You are on page 1of 1

KALBAR-I 2 X 100MW COAL FIRED POWER PLANT

DESIGN DOCUMENT REVIEW


A ✔ APPROVED

B APPROVED AS NOTED
C NOT APPROVED
I INFORMATION

APPROVED DOES NOT RELIEVE CONTRACTOR


FROM RESPONSIBILITY FOR ERROR OR
DEVIATIONS FROM CONTRACT REQUIREMENTS

BY: DATE: 26/11/2018

CHINA ENERGY ENGINEERING GROUP


HUNAN ELECTRIC POWER DESIGN
INSTITUTE CO.,LTD

You might also like