t Specific
charge kg/m3
pensive if the advance becomes much less than 95% of
the hole depth. Fig. 6 illustrates the required hole depth
as a function of the empty hole diameter when a 95%
advance is desired with a four-section cut (Fig. 6).
The equation for hole depth (H) can be expressed as
+
H = 0.15 34.1 4 - 39.4 (m) (2)
where 4 is the empty hole diameter in meters.
The advance I is
I = 0.95 H (m) (3)
Eqs. 2 and 3 are valid only for a drilling deviation
not exceeding 2%.
-
25
7
50 7'5 ~ r e a-m2
loo
Sometimes two empty holes are used instead of one
in the cut, for example, if the drilling equipment can not
handle a larger diameter. Eq. 2 is still valid if 4 is com-
Fig. 4. Specific charge as a function of the tunnel area. puted according to the following:
BLASTING
t
H
Hole depth at
95% advance m
1Burden
Vl
m
I C
0.1 a2 0 Empty hole m
Fig. 6. Hole depth as a function of empty hole diameter
for a four-section cut.
k g l m ANFO eauivalent
0-21 7I / - mm GURlT
I/. 20
11 mm GURlT
40 60 Diameter
J
mm
Fig. 12. Minimum required charge concentration for
smooth blasting and recommended practical hole diam-
eter for NABlT and GURlT charges.
No. of Cartridges
Hole No. of Charge per Total
Type Holes 425 432 438 mm Hole, kg kg
1st quad. 4 4.5 1.59 6.37
2nd quad. 4 4.5 2.62 10.48
3rd +4th quad. 8 4.5 3.67 29.36
Lifters 5 2.0 2.5 3.20 16.00
Roof 8 5.0 1.77 14.16
Wall 6 2.0 2.5 3.20 19.20
Stoping 5 2.0 2.5 3.20 16.00