540.00
Rp 40,850.00 Rp 224,675.00
Rp 10,155.00 Rp 970,818.00
Rp 44,075.00 Rp 1,209,197.63
Rp 54,950.00 Rp 571,480.00
Jumlah Rp 6,750,710.63
Rp 15,080.00 Rp 4,722,905.20
Rp 15,080.00 Rp 386,048.00
Jumlah Rp 5,108,953.20
Rp 30,845.00 Rp 246,760.00
Rp 24,770.00 Rp 99,080.00
Rp 30,845.00 Rp 246,760.00
Rp 30,845.00 Rp 215,915.00
Rp 500,000.00 Rp 1,250,000.00
Rp 57,125.00 Rp 342,750.00
Rp 57,125.00 Rp 799,750.00
Rp 57,125.00 Rp 228,500.00
Rp 57,125.00 Rp 342,750.00
Rp 24,770.00 Rp 74,310.00
Rp 57,125.00 Rp 57,125.00
Jumlah Rp 3,903,700.00
Rp 11,700.00 Rp 429,390.00
Rp 11,700.00 Rp 105,300.00
Rp 26,332.50 Rp 1,674,747.00
Rp 111,990.00 Rp 1,679,850.00
Rp 22,050.00 Rp 110,250.00
Rp 22,050.00 Rp 22,050.00
Rp 323,250.00 Rp 323,250.00
Rp 282,100.00 Rp 282,100.00
Rp 368,100.00 Rp 368,100.00
Rp 282,100.00 Rp 282,100.00
Jumlah Rp 5,277,137.00
Rp - Rp - Rp 936,000.00
Rp - Rp - Rp 265,200.00
Rp - Rp - Rp 2,080,000.00
Rp - Rp - Rp 3,747,840.00
Rp - Rp 7,029,040.00
Rp - Rp 1,059,547.50
Rp 26,400.00 Rp 264,000.00 Rp 1,740,000.00
Rp 148,500.00 Rp 353,281.50 Rp 456,768.00
Rp - Rp - Rp 297,275.00
Rp - Rp - Rp 89,472.90
Rp 617,281.50 Rp 3,643,063.40
Rp - Rp - Rp 8,625,000.00
Rp - Rp - Rp 7,002,350.00
Rp - Rp - Rp 14,259,600.00
Rp - Rp 29,886,950.00
Rp - Rp - Rp 7,800,000.00
Rp - Rp - Rp 10,000,000.00
Rp - Rp - Rp 4,600,000.00
Rp - Rp 22,400,000.00
Rp 419,975,000.00
REKAPITULASI
PEMBANGUNAN PARKIR MOBIL PT.MBM
No. Tipe konstruksi Pjng Ekivalen = 1m3 Kbthan Tul. Brt Tul. Brt. Per
lbr tgg pnjg (mm) (kg/m) 1m (kg)
A Tulangan Pokok
1 Sloof 20.25 0.20 0.25 20.00 4 Ø 10.0 0.617 2.468
2 Balok 20.30 (B1) 0.20 0.30 16.67 7 Ø 10.0 0.617 4.319
3 Balok 15.25 (B2) 0.15 0.25 26.67 6 Ø 10.0 0.617 3.702
4 Balok 15.15 (B3) 0.15 0.15 44.44 4 Ø 10.0 0.617 2.468
5 Kolom 15.40 (K1) 0.15 0.40 16.67 6 Ø 10.0 0.617 3.702
6 Kolom 15.35 (K2) 0.15 0.35 19.05 6 Ø 10.0 0.617 3.702
7 Kolom 15.15 (K3) 0.15 0.15 44.44 4 Ø 10.0 0.617 2.468
8 Foot plat 100.20 1.00 0.20 5.00 10 Ø 10.0 0.617 6.17
9 Strouss d30 3.14 0.02 13.85 6 Ø 12.0 0.888 5.328
10 Pelat lantai 12cm X 0.12 2.50 3.33 50 Ø 8.0 0.395 19.75
11 Pelat lantai 12cm Z 0.12 8.10 1.03 162 Ø 8.0 0.395 63.99
12 Pelat lantai 15cm X 0.15 5.20 1.28 104 Ø 8.0 0.395 41.08
13 Pelat lantai 15cm Z 0.15 10.50 0.63 210 Ø 8.0 0.395 82.95
14 Tangga 0.28 0.28 12.76 6
PERHITUNGAN JUMLAH BERAT SENGKANG PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI
No. Tipe konstruksi Pjng Ekivalen = 1m3 Kbthan Tul. Brt Tul. Brt. Per
lbr tgg pnjg (mm) (kg/m) 1m (kg)
B Beugel/sengkang dan tul.b
1 Sloof 20.25 0.15 0.20 0.78 200 Ø 8.0 0.395 79
2 Balok 20.30 (B1) 0.15 0.25 0.88 167 Ø 8.0 0.395 65.965
3 Balok 15.25 (B2) 0.10 0.20 0.68 267 Ø 8.0 0.395 105.465
4 Balok 15.15 (B3) 0.10 0.10 0.48 444 Ø 8.0 0.395 175.38
5 Kolom 15.40 (K1) 0.10 0.35 0.98 167 Ø 8.0 0.395 65.965
6 Kolom 15.35 (K2) 0.10 0.30 0.88 190 Ø 8.0 0.395 75.05
7 Kolom 15.15 (K3) 0.10 0.10 0.48 444 Ø 8.0 0.395 175.38
8 Foot plat 100.20 0.90 0.15 2.18 50 Ø 8.0 0.395 19.75
9 Strouss d30 3.14 0.02 6.406 138 Ø 8.0 0.395 54.51
Kolom 15.15 (K3) 0.15 0.35 1.08 125 0 8.0 0.395 49.375
