No.

Jenis Satuan Jumlah


A. Alat
1 Concrete Mixer unit 2
2 Crane 10-15 Ton unit 2
3 Vibrator Engine unit 2
4 Pompa Hidraulik unit 2
5 Genset unit 2
6 Water Pump 70-100 Mm unit 2
7 Concrete Pump unit 2
8 Bor Pile Mechine unit 2
9 Bar Bending unit 2
10 Bar Cutter unit 2
B. Material
Pekerjaan Bangunan
1 Bata m3 110
2 Batu m3 134.090
3 Pasir m3 8.837
4 Split m3 12.706
5 Semen Zak 5.032,2
6 Besi IWF Kg 342.611
Pekerjaan Jalan
1 Batu m3 39.610
2 Split m3 72.539
3 Pasir m3 5.045,04
4 Semen Zak 2.872,9
Kegiatan Pengurugan
1 kebutuhan tanah urug m3 173.700
2 rata-rata tebal timbunan m 2,1