KOCHI KOOTANAD BANGALORE MANGALORE PIPELINE PROJECT

PHASE -II - (SECTION-I)


CHAINAGE (0.000 KM to 90.615 KM)

DAILY PROGRESS REPORT (PIPE LINE)


CLIENT GAIL (INDIA) LIMITED
CONSULTANT MECON LTD
CONTRACTOR IL&FS ENGINEERING AND CONSTRUCTION COMPANY LIMITED
FOA No./ LOA No. GAIL/NOIDA/C&P/PROJ/KKBMPL-II/LAYING/016-002/28 DATED 05 Sep-16
CONTRACTUAL MECHANICAL COMPLETION : 04-Sep-2018
COMPLETION DATE COMMISSIONING & GAS-IN : 04-Nov-2018

Executed by
HDD by Available Work
S.No Activity Description UOM Scope Revised Scope Previous Since Previous
Others Front contractor
A B C D E F=D-E G H I
1 ROU Boundary Marking* Mtr 96,826.00 6,220.00 90,606.00 90,606.00 21,217.00 69,389.00

2 ROU front availability for Cleaning and Grading Mtr 96,826.00 6,220.00 90,606.00 90,606.00 19,464.00 71,142.00

Nos 7,989 523 7,466 7,466 1,761 5,705


3 Line Pipe Received
Mtr 96,826.00 6,220.00 90,606.00 90,606.00 19,464.00 71,142.00

Nos 8,206 523 7,683 7,683 1,962 5,733


4 Stringing
Mtr 96,826.00 6,220.00 90,606.00 90,606.00 20,457.00 70,195.00
5 Installaiton of Bends Nos 550 550 550 35 500

Nos 8,206 523 7,683 7,683 1,528 6,113


6 Total Welding (Main Line & Tie-in)
Mtr 96,826.00 6,220.00 90,606.00 90,606.00 18,354.00 71,982.00
Nos 3,743 3,743 3,743 936 2,862
6.a Mainline Welding (12.7 Thk Pipe)
Executed by
HDD by Available Work
S.No Activity Description UOM Scope Revised Scope Previous Since Previous
Others Front contractor
6.a Mainline Welding (12.7 Thk Pipe)
Mtr 49,575.00 49,575.00 49,575.00 12,168.00 36,994.00
Nos 4,296 523 3,773 3,773 589 3,257
6.b Mainline Welding (15.9 Thk Pipe)
Mtr 47,251.00 6,220.00 41,031.00 41,031.00 6,186.00 34,816.45
6.c Tie-in Welding Nos 167 167 167 11 136
7.1 NDT Status for Welding - - - -
7.1.a Fresh Taken Nos 8,206 523 7,683 7,683 1,515 6,110
7.1.b Fresh Interpreted… Nos 8,206 523 7,683 7,683 1,515 6,110
7.1.c Fresh Accepted…… Nos 8,206 523 7,683 7,683 1,515 5,531
7.1.d Repair Joints………. Nos - - - - 397
7.1.e Others (RT,RS,CS,GRS etc.) Nos - - - 203
7.1.f Accepted after - - -
7.1.g Repair Nos - - 424
7.1.h Others (RT,RS,CS,GRS etc.) Nos - - 163
7.1.i Total Accepted Nos 8,206 523 7,683 7,683 1,515 6,118

8 Joint Coating Nos 8,206 523 7,683 7,683 1,515 6,112

9 Trenching including HDD and other crossing Mtr 96,826.00 6,220.00 90,606.00 90,606.00 11,932.00 77,575.00

10 Holiday Testing & Lowering including HDD and Mtr 96,826.00 6,220.00 90,606.00 90,606.00 11,932.00 77,301.82
other crossing
11 Cased Crossing Nos 6 0 6 6 6

11 Un-Cased Crossing Nos 50 0 50 50 10 40


Executed by
HDD by Available Work
S.No Activity Description UOM Scope Revised Scope Previous Since Previous
Others Front contractor

12 HDPE Duct Laying Mtr 96,826.00 6,220.00 90,606.00 90,606.00 10,344.29 76,499.00

13 OFC Blowing Mtr 96,826.00 6,220.00 90,606.00 90,606.00 50,066.00

14 Backfilling including HDD and other crossing Mtr 96,826.00 6,220.00 90,606.00 90,606.00 9,813.00 76,457.00

15 Cleaning & Gauging Mtr 96,826.00 6,220.00 90,606.00 90,606.00 38,874.00


16 Hydrotesting Mtr 96,826.00 6,220.00 90,606.00 90,606.00 38,874.00
17 Installation of Markers Nos 1,242 1,242 1,200 220.00
18 Clean Up & Restoration Mtr 96,826.00 6,220.00 90,606.00 90,606.00 84,776
19 TLP Inst. Nos 144 144 102 70

