You are on page 1of 1

8

D of
HA555 EA-383186 P 3-1313003.03 4400004656 3 4 5 6 7
02 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

OW NER.
1 2
13.8kV U/V LOAD SHEDDING PANEL-2 +UVLS.2

RELAY

TS
94LS/B317 RELAY

94LS/B318 RELAY

94LS/B319 RELAY

OF I
ON

SUPERVISION

SUPERVISION

SUPERVISION
94LS/B316
SI
SUPERVI

CONSENT
A A

TTEN
+R1 +R1
SHT.01/7A SHT.03/1A

THE W RI
LEGEND

THOUT
DEVICE DESCRIPTION TYPE MAKE

94LS.... TRIP RELAYS ELECTRO SWITCH

WI
7868FD

SUPERVISION RELAY FOR SPER1C1 ABB

DOCUMENT
74/94LS...
TRIP RELAY

+UVLS.1 +UVLS.1 +UVLS.1 +UVLS.1 TEST SWITCH FT19R ABB


TS....

B 11 18 11 18 11 18 11 18 B

1X5 5 1X5 6 1X5 7 1X5 8


74/94LS/B316 74/94LS/B317 74/94LS/B318 74/94LS/B319

S
THI
/2D /3D /5D /6D
EA-383183 SPER1C1 EA-383183 SPER1C1 EA-383183 SPER1C1 EA-383183 SPER1C1
2X5 5 21 28 2X5 6 21 28 2X5 7 21 28 2X5 8 21 28
SHT.03 SHT.03 SHT.03 SHT.03

FROM NED
SHALL BE OBTAI
94LS/B316 94LS/B317 94LS/B318 94LS/B319

11 13 11 13 11 13 11 13
/1D /3D /4D /6D
08/5A

08/6A

08/2D
08/1D
2 2 2 2
A A A A
SHT.

SHT.

SHT.

SHT.
TS10

TS11
TS8

TS9

1 1 1 1

PART
TB1 TB2 TB1 TB2 TB1 TB2 TB1 TB2

N
I
C C

FULL OR
B B B B
LOR LOR LOR LOR
A A A A

F F F F
LOR

LOR

LOR

LOR
K2

K2

K2

K2
K1

K1

K1

K1

N
I
K1

K1

K1

K1
G G G G

ON
REPRODUCTI
RESET

RESET

RESET

RESET
P

P
LOR

LOR

LOR

LOR
LOR

LOR

LOR

LOR
TRI

TRI

TRI

TRI
K2

K2

K2

K2
LOR LOR LOR LOR
R2

R2

R2

R2
R1

R1

R1

R1
REFERENCE DRAWINGS
94LS/B316

94LS/B317

94LS/B318

94LS/B319
TO F TO F TO F TO F
DRAWING TITLE DRAWING NO.
94LS/B317

94LS/B319
DRAWING CONTROL SHEET
94LS/B316

EE-383111

94LS/B318
/3D

/4D

/6D
/1D

TB3 TB3 TB3 TB3


12 12 12 12
/3D

/6D
/1D

RELAYING & METERING ONE LINE DIAGRAM EA-382856

/4D

NO
18 18 18 18

d SA
08/5A

08/6A

08/2D
08/1D

onalGri
D 3 3 3 3 D
B B B B

TS10

TS11
SHT.

SHT.

SHT.

