© & ryan ices CLARK DAVIS August 8, 2018 ‘Mr, Graham Gitespie HOLT Architects, P.C. 619 West Stnte Strent Iinaca, NY 14850 Re: Dewitt Library Structural Conditions Assessment Ithaca, New York Ryan Biggs | Clark Cavis Project 12005 ear Graham: [At your request, | made ste visits to the existing building at the comer of Court and Cayus Streets in thaca, New York The purpose of my visits was to perform observations to assess the physical condition of visible portions of the structure. ‘The existing building is slated for demotion in the near future to make way for a new housing siructure a the site. The bulding does not have power and has reportedly been abandoned for about three years. The roo'is leaking, and the bulding is being broken into and vandalized on ‘an ongoing basis. Widespread deterioration ofthe metal roof deck has occurred, Description and Backaround ‘The existing bulding was constructed in the late 1960s and served as a library for most of its life. The building is three stories with a ground, fist, and partial second-floor level. At the frst floor, there isa large open space in the mile of the building that extends two stories to the ‘oof. The second-loor wrars the perimeter ofthe building around this open space. Soe Figure 1 attached, ‘The structure consists of ste! framing with wide-lange beams supporting the flors and roofs. ‘Tho roof deck consists of 1¥%inch, 22-gauge steel deck, and it generally spans about 6 feet between steel beam suprorts, The floor structure consists of castin-place concrete slabs ‘supported by stee! beams. ‘There are reportedly hazarious materials (asbestos) in localized areas ofthe roof and calling, Since there are obvious signs of deterioration of the metal roof deck, the Contractor and Developer planning the demolition work would ike to know I the building Interior is safe to ‘acoess and whether the roct is safe to work on top of. | visited the site on July 24,2018 to make preliminary observations. | retuned tothe site on July 31 to dotermine locations ef localized celing removal in order to observe the underside of the ‘metal deck. On August 7, Iperformed the observations from a lift and ladder. | was met by you, heroes cen Srimeenae Ore eirantec roma ‘haute Pomae ‘amen posecn | siemens Wiliam Johnson from Delta Engineers, Architects, and Land Surveyors, and Richard Bruckner {rom LaChase Construction, Prior to observations froma lit, we performed an analysis of the existing frstloor structure to {determine if a Genie (GS-25322) sel-propelied scissor lit could be used to access the celing in the two-story open space, We determined that the concrete floor slab and supporting steel beams are structurally capable of supporting this Ii. Observations Observations were conducted primarily from the floors of the building, from a ladder, and from a scissor It The larder was used atthe second floor, and tha lift was taxa a th fet flan inthe open space 10 access the ceiling of the two-story’ space. Observations were limited to what could be seen at openings that were made in the celing and other areas where the structure ‘was readily visible. No physical testing or analysis was performed other than for the load of a scissor lit operating on the first-oor structure as mentioned above, The existing metal deck is generally in poor condition with widespread flaking rust visible atthe Underside. The deck is painted and likely has a galvanized coating, though this was not verified. ‘See Photographs 1 and 2. Photograph 1 Photograph 2 The center section ofthe celing at the two-story open area consists of metal fins that hang down. The underside of the metal deck is visible through this cong system. Rust fakes from the metal deck have fallen down onto the floor through the metal fn ceing. See Photograph 3. Photograph 3 In many areas, there is advanced rusting atthe metal deck side laps, which are locations where the individual sheets of deck interface parallel tothe deck span. See Photograph 4. Photograph 4 games earns rms eet Scheer ie

You might also like