20 Soil Filling Cum 83,400 83,400 83,400 37,363.74

21 HDD Crossing 22 10 12 9 1 11
A Pond Crossing (Ch-5.5) Mtr 511 511 511.00
B Periyar River (Ch-10.7) Mtr 624 624 624.00
C Uzhattu Puzha Crossing (Ch-11.84) Mtr 317 317 317
D Creek Crossing (Ch-13.123) Mtr 325 325 325
E Unlined Canal Crossing (Ch-41) Mtr 608 608 608.00
F Crossing (Ch-45) Mtr 343 343 343
G Crossing (Ch-14.5) Mtr 412 412 412
H Unlined Canal Crossing (Ch-59.1) Mtr 282 282 282
I Canal Crossing (Ch-61) Mtr 230 230 230
J Canal Crossing (Ch-71.6) Mtr 497 497 497
K Nala Crossing (Ch-10) Mtr 96 96 96.00
Today' s HIGHLIGHTS
Lighting Fixtures and Ceiling Fan Installation under Progress at IP-1
Executed by
HDD by Available Work
S.No Activity Description UOM Scope Revised Scope Previous Since Previous
Others Front contractor

CRITICAL ISSUES / HOLD UPS

Miscellaneous Progress

PMC comments

Area of Concern - Action By


RE MANGALORE PIPELINE PROJECT
-II - (SECTION-I)
00 KM to 90.615 KM)

GRESS REPORT (PIPE LINE)


REPORT NO 691
REPORT DATE 24-Oct-2018
PROGRESS DATE 24-Oct-2018
WEATHER Sunny

Cumulative for Overall


Today's Remarks
ILFS Cumulative

J K=(I+J) L=(H+K)
- 69,389.00 90,606.00

- 71,142.00 90,606.00 -

- 5,705.31 7,466
- 71,142.00 90,606.00 -
- 5,733.00 7,695

- 70,195.00 90,652.00
- 500.00 535.00

1 6,114 7,642 1 jt at Ch:21

12 71,994.00 90,348.00
1 2,863 3,799
Cumulative for Overall
Today's Remarks
ILFS Cumulative

12 37,006.00 49,174.00
- 3,257 3,846
- 34,816.45 41,002.45
- 136 147
- - -
- 6,110 7,625
- 6,110 7,625
- 5,531 7,046
- 397 397
- 203 203
- - -
- 424 424
- 163 163
- 6,118 7,633

6,112 7,627

- 77,575.00 89,507.00

- 77,301.82 89,233.82

- 6 6

- 40 50
Cumulative for Overall
Today's Remarks
ILFS Cumulative

- 76,499.00 86,843.29

- 50,066.00 50,066.00

- 76,457.00 86,270.00

- 38,874.00 38,874.00
- 38,874.00 38,874.00
- 220.00 220.00
- 84,776.00 84,776.00
- 70 70

- 37,363.74 37,363.74

0 11 12
- 511.00 511.00 Completed
- 624.00 624.00 Completed
317 317 Completed
325 325 Completed
608.00 608.00 Completed
343 343 Completed
412 412 Completed
282 282 Completed
230 230 Completed
497 497 Completed
- 96.00 96.00 Completed
Cumulative for Overall
Today's Remarks
ILFS Cumulative
Gr. Total
S.No Activity Description UOM Since
Scope Today's Cumu.
Previous
II STATION PIPING WORK
1 Fit up ID 8,893 7,939.55 - 7,939.55
2 Welding ID 8,893 7,936.75 - 7,936.75
3 Erection IM 10,965.00 9,507.80 - 9,507.80
4 NDT ID 8,893.00 7,935.55 - 7,935.55
5 Equipment Erection MT 290.00 290.00 - 290.00
6 Hydrotesting Loops NOS 14.00 1.00 - 1.00
DT SV-01
Since Since
Scope Today's Cumu. Scope Today's Cumu. Remarks
Previous Previous

1,750.00 1,390.00 - 1,390.00 711.00 624.50 - 624.50


1,750.00 1,390.00 - 1,390.00 711.00 624.50 - 624.50
2,000.00 1,700.00 1,700.00 920.00 844.00 - 844.00
1,750.00 1,390.00 - 1,390.00 711.00 624.50 - 624.50
150.00 150.00 - 150.00 - - - -
2.00 - - - 2.00 - - -
SV-02 SV-03
Since Since
Scope Today's Cumu. Remarks Scope Today's Cumu.
Previous Previous

799.00 799.00 - 799.00 711.00 695.00 - 695.00


799.00 799.00 - 799.00 711.00 695.00 - 695.00
1,035.00 1,034.00 - 1,034.00 920.00 915.00 - 915.00
799.00 799.00 - 799.00 711.00 695.00 - 695.00
- - - - - - - -
2.00 1.00 - 1.00 2.00 - - -
SV-04 SV-05
Since Since
Scope Previous Today's Cumu. Remarks Scope Today's Cumu.
Previous

