Department - Maintenance
Occupational Health & Safety
Ist Half Management advice is eq
External Audit Findings under implementation and monitoring of operation controls
(Oxygen storage tank capacity 10000 serial no 518613/273 however
no records for hydro testing is done attr ~
MINI MANAGEMENT REVIEW REPORT - HSEMS
for following external audit findings | Current Status
HSEMS
Page 1 oF 10
Cherry picker installed in pump house no-4 was found tbe tesied | Current Sau?
intemally however not exteally
iz ra “All the cranes testing are carried out internally 160 tonnes Caren Sian? ae
CDPCL/LG/17/09 dated 11..2.2017was verified - ‘
a ma a ai es cael inet cnt teeee aol iol
Issue Seba) Revislon. 9.3-QSO-RD-04
No: 01 Date: 2015-10-01 ei
Generated from SP for Management Review (9.3-QSO-CP-01)COLOMBO DOCKYARD PLC
MINI MANAGEMENT REVIEW REPORT - HSEMS
HSEMS
LROA 2nd surveillance
Electrical safety reqi
lectricity act
sments are not evaluated in line with the
| During the site visitto the Clappenberg Point it was noted thatthe during
the bollard pull test carried out for testing the integrity of the ropes and
‘anchors used in the ship by pulling of the ship the personnel are required
to observe this operation. However the current location from where this
monitoring is done is not adequately protected and the possibility of
injury due to hitting of the rope under
test cant be rules out completely. The safe place for monitoring of this
operation is required.
Motorised two wheeler parking area near pump house and hot work high
hazard area where oxygen and acetylene pipelines are available,
Page DoF 10
LeIcs ,
AGM(D&M),
HoS(E&A)
Understanding of Hazards and Risks found to be inadequate among most
of the employees at the working areas. Activities are written as Hazards
and hazards are written as Risk in Most of the departmental risk
assessment. Incident data, Safety patrolling observations, Unsafe act and
unsafe condition are not considered for review of the risk assessment.
Suitable procedure may be implemented for communicating the Work ‘All Production
specification and other instructions to the workmen, Department |
eee ae em APMs/ HoDs
Revision
Daeaoreorio | NerolSS*YS Dat 21ST
Generated fm SP for Management Review @.5-QS0-CP-01),
9.3-QSO-RD-04Ist Half
‘COLOMBO DOCKYARD PLC
‘Around 100 LPG cylinders stored near maintenance department along
with Oxygen cylinder at the open corridor where DG set is operating
at one side and continuous vehicle movement at the road side. No fire
proof separations are provided to words DG set and Rosd side,
‘About 25 motor bikes are kept near pump house area, which is a
designated welding, and gas cutting area and Oxygen and acetylene
pipe lines are passed through,
Empty oxygen and acetylene cylinders are Kept without any fall
protection arrangement
‘No external complaints reported during the year 2016 and also no any
outstanding issues reported with relevant 10 OH&S aspects
go" GOET ONEIS DOBQ DSSsTeVO AD oH:
$aaseo HB a0 acioseadl Gq pee on Conch
qSoSae MIosE a gow s6BSSod.eai.Og. GsHGeo
2000631
‘MOM will be circulated
D
MINI MANAGEMENT REVIEW REPORT - HSEMS
HSEMS
Pages of 1
AGM(D&
Mi
SE(M&S)
AGM(D&
Mi
SE(M&S)
AGM(DE
MI
SE(M&S)
gan ofy SSE Pik AGT SE Bag Osea
orcs om gad Oe waned aqSSV0 9 o) exison
So Bdsied guecld, DDaLS, OSD m edo ened
GEG BE09 Boxed em me HOMOSIa DSeIQ
Shab) edacived 0:0 858 ox cana GEed Oagoa
8300 aowe GODe Sdn ooo ge BO
SDDS He FQSIMES caIos aes SS HH Fo
goed GnBsHo O9 Ger mBosasl gsi S580 Ged qo.
G2 BE) DUC m GEDIE eons) O.GW8y J SEO Oe AD
Searsodera oof S000 eakiny 0.6. ded ele
qs5iBe0 200063!
Revision
Norol
Dae 20r4 0410 Neo I
~ Date: 3018 10 01
9.3-QSO-RD-04
Generated from SP for Management Review (9.3-QSO-CP-O1)