DRILLING LOG RECORD
‘PROYEK The Jag asa)"
.PEDATA, 2.REVATION |. TEMPORARY CASING
ate Pe= 12a epotcanesnatnctog = 1308 cane te
Danes OH. ang Gourd evel) ot xing 5
Stacie etn Date idea cut of evel cu) See =
iin Dring Date WE Desen Toe evel == 5 Se mminroncemen
— Fath io Secon
operate Tuts ‘sine ADT an secon
5 DRIUNG & SoILLocciNs
rpored hecoasy sumed oy
, Lip
VorbCONCRETING RECORD
PROYEK “The Jagir (Klaska)"
tet. Topoteaingdtvtin(toc) : — [1005
Oia le 5 ia -
concreting Date y CRD
2
rill Length From TOC = 40.
‘etal volume |
verbrese Design Concrete Grade
checker Top concrete Love!
Insalot tect Cage time) ‘Numb Sample
Install Teme Pipe tse)
‘la coordinate
Comat
‘Truck Ho. | Time ot seria] YOM} “Vetume | oneete Same
(er)
ote
one
oe
Tou Powring Te our]
{sta of Posing Tia) End of tal of Temi Piel
ors
sopoved By Checked By Submited
ate ote ate
Lp
Hot toad
(Preece anager(oenues Hs/bd)
2880) woe mun deme resp eroe\AL
ane,
opsdeunby) “Wy JL coumonateven estar
; PS aq] 7 5
ys Hi’ x !
eo mea ea
maaoretyy PONY ug “ud as
“ta panuans Aapepaea ta ponony
| ion
—_ 7 PO We | Ao
oe pO [nto Tana
30.60 | a] sunt |
— [| aR TE
- 308 | _ TO RI
— : __ Woo | 020 | TIO
— aim og [uA] wea
ie ee ~~ ~ 99. an | ST
c 30-7 [vio | the
—— ~~ WO] aL. a] Fhe
wvIonG DBHar 101 Ta} _
iin opts me Les
ey oe ™
a
_ 2 aa CaO I ahi UR
RAT | (RR) my aap ag, I elo)
uesos6uag Isisog uep uoxag UEYNPY INIA deyoy
8G Wp EPS RT TI TTT
aT
865 TEST BIOe APA: oA\sepURS HESSD Eafieat BLUYEAD