2. This equipment model has surpassed its plan of productivity in each months 3. Does the new model (HD777) will achieve better productivity? 4. Does the fuel consumptions get lower score than their counterparts? 5. How does the payload result compared to the HD785? 6. How much is the opportunity cost ? 7. Is there any additional information that can be extracted? Data 1. Primary data conducted along with Trakindo survey 2. Supporting data provided by MCR in the jobsite 3. Any additional data needed Method 1. Descriptive statistics - Data distribution - Fish Bone (If needed) - Six Sigma chart (if needed) - Comparing data - Pareto diagram 2. Inferential statistics - Regular assumptions - Regression Analysis - T test for comparing means - Anova test - Any additional inferential statistics needed