711.00 399.75 - 399.75 711.00 675.50 675.50


711.00 399.75 - 399.75 711.00 672.70 672.70
920.00 - - - 920.00 915.00 915.00
711.00 398.75 - 398.75 711.00 672.50 - 672.50
- - - - - - - -
2.00 - - - 2.00 - - -
IP
Since
Scope Today's Cumu. Remarks
Previous

3,500.00 3,355.80 - 3,355.80


3,500.00 3,355.80 - 3,355.80
4,250.00 4,099.80 - 4,099.80
3,500.00 3,355.80 - 3,355.80
140.00 140.00 - 140.00
2.00 - - -
CLIENT GAIL (INDIA) LIMITED
CONSULTANT MECON LTD
CONTRACTOR IL&FS ENGINEERING AND CONSTRUCTION COMPANY LIMITED
FOA No./ LOA No. GAIL/NOIDA/C&P/PROJ/KKBMPL-II/LAYING/016-002/28 DATED 05 Sep-2016
CONTRACTUAL
COMPLETION DATE MECHANICAL COMPLETION : 04-Sep-2018
COMMISSIONING & GAS-IN : 04-Nov-2018
Gr. Total
S.No Activity Description UOM Since
Scope Today's
Previous
II STATION CIVIL WORK
A General Civil
1 Tree Cutting Nos 103.00 81.00 -
2 Soil Filling / Site Grading Cum 19,563.00 6,204.50 -
B Compound Wall - - -
1 Piling Work (CR,GR,CW) Nos 158.00 158.00 -
1 Excavation Cum 5,195.44 4,874.00 -
2 PCC Cum 274.58 271.62 -
3 RCC Sub Structure Cum 1,005.80 884.30 -
4 RCC Super Structure Cum 325.84 299.03 -
5 Solid Block Masonry Cum 1,247.59 250.04 -
6 Plastering (Inside & outside) Sqm 11,623.15 6,287.98 15.00
7 Painting (Inside & outside) Sqm 11,623.15 - -
8 Y angle fixing Nos 539 287.00 -
9 Barbed Wire fixing RM 1,478.00 - -
10 Main Gate Fabrication KG 5,650.00 - -
11 Main Gate Fixing Nos 6 - -
C Control Building - - -
C.1 Structure Work - - -
1 Excavation Cum 1,768.75 1,512.75 -
2 PCC Cum 235.21 234.34 -
3 RCC Sub Structure Cum 475.64 475.04 -
4 RCC Super Structure Cum 592.58 592.58 -
5 Cable Trench RM 69.38 59.39 -
6 Checker Plate Fixing for Cable Trench MT 160.00 - -
7 Stair Case Fabrication, & Installation MT 9.50 - -
C.2 Architecture Work - - -
1 Block Work Cum 533.40 512.61 -
2 Plastering (Inside & outside) Sqm 5,686.72 5,151.14 -
3 Roof Treatment Sqm 1,300.00 1,121.00 -
4 Heavy duty Tiles /Concrete Flooring Cum 930.00 834.26 -
5 Acid Proof Floor/Wall Tiles Fixing Sqm 680.00 182.05 -
6 False Ceiling Sqm 280.00 - -
7 Fixing of Doors Nos 41 - -
8 Fixing of Windows Nos 55 - -
9 Fixing of Ventilators Nos 5 - -
10 Plinth Protection Sqm 438.00 67.03 -
11 Painting (Inside & outside) Sqm 3,930.26 700.00 -
12 Final Painting (Inside & outside) Sqm 2,176.00 - -
13 Wash Basin Fixing Nos 11 - -
14 Inst. Urinal Nos 2 - -
15 Inst. W.C Nos 4 - -
D Guard Room - - -
D.1 Structure Work - - -
1 Excavation Cum 432.55 432.55 -
2 PCC Cum 31.61 26.79 -
3 RCC Sub Structure Cum 73.18 73.35 -
4 RCC Super Structure Cum 67.77 44.84 -
5 Stair Case Fabrication, & Installation MT 5.40 - -
D.2 Architecture Work - - -
1 Block Work Sqm 128.35 118.31 -
2 Plastering (Inside & outside) Sqm 1,160.24 1,136.71 -
3 Roof Treatment Sqm 185.25 130.00 -
4 Floor/Wall Tiles Fixing Sqm 492.00 160.78 -
5 Fixing of Doors Nos 18 - -
6 Fixing of Window/Ventilators Nos 30 - -
7 Plinth Protection Sqm 156.00 16.00 -
8 Painting (Inside & outside) Sqm 1,104.00 - -
9 Final Painting (Inside & outside) Sqm 1,308.00 - -
D.3 Plumbing Work - - -
1 Sanitary & Plumbing Works LS 6.00 - -
2 Wash Basin Fixing Nos 6 - -
3 WC Fixing Nos 6 - -
4 Over head Tank fixing Nos 12 - -
5 Construction of Septic Tank Nos 6 2.00 -

