VATION (Ct
1. Objective
‘The objective ofthis methodology sto carry out excavation forthe eu fil and compaction of
the existing cleared terrains to the platform levels as shown inthe construction earthwork
crawing,
2. Environmental Control
Before commencement of works, we need to take nto account the envionment cntrol and
impact ofthe cut ard fl excavation
Temporary earth drains should be provided in between te csturbed and undisturbed area
along the boundaries of ste
‘Sediment basin shuld be bult according to drawings and sit traps need tobe bul to prevent
‘mud flow inte existing water course. Wash rouah fo be provide at earess point of the projet
ste,
3. Scope of Works
“The scopes of this methodology consis ofthe fllowing;
1. Preparation works and Sol Erosion Control
Cut and fil to formation levels
«Tal Compaction
4. Reeponsibitties
The folowing Ste Personnel to be responsible forthe scope of works;
0. Project Maneger
b Site Foreman or supanior
« Safety Supervisor,
4. Land SurveyorPage 2/3
PROJECT:
CADANGAN MEMBINA & MEVYIAPKAN SEBUAH SEKOLAH MENENGAH KEBANGSAAN
AGAMA DIATAS LOT 10212, MUKIM PENJOM, DAERAH LIPIS, PAHANG DARUL MAKMUR
Tite:
m FOR EXCAVATION (CUT, 10M
5. Handling and Storage of Excavated Materials
Handing: Handling fal cut/ excavated materials using hydraulic excavators,
‘bulldozers, backpushers and dump trucks
Storage: All excavated materials o be temporary stored at designated area for
‘ace ater
6. Machineries & Equipment Used
Hydraulic Excavators
+ Budozers and Backpusher
= Dump Trucks
= Vinetore
= Survey Equipment: Dumpy Level and measuring stat
1. Excavation
‘All bounderes points and lines tobe identified and pegged by Land Surveyor belore
‘commencement of et and fil works.
Identity ard pog areas tobe excavated and backfl
Joint survey inspection tobe identified and te limits of excavation tobe set out accurately
Standing supervision by Site Foreman to direct and supervise excavator on area tobe
excavates
Excavated area tobe checked wth leveling equipment fr excavation to require depth f
necessary
‘Tim slopes of embankment according o slope and formation levels,
Protect lose area wth plaste sheet o prevent erosion f necessary.
Carryout int inspection wit the Resident Engineer or Clerk-of Works,Page sss
CCADANGAN MEMBINA & MENYIAPKAN SEBUAH SEKOLAH MENENGAH KEBANGSAAN.
[AGAMA DIATAS LOT 10212, MUKIM PENJOM, DAERAH LIPIS, PAHANG DARUL MAKMUR.
Tite:
METHOD STATEMENT FOR EXCAVATION (CUT, BACKFILL AND COMPACTION)
8, Back Filling
For area to be bacilld tothe formation levels, the excavated materials tobe deposted
spread evenly, leveled and compacted in horizontal layers not more than 1000nim. of lose
epth or any other approved depth
‘Theil area to be maintained at ll times with suffcient camber to prevent water pond,
8. Teall Compaction
‘The objective of tral compaction isto optimize and determin the method of working to
achieve all requirements regarding compaction
‘Aceato be carted out must be cleared trom loose or ursutabe materia
Relevant pogs to be established for height contol
‘The specified compaction equipment willbe directed to carryout on cifferent loose thickness
‘of earth follow by in-situ Feld Densty Test If require and fost be recorded and submit
to the consultant fr approval
“This process tobe repeated for sitferent area