You are on page 1of 3
Page 1/3, PROJECT: CADANGAN MEMBINA & MENYIAPKAN SEBUAH SEKOLAH MENENGAH KEBANGSAAN [AGAMA DIATAS LOT 10212, MUKIM PENJOM, DAERAH LIPIS, PAHANG DARUL MAKMUR Tih VATION (Ct 1. Objective ‘The objective ofthis methodology sto carry out excavation forthe eu fil and compaction of the existing cleared terrains to the platform levels as shown inthe construction earthwork crawing, 2. Environmental Control Before commencement of works, we need to take nto account the envionment cntrol and impact ofthe cut ard fl excavation Temporary earth drains should be provided in between te csturbed and undisturbed area along the boundaries of ste ‘Sediment basin shuld be bult according to drawings and sit traps need tobe bul to prevent ‘mud flow inte existing water course. Wash rouah fo be provide at earess point of the projet ste, 3. Scope of Works “The scopes of this methodology consis ofthe fllowing; 1. Preparation works and Sol Erosion Control Cut and fil to formation levels «Tal Compaction 4. Reeponsibitties The folowing Ste Personnel to be responsible forthe scope of works; 0. Project Maneger b Site Foreman or supanior « Safety Supervisor, 4. Land Surveyor Page 2/3 PROJECT: CADANGAN MEMBINA & MEVYIAPKAN SEBUAH SEKOLAH MENENGAH KEBANGSAAN AGAMA DIATAS LOT 10212, MUKIM PENJOM, DAERAH LIPIS, PAHANG DARUL MAKMUR Tite: m FOR EXCAVATION (CUT, 10M 5. Handling and Storage of Excavated Materials Handing: Handling fal cut/ excavated materials using hydraulic excavators, ‘bulldozers, backpushers and dump trucks Storage: All excavated materials o be temporary stored at designated area for ‘ace ater 6. Machineries & Equipment Used Hydraulic Excavators + Budozers and Backpusher = Dump Trucks = Vinetore = Survey Equipment: Dumpy Level and measuring stat 1. Excavation ‘All bounderes points and lines tobe identified and pegged by Land Surveyor belore ‘commencement of et and fil works. Identity ard pog areas tobe excavated and backfl Joint survey inspection tobe identified and te limits of excavation tobe set out accurately Standing supervision by Site Foreman to direct and supervise excavator on area tobe excavates Excavated area tobe checked wth leveling equipment fr excavation to require depth f necessary ‘Tim slopes of embankment according o slope and formation levels, Protect lose area wth plaste sheet o prevent erosion f necessary. Carryout int inspection wit the Resident Engineer or Clerk-of Works, Page sss CCADANGAN MEMBINA & MENYIAPKAN SEBUAH SEKOLAH MENENGAH KEBANGSAAN. [AGAMA DIATAS LOT 10212, MUKIM PENJOM, DAERAH LIPIS, PAHANG DARUL MAKMUR. Tite: METHOD STATEMENT FOR EXCAVATION (CUT, BACKFILL AND COMPACTION) 8, Back Filling For area to be bacilld tothe formation levels, the excavated materials tobe deposted spread evenly, leveled and compacted in horizontal layers not more than 1000nim. of lose epth or any other approved depth ‘Theil area to be maintained at ll times with suffcient camber to prevent water pond, 8. Teall Compaction ‘The objective of tral compaction isto optimize and determin the method of working to achieve all requirements regarding compaction ‘Aceato be carted out must be cleared trom loose or ursutabe materia Relevant pogs to be established for height contol ‘The specified compaction equipment willbe directed to carryout on cifferent loose thickness ‘of earth follow by in-situ Feld Densty Test If require and fost be recorded and submit to the consultant fr approval “This process tobe repeated for sitferent area

You might also like