6 Construction of Soak Pit Nos 6 1.00 -

7 Construction of Inspection Chamber Nos 6 - -


E Storm Water Drainage - - -
1 Excavation Cum 763.00 21.00 -
2 PCC Cum 91.36 4.30 -
3 RCC / RR Masonary Cum 298.02 8.00 -
F RCC Pavement - - -
1 Excavation Cum 401.00 15.00 -
2 PCC Cum 246.59 125.00 -
3 RCC Cum 468.47 143.45 -
4 Paver Block Fixing Sqm 310.40 - -
G Road Crossings ERC and IRC - - -
1 ERC Nos 7 - -
2 IRC Nos 7 - -
H Process Area/Miscellaneous - - -
J.1 RCC Pipe Supports - - -
1 Excavation Cum 1,540.00 49.50 -
2 PCC Cum 380.00 146.37 -
3 RCC Cum 875.00 300.95 -
4 Operating /Cross Over Platforms MT 11.00 - -
5 Valve Pit Nos 5 - -
6 Hand Rail Rm 236.00 - -
7 Grating Sqm 48.00 - -
Structural Painting of platform /Cross Over
8 MT 11.00 - -
( Including Hand Rail)
Miscellaneous Progress
05 Sep-2016

otal DT SV-01
Since Since
Cumu. Scope Today's Cumu. Scope Today's
Previous Previous

81.00 - -
10,846.17 - 1563 1563
-
158.00 - -
4,874.00 - 1,500.00 1,471.00 -
271.62 - 27.02 27.40 -
884.30 - 122.90 117.53
299.03 - 60.00 57.79 -
965.33 - 149.95 57.64 -
6,302.98 - 1,781.32 447.77 -
- - 1,781.32 -
287.00 - 73.00 28.00 -
- - 190.00
- - 900.00
- - 1.00
-
-
1,512.75 266.00 266.00 -
234.34 32.57 32.57 -
475.04 71.11 71.11 -
592.58 89.75 89.75 -
59.39 4.00 4.00 -
- 23.00
- 1.50
-
512.61 53.39 53.39 -
5,151.14 770.27 770.27 -
1,121.00 - 192.00 205.00 -
834.26 170.00 170.00 -
182.05 100.00
- 36.00
- 5.00
- 8.00
- -
67.03 70.00 30.00 -
700.00 577.98 400.00 -
- 320.00
- 1.00
- -
- -
-
-
432.55 - 63.00 63.00 -
26.79 4.68 4.68 -
73.35 14.80 14.80 -
65.75 12.61 12.61 -
- 0.90
-
118.31 20.13 20.13 -
1,136.71 176.93 176.93 -
130.00 26.00 26.00 -
160.78 82.00
- 3.00
- 5.00
16.00 26.00
- 184.00
- 218.00
-
- - 1.00
- - 1.00
- 1.00
- 2.00
2.00 1.00

1.00 1.00

- 1.00
-
21.00 90.00
4.30 10.60
8.00 31.00
-
15.00 - 50.00
125.00 23.59 30.00 - 30.00 25.00
143.45 83.97 48.00 - 48.00 37.50
- 47.00
-
- - 1.00
- - 1.00
-
-
49.50 - 168.00
146.37 10.00 10.00 10.00 12.00
308.91 250.00 35.97 - 35.97 20.00
- 1.00
- - 1.00
- - 36.00
- - 4.00

- - 1.00
KOCHI KOOTANAD BANGALORE MANGAL
PHASE -II - (SECTION
CHAINAGE (0.000 KM to 90

DAILY PROGRESS REPOR

SV-01 SV-02
Since
Cumu. Remarks Scope Today's Cumu. Remarks Scope
Previous

78
1,563.00 Comp. 1962

- -
1,471.00 758.94 758.00 - 758.00 777.96
27.40 50.03 50.03 50.03 27.53
117.53 133.00 131.30 - 131.30 107.21
57.79 30.00 27.98 - 27.98 25.42
57.64 104.00 62.69 - 62.69 128.51
447.77 1,158.20 771.78 - 771.78 1,775.22
- 1,158.20 1,775.22
28.00 72.00 65.00 - 65.00 75.00
170.00 215.00
900.00 900.00
1.00 1.00

