RENCANA PEMBANGUNAN PLTA ON GRID DI INDONESIA SD 2025

NO PROPINSI NAMA / LOKASI PENGEMBANG KAP (MW) TAHUN STATUS

1 ACEH Krueng Isep #1 Swasta 20.00 2017/18 Konstruksi


2 ACEH Peusangan 1-2 PLN 88.00 2018 Konstruksi
3 ACEH Redelong Swasta 18.00 2019 Rencana
4 ACEH Meureubo-2 Swasta 59.00 2021 Rencana
5 ACEH Kumbih-3 PLN 48.00 2023 Rencana
6 ACEH Peusangan-4 (FTP2) Swasta 83.00 2023 Commited
7 ACEH Jambu Aye Unallocated 160.00 2025 Rencana
8 ACEH Lawe Alas Unallocated 150.00 2025 Rencana
9 ACEH Tampur-1 Swasta 214.00 2025 Rencana
10 ACEH Tampur-2 Swasta 214.00 2025 Rencana
11 ACEH Pembangkit Hidro Tersebar Swasta 517.00 2016-2025 Rencana
12 SUMUT Wampu (FTP2) Swasta 45.0 2016 Konstruksi
13 SUMUT Asahan III (FTP2) PLN 174.0 2019 Konstruksi
14 SUMUT Hasang (FTP2) #1 Swasta 40.0 2019 Konstruksi
15 SUMUT Sidikalang-1 Swasta 15.0 2019 Rencana
16 SUMUT Batang Toru (Tapsel) Swasta 510.0 2023 Rencana
17 SUMUT Sibundong-4 Unallocated 75.0 2023 Rencana
18 SUMUT Simonggo-2 PLN 90.0 2023 Rencana
19 SUMUT Sumatera Pump Storage-1 Unallocated 1.000.0 2025 Rencana
20 SUMUT Pembangkit Hidro Tersebar Swasta 341.3 2016-2025 Rencana
21 SUMBAR Masang-2 (FTP2) PLN 52.00 2022 Commited
22 SUMBAR Masang-3 PLN 89.00 2024 Rencana
23 JAMBI Merangin Swasta 350.00 2022 Rencana
24 JAMBI Pembangkit Hidro Tersebar Swasta 20.70 2016-2025 Rencana
25 BENGKULU Air Putih Swasta 21.00 2018 Pengadaan
26 BENGKULU Ketahun-1 PLN 25.00 2023 Rencana
27 BENGKULU Pembangkit Hidro Tersebar Swasta 27.50 2016-2025 Rencana
28 LAMPUNG Semangka (FTP2) Swasta 56.00 2018 Konstruksi
29 LAMPUNG Pembangkit Hidro Tersebar Swasta 27.00 2016-2025 Rencana
30 JABAR Rajamandala Swasta 47.00 2017 Konstruksi
31 JABAR Jatigede (FTP2) PLN 55.00 2019 Konstruksi
32 JABAR Jatigede (FTP2) PLN 55.00 2019 Konstruksi
33 JABAR Cimandiri-3 Unallocated 119.00 2025 Rencana
34 JABAR Cimandiri-3 Unallocated 119.00 2025 Rencana
35 JABAR Cikaso-3 Unallocated 53.00 2025 Rencana
36 JABAR Cipasang Unallocated 200.00 2025 Rencana
37 JABAR Cipasang Unallocated 200.00 2025 Rencana
38 JABAR Cibuni-3 Unallocated 172.00 2025 Rencana
39 JABAR Cibuni-4 Unallocated 105.00 2025 Rencana
40 JATENG Maung Unallocated 350.00 2024 Rencana
41 JATENG Rawalo -2 Unallocated 10.00 2025 Rencana
42 JATIM Karangkates #4-5 Unallocated 100.00 2022 Rencana
43 JATIM Kesamben Unallocated 37.00 2022 Rencana
44 KALSEL Kusan PLN 65.00 2025 Rencana
45 KALTIM Kelai PLN 55.00 2025 Rencana
46 KALTIM Tersebar PLN 200.00 2024/25 Rencana
47 KALTIM Tersebar Swasta 350.00 2024/25 Rencana
48 KALUT Tersebar Swasta 220.00 2024/25 Rencana
49 SULUT Sawangan PLN 12.00 2020 Rencana
50 SULUT Poigar 2 Swasta 30.00 2021 Rencana
51 SULTENG Poso 1 Swasta 70.00 2020 Committed
52 SULTENG Tersebar Swasta 160.00 2024/25 Rencana
53 SULSEL Bakaru 2 PLN 140.00 2021/22 Rencana
54 SULSEL Poko PLN 130.00 2022/23 Rencana
55 SULSEL Bakaru 3 PLN 146.00 2023 Rencana
56 SULSEL Salu Uro Swasta 95.00 2020/21 Rencana
57 SULSEL Malea (FTP 2) Swasta 90.00 2021 Committed
58 SULSEL Kalaena 1 Swasta 54.00 2021/22 Rencana
59 SULSEL Seko 1 Swasta 480.00 2023/24 Rencana
60 SULSEL Tumbuan 1 Swasta 300.00 2023/25 Rencana
61 SULSEL Bonto Batu Swasta 46.00 2025 Rencana
62 SULSEL Buttu Batu Swasta 200.00 2024 Rencana
63 SULSEL Tersebar Swasta 210.00 2023-2025 Rencana
64 SULTENGG Konawe PLN 21.00 2024 Rencana
65 SULTENGG Watunohu PLN 15.00 2024 Rencana
66 SULTENGG Lasolo Swasta 145.00 2023 Rencana
67 SULBAR Tabulahan Swasta 20.00 2022/23 Rencana
68 SULBAR Masupu Swasta 36.00 2022/23 Rencana
69 SULBAR Tersebar Swasta 300.00 2024/25 Rencana
70 SULBAR Karama Peaking (Unsolicited) Swasta 190.00 2025 Rencana
71 MALUKU Swasta 12.00 2019 Pengadaan
72 MALUKU PLN 16.00 2023 Rencana
73 PAPUA Orya 2 PLN 14.00 2023 Rencana
74 PAPUA Baliem PLN 50.00 2023-2025 Rencana
75 PAPUA Tersebar Swasta 20.00 2025 Rencana
76 PAPUABAR Warsamson PLN 20.00 2021 Rencana
77 NTB Brang Beh 1 PLN 12.00 2023 Rencana
78 NTT Wae Rancang PLN 16.50 2020 Rencana

INDONESIA 9,092.00