You are on page 1of 2
STABILITY AND OPERATIONS Attempt ALL questions ‘Marks for each part question are shown in brackets : = Section A L A vessel is initially upright. KG 850m; KM 9.10m(constant) Present displacement 14 000t. ‘The following operations are now cattied out: Load 55.0t at Kg 6.7m, ——7.20m to port of eenireline, 100.0t at Kg 10.8m, —3.50m to port of centreline, 150.0t at Kg 9.0m, om the centreline, Discharge 1200 at Kg 5.0m, 1.0m port of centretine Calculate the final angle and direction of list after completion of operations. (a). Define EACH of the following: G) TPC; i) MCTC. (0). Fxplain the function of EACH of the following: ( Loadtine; (i) Loadiine zones. OCT 20 fo (20) @) (©) A vessel is floating in fresh water with an Even Keel draught 4.55m. The vessel is 1.8m light of her final completion draught in the fresh water. Using Datasheet Q2 - Hydrastatic Particulars ‘ 4) the initial displacement; Gii)_ the final displacement; (ii) the quantity of cargo to load to reach her completion draught. (@)_ The vessel then proceeds to sea (RD 1.025), find the new mean draught. find EACH of the following: Q) Q) Q) @ [OVER Section B 3. Explain the procedures for entering an enclosed space. (@) Outline the main considerations to be taken into account by the OOW with regard to the use and operation of any form of lifting plant. (b) Describe the precautions and equipment requires for rigging a pilot ladder means of access, (©) Describe the preparations that should be made prior to encountering Heavy Weather. (@) State the objectives of the International Safety Management (ISM) Code, describing how these are achieved. (b) State the conditions which must be applied under Annex 1, MARPOL 73/78 Convention with respect to the discharge of oil or oily mixture residue from a cargo tank into any part of the sea from an oil tanker. (© Explain what is meant by a Special Area with reference to the MARPOL 73/78 Convention. (20) © aM ao) ” e@

You might also like