266.00 457.28 457.28 - 457.28 Comp. 301.99


32.57 53.55 53.55 - 53.55 25.60
71.11 70.50 70.50 - 70.50 58.18
89.75 79.38 79.38 - 79.38 85.36
4.00 24.20 24.20 - 24.20 13.50
23.00 23.00
1.50 1.50

53.39 78.86 78.86 - 78.86 59.26


770.27 664.64 664.64 - 664.64 761.61
205.00 196.00 196.00 - 196.00 192.00
170.00 140.00 130.36 - 130.36 200.00
- 100.00 100.00
- 36.00 36.00
- 5.00 5.00
- 8.00 8.00
- - -
30.00 70.00 1.45 - 1.45 70.00
400.00 577.98 577.98
320.00 320.00
1.00 1.00
- -
- -

63.00 85.00 85.00 85.00 Complete 75.00


4.68 4.48 4.68 - 4.68 5.72
14.80 14.80 14.80 - 14.80 15.29
12.61 16.93 16.93 - 16.93 7.51
0.90 0.90

20.13 26.45 26.45 - 26.45 14.80


176.93 196.93 196.93 - 196.93 138.73
26.00 26.00 26.00 26.00 26.00
82.00 50.00 - 50.00 82.00
3.00 - 3.00
5.00 - 5.00
26.00 16.00 16.00 26.00
184.00 - 184.00
218.00 - 218.00
-
1.00 - 1.00
1.00 - 1.00
1.00 - 1.00
2.00 - 2.00
1.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00

1.00 - 1.00

83.00 21.00 21.00 75.00


9.96 4.30 4.30 9.00
28.22 8.00 8.00 25.50

58.00 - 42.00
29.00 - 21.00
43.50 - 31.50
50.40 - 47.00

1.00 - 1.00
1.00 - 1.00

168.00 - 168.00
12.00 - 12.00
20.00 3.06 - 3.06 20.00
1.00 1.00
1.00 1.00
36.00 36.00
4.00 4.00

1.00 1.00
ANGALORE MANGALORE PIPELINE PROJECT
PHASE -II - (SECTION-I)
AGE (0.000 KM to 90.615 KM)

ILY PROGRESS REPORT (CIVIL)

SV-03 SV-04
Since Since
Today's Cumu. Remarks Scope
Previous Previous

78 78 Comp. 20 0
383 - 383 4452.8 3013.24

158.00 158.00
497.00 - 497.00 669.89 660.00
23.79 - 23.79 50.00 49.70
73.00 - 73.00 187.34 140.00
25.56 - 25.56 25.42 10.30
53.17 - 53.17 250.00 239.87
1,326.32 - 1,326.32 1,532.38 318.58
- - - 1,532.38 -
43.00 - 43.00 65.00 -
185.00 -
900.00 -
1.00 -

301.99 - 301.99 351.00 95.00


25.60 - 25.60 49.87 49.00
58.18 - 58.18 140.60 140.00
85.36 - 85.36 75.00 75.00
13.50 - 13.50 9.99 -
23.00 -
1.50 -

59.26 - 59.26 80.00 59.22


761.61 - 761.61 915.00 379.42
192.00 - 192.00 192.00 -
166.50 - 166.50 80.00 -
100.00 100.00 100.00 -
36.00 -
5.00 -
8.00 -
- -
70.00 -
- - 577.98 -
320.00 -
1.00 -
- -
- -

75.00 - 75.00 95.00 95.00


5.72 - 5.72 7.00 2.88
15.29 15.29 13.70 13.87
7.51 - 7.51 9.72 8.59
0.90 -

14.80 - 14.80 38.00 28.00


138.73 - 138.73 152.00 115.00
26.00 - 26.00 55.25 -
73.00 - 73.00 82.00 -
3.00 -
5.00 -
26.00 -
184.00 -
218.00 -

1.00 -
1.00 -
1.00 -
2.00 -
1.00 1.00 1.00 -

1.00 -

1.00 -

95.00 -
11.40 -
32.30 -

48.00 -
24.00 -
36.00 -
77.00 -

1.00 -
1.00 -

168.00 -
12.00 -
20.00 -
1.00 -
1.00 -
36.00 -
4.00 -

1.00 -
SV-04 SV-05
Since
Today's Cumu. Remarks Scope Today's Cumu.
Previous

- 3 3 3.00
3,013.24 2034.5 43.23 - 43.23

- 158.00 -
- 660.00 442.65 442.00 - 442.00
- 49.70 50.00 50.00 - 50.00
- 140.00 127.99 127.44 - 127.44
- 10.30 65.00 64.82 - 64.82
- 239.87 230.00 220.62 - 220.62
15.00 333.58 1,690.04 1,571.76 - 1,571.76
- 1,690.04 - -
- 74.00 63.00 - 63.00
- 218.00 - -
- 900.00 - - -
- 1.00 - -

