Anyone involved in th
tity Su
ts including Architects, Engineers,
iment Bodies. Employers,
atrial”
1€ Q & A sessions and case stuclies curing the workshop were very prac
“The content and language used by the speakers was easy to understand ands
‘Speakers interacted he p
Practical knowledge
prehensive semin
related to my work’
ight forward!
‘ents of the Construction Industry Dev
f Architects MalaysiaSEMINAR
CONTENT
i Session 1 - Introduction to Construction Contracts
{por ofthe Fam 1 KeyFentures
| Sectground and tended Use 1 Comparson wth other Malaysian Fors
| Stucture ofthe Contact "cpa Aajuceation nd PAM 2006
| Detntons
Session 2- Clauses 1 to 10
+ Clause 1 Contractor’ Obligations + Clause 6 Materials, Goods and Workmanship to Conform to
+ Clause 2 Architect's Instructions Description, Testing and Inspection
+ Clause 3 Contract Documents, Programme and As-built + Clause 7 Royalties and Intellectual Property Rights
Drawings + Clause 8 Site Agent
+ Clause 4 Statutory Obligations, Notices, Fees and Charges + Clause 9 Access To The Works
+ Clause 5 Levels and Setting Out of The Works + Clause 10 Site Staff
Session 3 - Clauses 11 to 17
+ Clause 11 Variations, Provisional And Prime Cost Sums _ Clause 15 Practical Completion and Defects Liability
+ Clause 12 Contract Bills + Clause 16 Partial Possession by Employer
+ Clause 13 Contract Sum + Clause 17 Assignment And Sub-Contracting
+ Clause 14 Materials And Goods
Session 4- Clauses 18 to 23
¢ Clause 18 Injury To Persons Or Loss And/Or Damage Of Property And Indemnity To Employer
+ Clause 19 Insurance Against Inury To Persons And Loss And/Or Damage Of Property
+ Clause 208 Insurance of New Buildings/Works ~ By The Contractor
+ Clause 208 Insurance of New Bulldings/Works - By The Employer
+ Clause 20C Insurance of Existing Building or Extension By The Employer
+ Clause 21 Date of Commencement, Postponement And Completion Date
+ Clause 22 Damages for Non-Completion
+ Clause 23 Extension of Time
Session 5 - Clauses 24 to 29
4 Clause 24 Loss And/Or Expense Caused by Matters Affecting The Regular Progress Of The Works
+ Clause 25 Determination Of Contractor's Employment &y Employer
+ Clause 26 Determination Of Own Employment By Contractor
+ Clause 27 Nominated Sub-Contractors
+ Clause 28 Nominated Suppliers
+ Clause 29 Works By Craftsmen, Tradesmen Or Other Contractors Employed Or Engaged By Employer
Session 6 - Clauses 30 to 38
4 Clause 30 Certificates And Payment {Clause 35 Mediation
+ Clause 31 Outbreak Of Hostilties + Clause 36 Notice
+ Clause 32 War Damage 1 Clause 37 Performance Bond
+ Clause 33 Antiquities 1 Clause 38 Governing Law
+ Clause 24 Adjudication and ArbitrationABOUT
THE SPEAKERS
RODNEY MARTIN BSc, LLB(Hons), MSc, MRICS, FCIArb, FMIArb, FSIArb, FMSAdj
Rodney is Chief Executive of the Charton Martin Group. having previously been employed as Group
Regional Director ana Senior Vice President of two major contracts consultaney groups in the Ala
Pacife Region, Of hs 51 years of experience, 21 have been at senior level in this region, Additionally,
Rodhey has worked for many clients in Europe. Alves, the Middle East and india Rodney holds dual
‘ualifcations in quantity surveying and law and a5 a chartered quantity surveyor is a specialst in
Construction contract cansultaney providing professional and technical adview to clients relating to
‘contract documentation contractual claims, dispute avoidance and resolution, He is an sccreaited
mediator panel afbitrator anal panel adjudicator with the Asan Intemational Arbitration Centre and is
an experienced speaker within the region. He is Fellow of the Chartered institute of Arbitrators 25 well
&: both the Malaysian and Singapore Institute of Arbitrators. Rodney has beeh appointed as Expert
Witness on matters relating to quarturn and has acted ae lay advocate in arbitraton proceedings
Rodney has also been appointed as an arbitrator, mediator. adjudicator and Oispute Adjudication
Board member n Malaysia, He nas ved in Kuala Lumpur since 1997,
Cede’
RODNEY MARTIN
a
es
Re RUC
‘SHAWN CHONG BSc(Hons), PCDI;
Reg.Q§, Chartered Construction Manager
JOHN WONG BSc(Hons), LLB(Hons), Dip. Int. Arb., FCIArb, FMSAdi, MRISM, Reg.QSb, FMSAd}
ohn Is a Director of Charlton Martin Consultants Sdn Bhd. John holds dual qualifeations in quantity
Zurveying ahd fale 3 Fellow ofthe Chartered Institute of Arbitratars, Fellow of the Malaysian Society
of Adjudieator a Certified Adludieater under AIAC, a Registered Quantity Surveyor with the Bosra of
‘Quantity Surveyors Malsysia and a Member of The Royal Institution of Surveyors Malaysia, John i 3
Panel Arbitrator and Adjudleator with AIAC and nas acted) as an adjudlestor and an arbitrator In
proceedings. John has over 22 years of experience in quantity curveying and construction contracts
Consultancy Including providing contractual adwce: contract management and administration.
preparing as wellas assessing lass and expense claims and extensian oF time claims. and giving claims
Support In arbitrations/adjudications and acting as an expert witness in arbitration and court
proceedings John represent parties in adjudications and mediates settlement of disputes between
parties John isan atleulate speaker in eonstruetion claims In Malaysia. Apart from Malaysia, John has
‘experience in preparing construction claims for projects In Brunel, Singapore, Indonesia, Talland,
Philippines. Shanghal. Mexico. Algeria and the Middle East
MSc, MBA, MSc, MRICS, MCIOB, MRISM, ICECA,
Shawn is 2 well-qualified mult-