SHT.
TS8

TS9

4 4 4 4

OF Nati
-R1 -R1
SHT.01/7D SHT.03/1D
94LS/B316
94LS/B319
TB1/1C

ARE THE SOLE PROPERTY


94LS/B317 94LS/B318
TB3 TB1/6C
TB2 74/94LS/B316 TB1/3C 74/94LS/B317 TB1/4C 74/94LS/B318 TB3 74/94LS/B319
/2D TB3 TB3 TB2
12 18 11 21 /2B TB2 11 21 /3B TB2 11 21 /5B 11 21 /6B
/6D
SHT.04/4C /3D /5D 12 18
14 16 18 28 12 18 18 28 12 18 18 28 18 28
SHT.04/5C
/1C SHT.04/4C SHT.04/5C 14 16
11 13 SPARE 14 16 SPARE 14 16 SPARE SPARE
16 16 16 /6C 16
15 15 15 11 13 15
SHT.06/1D /3C /4C
15 17 11 13 11 13 SHT.06/3B
17 SHT.06/1D 17 17 15 17 17
SHT.05/3C SHT.06/3A
22 28 15 17 15 17 SHT.05/5C
SHT.06/1D SPARE SHT.05/4C SPARE SPARE 22 28 SPARE
26 26 SHT.05/4C 26 26
24 26 25 22 28 25 22 28 25 25
SHT.06/3B
SPARE SHT.06/1E SHT.06/3B 24 26
21 23 27 24 26 27 24 26 27 27
SPARE
SPARE SPER1C1 SPARE SPER1C1 SPARE SPER1C1 21 23 SPER1C1
25 27 21 23 21 23
25 27
SPARE AS-BUILT BY DATE
SHT.07/5C SPARE SPARE
32 38 25 27 25 27 SHT.07/5C
SPARE SHT.07/5C SHT.07/5C 32 38 D 2017-01-03 AES REVISED AS PER CONSULTANT COMMENTS KAM AS AS

N
34 36 32 38 32 38

HEREI
SPARE
SPARE SPARE SPARE 34 36
31 33 34 36 34 36
E
31 33
SPARE E C 2016-11-24 AES AS MANUFACTURED KAM AS AS
SPARE SPARE SPARE
35 37 31 33 31 33 SPARE
SPARE SPARE SPARE 35 37 B 2016-01-07 AES AS PER CUSTOMER REQUIREMENTS KAM AS AS
42 48 35 37 35 37

NED
SPARE
SPARE SPARE SPARE 42 48
44 46 42 48 42 48 A 2015-10-12 AES ISSUED FOR DETAILED DESIGN KAM AS AS
SPARE

CONTAI
SPARE SPARE SPARE 44 46
41 43 44 46 44 46 SPARE
41 43 REV.
SPARE SPARE SPARE DATE BY DESCRIPTION CHKD. CERT. APPD.
45 47 41 43 NO.
41 43 SPARE
SPARE SPARE SPARE 45 47
52 58 45 47 45 47 DRAWING COMPLETION CERTIFICATE (DCC):
SPARE
SPARE SPARE SPARE 52 58

ON
54 56 52 58 52 58 SPARE

NFORMATI
SPARE SPARE SPARE 54 56
51 53 54 56 54 56 SPARE
SPARE SPARE SPARE 51 53
55 57 51 53 51 53 SPARE
SPARE SPARE SPARE 55 57
62 68 55 57 55 57 SPARE
SPARE SPARE SPARE 62 68
64 66 62 68 62 68

THE I
SPARE
SPARE SPARE SPARE 64 66 DINAKAR KAMAL NONE
DRAWN BY CHECKED BY SCALE:
61 63 64 66 64 66 SPARE
SPARE SPARE SPARE 61 63
61 63 2015-10-12
65 67 61 63 SPARE DATE STARTED DATE COMPLETED

SPARE SPARE SPARE 65 67


72 78 65 67 65 67

AND
SPARE OPR'G. DEPT. ENG. DEPT.
SPARE SPARE SPARE 72 78
F 74 76 72 78 72 78 SPARE
SPARE SPARE SPARE 74 76 F CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR
71 73 74 76 74 76

NG
SPARE
71 73 CONSTRUCTION OR FOR ORDERING
SPARE 7868FD SPARE SPARE

DRAW I
75 77 71 73 71 73 MATERIAL UNTIL CERTIFIED AND DATED BY DATE
SPARE 7868FD
SPARE SPARE SPARE 7868FD SPARE 75 77
85 87 7868FD
82 88 75 77 75 77 SPARE
SPARE DC ELEMENTARY DIAGRAM +UVLS.2
SPARE SPARE SPARE SPARE 82 88 85 87
SPARE SPARE
84 86 81 83 82 88 85 87 82 88 85 87
SPARE SPARE
SPARE
81 83
SPARE SPARE SPARE 84 86 81 83 13.8kV U/V LOAD SHEDDING PANEL-2

S
84 86 84 86 81 83

THI
AL-UQAIR 115/13.8kV SUBSTATION-A
MANUFACTURER/VENDOR NAME
AL-UQAIR SAUDI ARABIA
ALFANAR ELECTRICAL SYSTEMS CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
DRAWING NO. SHEET NO. REV. NO.
02
EA-383186 02 of 8 D 1 2 3 4 5 6 7
4400004656 3-1313003.03 P HA555 EA-383186 of
8 D
NG-A (2012/01)

DMS VECTOR NGA00