- 95.00 132.48 132.48 - 132.48


- 49.00 33.25 33.25 - 33.25
- 140.00 39.55 39.55 - 39.55
- 75.00 90.63 90.63 - 90.63
- 8.95 8.95 8.95
- 23.00 - -
- 1.50 - -

- 59.22 81.64 81.64 - 81.64


- 379.42 1,065.67 1,065.67 - 1,065.67
- 192.00 192.00 192.00
- 170.00 166.71 - 166.71
- 100.00 55.80 55.80
- 36.00 - -
- 5.00 - -
- 8.00 - -
- - - -
- 70.00 - -
- 577.98 - -
- 320.00 - -
- 1.00 - -
- - - -
- - - -

- 95.00 74.05 74.05 - 74.05


- 2.88 3.73 3.73 - 3.73
- 13.87 7.66 7.66 - 7.66
- 8.59 12.00 11.19 - 11.19
- 0.90 - -

28.00 16.97 16.97 - 16.97


- 115.00 175.65 175.65 - 175.65
- 26.00 26.00 26.00
- 82.00 6.78 - 6.78
- 3.00 - -
- 5.00 - -
- 26.00 - -
- 184.00 - -
- 218.00 - -

- 1.00 - -
- 1.00 - -
- 1.00 - -
- 2.00 - -
- 1.00 - -

- 1.00 - -

- 1.00 - -

- 90.00 - -
- 10.80 - -
- 36.00 - -

- 48.00 - -
- 24.00 - -
- 36.00 0.45 - 0.45
- 47.00 - -

- 1.00 - -
- 1.00 - -

- 168.00 9.50 - 9.50


- 12.00 - -
- 20.00 4.92 - 4.92
- 1.00 - - -
- 1.00 - -
- 36.00 - -
- 4.00 - -

- 1.00 - -
REPORT NO
REPORT DATE
PROGRESS DATE
WEATHER

IP

Remarks Scope Since Previous Today's Cumu. Remarks

2 0 - -
9550.7 5,843.70 - 5,843.70

-
1,046.00 1,046.00 - 1,046.00 Comp.
70.00 70.70 - 70.70 Comp.
327.36 295.03 - 295.03
120.00 112.58 - 112.58
385.12 331.35 - 331.35
3,686.00 1,851.77 - 1,851.77
3,686.00 - - -
180.00 88.00 - 88.00
500.00 - -
1,150.00 - -
1.00 - -

Comp. 260.00 260.00 - 260.00 Comp.


40.37 40.37 - 40.37
95.70 95.70 - 95.70
172.46 172.46 - 172.46
8.74 8.74 - 8.74
45.00 - -
2.00 - -

180.25 180.24 - 180.24


1,509.53 1,509.53 - 1,509.53
336.00 336.00 - 336.00
170.00 200.69 200.69
180.00 26.25 - 26.25
100.00 - -
16.00 - -
15.00 - -
5.00 - -
88.00 35.58 - 35.58
1,040.36 300.00 - 300.00
576.00 - -
6.00 - -
2.00 - -
4.00 - -

Comp. 40.50 40.50 - 40.50


Comp. 6.00 5.10 - 5.10
6.93 6.93 - 6.93
9.00 8.92 - 8.92
0.90 - -

12.00 11.96 - 11.96


320.00 333.47 - 333.47
26.00 26.00 - 26.00
82.00 31.00 - 31.00
3.00 - -
5.00 - -
26.00 - -
184.00 - -
218.00 - -

1.00 - -
1.00 - -
1.00 - -
2.00 - -
1.00 - -

1.00 - -

1.00 - -

330.00 - -
39.60 - -
145.00 - -

155.00 15.00 - 15.00


100.00 95.00 - 95.00
200.00 95.00 - 95.00
42.00 - -

2.00 - -
2.00 - -

700.00 40.00 - 40.00


310.00 136.37 - 136.37
525.00 264.96 - 264.96
6.00 - -
- - -
56.00 - -
28.00 - -

6.00 - -
691
24-Oct-2018
24-Oct-2018
Sunny

Remarks
KOCHI KOOTANAD BANGALORE MANGALORE P
PHASE -II - (SECTION-I)
CHAINAGE (0.000 KM to 90.615 K

DAILY PROGRESS REPORT (MANPOWER DEPLOYMEN


CLIENT GAIL (INDIA) LIMITED
CONSULTANT MECON LTD
CONTRACTOR IL&FS ENGINEERING AND CONSTRUCTION COMPANY LIMITED
FOA No./ LOA No. GAIL/NOIDA/C&P/PROJ/KKBMPL-II/LAYING/016-002/28 DATED 05 Sep-20
MECHANICAL COMPLETION : 04-Sep-2018
CONTRACTUAL COMPLETION DATE COMMISSIONING & GAS-IN : 04-Nov-2018

