Laporan Mingguan Willy 1
Laporan Mingguan Willy 1
9 L I B U R
1. Cek clearance pillow block EP Fan
2. Membuat WI tentang clereance pillow block EP Fan
10 7:15 22:00 3. Cek Trafo and grit separator, sepax & cek kondisi pada
fan
Area Crusher
1. Inspeksi
area (21) Limestone Crushing
Senin 5 NOV'18 07.30 16.30 2. Inspeksi area (23a)
Limestone Pre Blending 3.
Repair lighting area crusher
Area Loading
1. Terminasi &
Cleaning Panel Control Stacker Corrective Additive area
(26)
2. Terminasi & Cleaning Panel Control Reclaimer
Rabu 7 NOV'18 07.30 16.30 Corrective Additive area (26)
Area Crusher & Loading
3. Terminasi & Cleaning Panel
Control Reclaimer Corrective Additive area (62)
1. Maintenance Proximity sensor pada
Speed monitor propotioning pasir silika,pasir
besi,limestone & clay 4. Terminasi, perawatan &
cleaning Roop Switch, Proximity Switch, Limit Switch
2. Maintenance
corrective additive area loading
Limit Switch yang tidak detag otomatis pada mesin
propotioning pasir silika,pasir besi,limestone & clay serta
telah dilakukan running test oleh operator (local) dan CCR
(central)
4. Terminasi
Electrical Room (ER) Coal
Area Loading
Jum'at 9 NOV'18 07.30 16.30 1. Running Test Control Panel Stucker Coal
Area (42)
5. Terminasi Electrical Room (ER)
Limestone 2. Running Test Control
Panel Reclaimer Coal Area (42)
BATURAJA, 12 NOVEMBER 2018
SENIOR MANAGER
MANAGER ELECTRICAL & INSTRUMENT MAINTENANCE 2 ELECTRICAL & INSTRUMENT MAINTENANCE 2
13 7:15 17:30 1. TPM depan silo cement mill (Paint tiang pondasi)
2. CBM Mingguan
16 7:15 17:30 1. TPM depan silo cement mill (Paint tiang pondasi)
2. Buat gambar autocad expantion joint inlet v.mill
1. TPM depan silo cement mill (Paint tiang pondasi)
17 7:15 19:30 2. Condition monitoring EP Fan, IDF A,B, Z1P17,Z1S14,
Z1P55 dan Z1J28.
18 7:15 17:30 1. Cek vibrasi IDF B, EP Fan & Stand by.
19 0:00 5:30 1. Assist. Repair ganti bearing W1K26
1. Cek kondisi Z1S14, S10, S11, P17, P01, P23, P03, P33,
P43, P53.
2. Ukur dimensi Housing bearing Z1M01
22 7:30 0:00 3. Monitoring pengerjaan Tube mill dan roller press.
4. Bantu pengerjaan roller press (lepas shrink disc dan
hollow shaft di fix)
8 7:15 23:00 1. Cek kondisi di area Grate plate, support grate, baut-
baut, hopper, chain, Metal House.
1. Alignment Tubemill
2. Cek kondisi gearbox tubemill
9 7:15 0:00 3. Cek kondisi setelah pengerjaan mechanic di grate
cooler.
4. cek kondisi dan test running di Z1P17 dan Z1S14
22 0:00 8:00 1. Monitoring Tubemill dan cek kondisi pinion, coupling dan
gearbox
1. Monitoring Tubemill dan cek kondisi pinion, coupling dan
23 0:00 8:00 gearbox
1. TPM Cement Mill Lantai 2
24 7:30 22:00 2. Monitoring Modifikasi transport cement mill system
setelah running.
MUHAMAD RIDWAN
1. Monitoring tubemill
28 7:30 20:00 2. Kencangkan baut housing bearing tubemill
3. Cek Z1P43 (cek bearing and kencangin baut-baut)
1. Monitoring Tubemill
5 7:30 18:30 2. CBM Mingguan (S14 = LV = 14mm/s)
3. Cek kelapangan Surfice miner dan Blending Batubara
4. TPM Semen mill lantai 2
20:00 00:00
Surface miner
00:00 07:00
27 20:00 24:00 1. Condition monitoring IDF B, Z1S14,Z1S10 & Tubemill
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
MUHAMAD RIDWAN
26
27
28
29
30
1. Balancing 45 FN 01
2. Cek kondisi di tubemill 1. Pending to layout
4 7:30 21:00 PPG drawing
3. Drawing layout Proyek PBR
II Tampak samping
1. Unwizing FBR Hoist Chain
For Calciner PBR
5 7:30 19:00 2. Drawing layout Proyek PBR
II Tampak samping
6 7:30 17:00 1. Prresentasi Mitsubishi 18 Maret pertemuan
1. Koordinasi unit kerja 1. Vibrasi Pk:22:00 arah
terkait untuk handling Silo axial pinion 31.5 mm/s
Mini ke 2. Koordinasi ke Pak
7 7:30 22:00 CV. Tonggak Ampuh Woto dan Tonggak
2. Monitoring Tubemill Ampuh
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
MUHAMAD RIDWAN
26
27
28
29
30