1. How much are the solution value and its implications?

Ipil Ozamis Pagadian RHS

Maximize 30 33 50
First Step 23 43 16 <= 1,000
Second Step 32 33 25 <= 2,500
Third Step 43 53 26 <= 1,500
Variable type Integer Real O/1
Optimal
Solution 34 0.23 1 Solutio 1,077.47
n

Linear programming is a model that has a linear objective function and a set

of linear constraints. The goal of this model is to Maximize profit and Minimize

Costs. The table presented above shows that Trends Clothing Company should

have an operation cycle in Ipil plant, Ozamis and Pagadian of 34, 0.23 and 1

respectively for the company to have an optimal solution of 1, 044.47 output.