Total Requirement as
SL.No. Category per contract

1 Resident Construction Manager/ Project Manager 1

2 Section Incharge 1

3 Planning Engineer 2

4 QA/ QC Engineer 1

5 Safety Officer 1

6 Surveyor 2

7 Welding/NDT Engineer 4

8 Discipline Engineer's (Civil / Mech / Welding / Elec / Instrn.) (6/6/2/2) 15

9 Foreman/Supervisor 30

10 Civil surveyor / liaison team (2/2) 4

11 Document controller / Account Officer (for line pipe) (1/1) 2

12 Store keeper / store in-charge (1/1) 2

13 Welder (Manual / Semi Auto / Automatic) 45

14 Fitter 20

15 Grinder 50

16 Machine operator 40

17 Blast cleaning crew 4

18 Electrician / Machine mechanic (12/10) 22

19 Rigger 50
20 Drivers 40

21 Pipe Bending 2

22 Rock breaker crew As Required

23 Thrust/ Hor. Auger Boring crew 2

24 X-ray / Gamma Ray crew (5/3) 8

25 Hydrotesting crew 3

26 Field joint coating crew 4

27 Holiday testing crew 6

28 HDD Crew 2

29 OFC jointing crew 2

30 Civil survey crew (with equipment) 1

31 Station civil works (carpenter/bar-bender/mason/fitter etc.) As Required

32 Unskilled workers 200

33 Station mechanical, pre-fabrication / erection crew 3

34 Supporting Staff (P&M, HR/Admin,IT, A/c Dept.) As Required


Total 569
GALORE MANGALORE PIPELINE PROJECT
ASE -II - (SECTION-I)
(0.000 KM to 90.615 KM)

ANPOWER DEPLOYMENT STATUS)


REPORT NO 691
REPORT DATE 24-Oct-2018
MPANY LIMITED PROGRESS DATE 24-Oct-2018
16-002/28 DATED 05 Sep-2016

Total Requirement as Total Available at Remarks


per contract Site

1 1

1 1

2 3

1 1

1 1

2 1

4 2

15 10

30 4

4 1

2 2

2 2

45 4

20 2

50 4

40 10

4 0

22 1

50 9
40 5

2 0

As Required 0

2 0

8 3

3 0

4 0

6 0

2 0

2 0

1 1

As Required 23

200 28

3 4

As Required 11
569 134
KOCHI KOOTANAD BANGALORE MANGALORE PIPELINE PROJECT
PHASE -II - (SECTION-I)
CHAINAGE (0.000 KM to 90.615 KM)

DAILY PROGRESS REPORT (EQUIPMENT DEPLOYMENT STATUS)


CLIENT GAIL (INDIA) LIMITED REPORT NO 691
CONSULTANT MECON LTD REPORT DATE 24-Oct-2018
CONTRACTOR IL&FS ENGINEERING AND CONSTRUCTION COMPANY LIMITED PROGRESS DATE 24-Oct-2018
FOA No./ LOA No. GAIL/NOIDA/C&P/PROJ/KKBMPL-II/LAYING/016-002/28 DATED 05 Sep-2016
MECHANICAL COMPLETION : 04-Sep-2018
CONTRACTUAL COMPLETION DATE COMMISSIONING & GAS-IN : 04-Nov-2018

Requirement as
Total Requirement as per MCEDS End of Total Deployed at
SL.No. Category per contract Site Remarks
18th Month

1 EXCAVTOR/BACKHOE EX-280 & ABOVE 3 3 3


2 EXCAVTOR/BACKHOE EX-200 & ABOVE 4 4 21
3 HYDRA (8-10 MT) 2 2 2
6 DG WELDING MACHINE 8 8 11 34 Welding Rectifiers
7 SEMI AUTO WELDING MACHINE 8 8 8
8 BEVEL CUTTING MACHINE-MANNUAL 1 1 5
9 PIPE BENDING MACHINE 1 1 1

10 HORIZONTAL AUGER BORING MACHINE WITH ROCK BRAKING TOOL 1 1 1 Additional 2 nos Jack pushing Boring equipment
available at site
11 PIPE CLAMP (PNUMATIC/HYDRAULIC)-INTERNAL 2 2 2
12 PIPE CLAMP- EXTERNAL 2 2 14

13 HDD RIG WITH ALL EQUIPMENT & ACCESSIORIES 1 1 0 ALL HDDs are completed

14 X-RAY MACHINE - INTERNAL CRAWLER 1 1 1


15 X-RAY MACHINE - EXTERNAL 2 2 3
16 GAMMA SOURCE 1 1 1
17 MANUAL UT MACHINE 2 2 2
18 WATER LIFTING PUMP (400M3/HR) 2 2 2
19 FILLING PUMP (400TO 1000 M3/HR) 2 2 3
20 PRESURIZING PUMP-MOTORIZED 1 1 2