Kbthn Pnjng ljr Luasan Jumlah begel
per m3 (kg) per m3 Bkstng (m2)
12.5
Kbthn Pnjng ljr Kebutuhan 19.04762
per m3 (kg) per m3 bendrat 133.3333
11.11111
61.62 23.13 2.4 kg 44.44444
58.05 21.79 2.004 kg
71.72 26.92 3.204 kg
84.18 31.60 5.328 kg
64.65 24.27 2.004 kg
66.04 13.93 2.28 kg 3.07125 42.79275
84.18 31.60 5.328 kg 29.25
43.06 9.08 0.6 kg
349.19 131.08 1.656 kg
22.22222
133.3333
52.66667
133.3333
11.11111 25
81
8.19 91
91
390 182
65.83465
13.88889
11.11111 0.19048
m 19 m 7.6 m3
0.5 39 0.492 19.188
0.14 m2 8 1.68 m3
19 m 0.95 m3
m2 19 m 4.275 m3 23.463
3.325 m3
m2 19 m 4.275 m3
m 88.11 m 2 563.904 -3.2 m2
5.2 16.64 m2 37.76
82.91 265.312 m2 99.55
563.904 82.91
36 2.7
36 1.35
19 0.7125
19 0.57
1.68
0.6 13 1.17
0.5 8 0.5
3 6 0.405
1 8 1.4
7.4 2 17.1
11.12 7 77.84
0.96 7 6.72
6.8 12 81.6
11.12 6 66.72 232.88
4.78 7 33.46
1.5 12 18
6.8 6 40.8 92.26
40.38 6 206.28
15.6 6 93.6
36 180
9 31.5 211.5
36
2.1 5.985
2.6 7.41 13.395
21.33 8 401.004
80.9 8 45.304
80.9 8 73.1336 118.4376
0.79 8 14.852
8 0.56 15.412
3.35 15.9795
2.01
36 180
36 18 162
16.64 2 33.28
439.16 4 70.2656
77.84 2 6.2272
77.84 2 9.3408 85.8336
5
2
2
96.13
14
14
0
0 38.22
-3.2
34.8
12
5.8
12.00188
58
18.8
18.8
401.004
9871.245
180 30
72 12
252 42
478
96
DAFTAR VOLUME PEKERJAAN
NO URAIAN VOLUME
I Pekerjaan Persiapan
1 Pembersihan lapangan 52 m2
2 Pasang bouwplank 36.6 m
IX Pekerjaan pengecatan
1 Cat dasar & cat finishing Interior ex. Dulux 313.19 m2
2 Err:509 Err:509 m2
I PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LAPANGAN
2 PASANG BOWPLANK 36.60 M1
IX PEKERJAAN PENGECATAN
1 PLAMIR DAN CAT TEMBOK 313.19 M2
2 PENGECATAN PERMUKAAN BESI Err:509 M2
NO MATERIAL VOLUME
Kayu meranti balok 5/7 Err:509 ljr
Kayu meranti papan 3/20 Err:509 ljr
Minyak bekisting Err:509 ltr
Solar Err:509 ltr
Minyak pelumas besi Err:509 ltr
Air Err:509 ltr
Paku 2-5` Err:509 kg
Batu bela 10.07 m3
Pasir pasang 33.35 m3
Pasir cor Err:509 m3
Sirtu Err:509 m3
Semen portland Err:509 zak
Kerikil Err:509 m3
Bata merah 6598.08 bh
Besi beton d-12mm Err:509 lnjr
Besi beton d-10mm Err:509 lnjr
Besi beton d-8mm Err:509 lnjr
Besi beton d-6mm Err:509 lnjr
Besi kawat bendrat Err:509 kg
Besi beton d-12 (ikatan angin) 0.00 lnjr
Aluminium kusen " 1.10 m
Aluminium pintu + kaca 5mm Err:509 bh
Aluminium jendela + kaca 5 mm Err:509 bh
Skrup/rivet Err:509 kg
Talang PVC 10 cm Err:509 m
Kawat las Err:509 kg
Atap spandek Zinkalum 3.5 mm Err:509 m2
Baut skrup Err:509 bh
Engsel Err:509 bh
Handle pintu/jendela Err:509 bh
Besi hollow 60/40 1.7mm Err:509 m
Besi hollow 40/40 1.7mm Err:509 m
Besi hollow 20/40 1.7mm Err:509 m
Besi hollow 20/20 Plafond 1.4 mm Err:509 m
Besi hollow 40/40 Plafond 1.4 mm Err:509 m
Baja WF 200.100.5,5.8 0.77 m
Pelat besi t-10mm 23.00 kg
Kalsi board EG. Uk 120.60.6mm Err:509 lbr
Paving stone Err:509 m2
Keramik lantai roman 30x30 97.02 m2
Keramik dinding roman 20x25 100.38 m2
Cat besi Err:509 kg
Cat tembok catylac 62.64 kg
Plamir 44.47 kg
TULASI KEBUTUHAN BAHAN
URAIAN KOEFISIEN JUMLAH SAT.
8.00 BH
8.00 BH
7.00 BH
2.50 M
Err:509 BH
Err:509 BH