BUILDING PART TOTAL VOLUME CEMENT SAND GRAVEL

COLUMN FOOTING
FOOTING 1 7.546 67.914 3.773 7.546
FOOTING 2 20.3665 183.2985 10.18325 20.3665
FOOTING 3 16.9785 152.8065 8.48925 16.9785
WALL FOOTING 44.891 404.019 22.4455 44.891
WALL FOOTING 1 8.016 72.144 4.008 8.016
WALL FOOTING 2 9.4095 84.6855 4.70475 9.4095

17.4255 156.8295 8.71275 17.4255

COLUMNS
COLUMN 1 13.86 124.74 6.93 13.86
COLUMN 2 13.86 124.74 6.93 13.86
COLUMN 3 13.86 124.74 6.93 13.86
41.58 374.22 20.79 41.58

GIRDERS
GIRDER 1 4.1 36.9 2.05 4.1
GIRDER 2 4.1 36.9 2.05 4.1
GIRDER 3 3.28 29.52 1.64 3.28
GIRDER 3A 0.82 7.38 0.41 0.82
GIRDER 4 0.42 3.78 0.21 0.42
GIRDER 5 1.65 14.85 0.825 1.65
GIRDER 6 1.89 17.01 0.945 1.89
GIRDER 7 7.425 66.825 3.7125 7.425
ROOF GIRDER 1 9.84 88.56 4.92 9.84
ROOF GIRDER 1a 1.848 16.632 0.924 1.848
ROOF GIRDER 2 7.26 65.34 3.63 7.26

BEAMS
BEAM 1 3.28 29.52 1.64 3.28
BEAM 2 0.576 5.184 0.288 0.576
CANTILEVER BEAM 0.4 3.6 0.2 0.4
STAIRWELL BEAM 1 0.664 5.976 0.332 0.664
STAIRWELL BEAM 2 0.82 7.38 0.41 0.82
TIE BEAM 1 3.465 31.185 1.7325 3.465
TIE BEAM 2 10.89 98.01 5.445 10.89
TIE BEAM 3 18.45 166.05 9.225 18.45
81.178 730.602 40.589 81.178

SLABS
SLAB 1 19.68 177.12 9.84 19.68
SLAB 2 9.6 86.4 4.8 9.6
SLAB ON FILL, CORRIDOR, RAMP 44.21 397.89 22.105 44.21
73.49 661.41 36.745 73.49

STAIRS 6.81102 61.29918 3.40551 6.81102

TOTAL
265.37552
CONCLUSION