21 INDUCTION/RESISTANCE HEATING EQUIPMENT OR LPG MULTI TORCH 2 2 12

22 AIR COMPRESSOR - (300CFM) 2 2 2


23 AIR COMPRESSOR - (450/600/800 CFM) 1 1 1
24 AIR COMPRESSOR - (1000-1500 CFM) 1 1 1
25 DG SET - 62.5 KVA TO 200 KVA (INCLUSIVE OF GENRATOR) 6 6 6
26 BLAST CLEAING MACHINE 2 2 4
27 DEWATERING PUMP 2 2 22
28 HOLIDAY DETECTOR UNIT 2 2 5
29 MOBILE WORKSHOP 2 2 2
30 PIPE TRAILER 10 10 10
31 DEAD WT TESTER 1 1 1
32 PIPE/CABLE LOCATOR 1 1 1
33 DOZING PUMP 1 1 1
34 MONO DRILL CRAWLER MOUNTED FOR ROCK BLASTING 4 4 4
35 HAND DRILL (PNEUMATIC) FOR ROCK BLASTING 6 6 6
KOCHI KOOTANAD BANGALORE MA
PHASE -II - (SE
CHAINAGE (0.000 KM

Next day Program


CLIENT GAIL (INDIA) LIMITED
CONSULTANT MECON LTD
CONTRACTOR IL&FS ENGINEERING AND CONSTRUCTION COMPANY LIMITED
FOA No./ LOA No. GAIL/NOIDA/C&P/PROJ/KKBMPL-II/LAYING/016-002/28 DATED 05 Sep-20
MECHANICAL COMPLETION : 04-Sep-2018
CONTRACTUAL COMPLETION DATE COMMISSIONING & GAS-IN : 04-Nov-2018

SL.No. Activity Location

1 Pre Construction Survey

2 ROU Clearing & Grading

3 Line Pipe Received Pipe Yard

4 Stringing

5 Bending Yard

Ch:3,Ch:10,Ch:14,Ch:20,Ch:47,Ch:52,Ch:65,Ch:
6 Main Line Welding 67

8 Tie-in

Ch:3,Ch:10,Ch:14,Ch:20,Ch:47,Ch:52,Ch:65,Ch:
9 NDT 67

10 Joint Coating Ch:11,Ch:45,Ch:65,Ch:67

11 Trenching Ch-3,Ch-11,Ch-67,Ch-65
12 Lowering Ch-3,Ch-67,Ch-65

13 Backfilling Ch-3 to Ch:14,Ch:36 to Ch:51,Ch 52 to Ch:67

14 Boring

15 HDD Ch-45

16 Cased/Un-cased Crossing

17 Hydrotesting Ch-40R to Ch-41

18 Restoration Ch-69,Ch:69

20 HSE Overall

21 Civil DT, SV 01, SV 04 ,SV 03, SV 05 & IP-I

22 Piping AT SV. IP & DT

23 Electrical & Instrumentation Ch-0 to Ch-10, Ch-61 to Ch-54


AD BANGALORE MANGALORE PIPELINE PROJECT
PHASE -II - (SECTION-I)
HAINAGE (0.000 KM to 90.615 KM)

Next day Program


REPORT NO
Next Day program
ANY LIMITED
02/28 DATED 05 Sep-2016

Name of ILFS Representative Contact No Remarks

Mr. Doni 9072653627

7034661852,
Mr. Gokul, Surinder, Vikram Singh 9072653620
& Tinku Tom 9846603413
9072653614

Heerabhai 9072653613

7034661852,
Mr. Gokul, Surinder,Vikram Singh & 8330014822,
Tinku Tom 9846603413

Mr. Surinder, Vikram Singh & Tinku 9072653627


Tom

Mr. Shiji K K 9072653602

Mr. Surinder, Vikram Singh & Tinku 9072653620


Tom

Mr. Surinder, Vikram Singh & Tinku 9072653620


Tom
Mr. Surinder, Vikram Singh & Tinku 9072653620
Tom

Mr. Surinder, Vikram Singh & Tinku 9072653620


Tom,OP Chowbey

Mr.Sanjeev Kr. Singh 9072653612

9072653603,
OP Chowbey/Mr. Pushparaj 7871480520

Mr.Sanjeev Kr. Singh 9072653612

R P Singh/ Salamon 7510441101

9072653606
Ravi Jha / Suresh Babu 9072653621

Suresh Babu 9072653606

9072653621 /
Mr. Ravi Jha / Surinder Singh 7510441104

Mr. Padam Singh Dhakare 7510441108

Mr. CB Rao 7510441107


691
24-Oct-2018

Remarks