A. Alat 1 Concrete Mixer unit 2 2 Crane 10-15 Ton unit 2 3 Vibrator Engine unit 2 4 Pompa Hidraulik unit 2 5 Genset unit 2 6 Water Pump 70-100 Mm unit 2 7 Concrete Pump unit 2 8 Bor Pile Mechine unit 2 9 Bar Bending unit 2 10 Bar Cutter unit 2 B. Material Pekerjaan Bangunan 1 Bata m3 110 2 Batu m3 134.090 3 Pasir m3 8.837 4 Split m3 12.706 5 Semen Zak 5.032,2 6 Besi IWF Kg 342.611 Pekerjaan Jalan 1 Batu m3 39.610 2 Split m3 72.539 3 Pasir m3 5.045,04 4 Semen Zak 2.872,9 Kegiatan Pengurugan 1 kebutuhan tanah urug m3 173.700 2 rata-rata tebal timbunan m 2,1