SC α

200 kg/m2 12
250 kg/m2 11
300 kg/m2 11
500 kg/m2 10
750 kg/m2 9
1000 kg/m2 8

PHI AREA (cm2)


3/ 8 0.71
1/ 2 1.29
5/ 8 1.99
3/ 4 2.85
1 5.1
ANALISIS Y DISEÑO DE VIGAS CON EL MÉTODO DE LOS COEFICIENTES DEL ACI
VP
1 DATOS Y CALCULOS PREVIOS
1.1 LUCES DE VIGAS
A B C

2.35 m 4.85 m 2.35 m

1.2 VERIFICACIÓN DE LA UTILIZACIÓN DEL MÉTODO DE LOS COEFICIENTES

Lmayor= 4.85 m
2.0638297872 YA FUIMOS :(
Lmenor= 2.35 m

1.3 PREDIMENSIONAMIENTO DE VIGA

SC= 300 kg/m2


α hv hv bv
11 0.441 m 0.500 m 0.250 m

2 METRADO DE CARGAS

2.1 CARGA MUERTA (WD)


AT PESO/M2 W (kg/m)
P.P. LOSA 4.25 300 kg/m2 1275 kg/m
PISO TERMINADO 4.5 m 100 kg/m2 450 kg/m
TABIQUERIA 4.5 m 150 kg/m2 675 kg/m
CIELO RASO 4.5 m 50 kg/m2 225 kg/m
P.P. VIGA 300 kg/m
2925 kg/m
2.2 CARGA VIVA (WL)

AT PESO/M2 W (kg/m)
P.P. LOSA 4.50 300 kg/m2 1350 kg/m
1350 kg/m

2.3 CARGA ULTIMA (WU=1.5WD + 1.8WL) 6817.5 kg/m

3 DISEÑO ESTRUCTURAL
3.1 MOMENTOS FLECTORES (MU) WU 6817.5 kg/m
A B C
1/16 1/10 1/10
1/14 1/16 1/14

5.00 m 4.75 m 4.75 m

5.00 m 4.50 m 5.00 m

18.36 18.18 18.23

2.62 5.46 2.43

f'c= 210 H= 50.00 cm d= 45.00


Fy= 4200 r= 5.00 cm phi= 0.9
b= 25.00 cm beta1 0.85

12.40 cm2 12.26 cm2 12.30 cm2

1.57 cm2 3.33 cm2 1.45 cm2

3.2 FUERZAS CORTANTES (VU) WU 6817.5 kg/m


A B C
1.15 1.15 1.15
19.60 Ton 17.64 Ton 19.60 Ton

19.60 Ton 17.64 Ton


1.15 1.15

VC 8.64 Ton
PHI 0.85

VS(A) VS(B) VS(C )


14.42 Ton 14.42 Ton 14.42 Ton
AV 1.42 cm2
S 18.61 cm S 18.61 cm S 18.61 cm
d/4
OEFICIENTES DEL ACI

AT
4.5 m

YA FUIMOS :(

bv
0.250 m

D
1/16

COEFICIENTES
1/14

5.00 m

LUCES

5.00 m

15.58

MOMENTOS
2.43

As máx= 23.91 cm2


As min= 3.75 cm2

10.26 cm2

ACERO DE
REFUERZO
1.45 cm2

FUERZAS
CORTANTES

19.60 Ton
1.15

VS(D)
14.42 Ton

S 18.61 cm
EJE 4 T N1
As req= 8.32 cm2 As req= 6.36 cm2 As req=
5/ 8 2 3.98 cm2 CORR 5/ 8 2 3.98 cm2 CORR 5/ 8 2
3/ 4 2 5.7 cm2 1/ 2 2 2.58 cm2 1/ 2 2
As real= 9.68 cm2 As real= 6.56 cm2 As real=
Ok Ok
As req= 2.61 cm2 As req= 2.03 cm2
A 5/ 8 2 3.98 cm2 B 5/ 8 2 3.98 cm2
As real= 3.98 cm2 As real= 3.98 cm2
Ok Ok

As req= 3.98 cm2 As req= 2.77 cm2


5/ 8 2 3.98 cm2 CORR 5/ 8 2 3.98 cm2 CORR
1/ 2 0 cm2 5/ 8 0 cm2
As real= 3.98 cm2 As real= 3.98 cm2
Ok Ok
As req= 4.42 cm2 As req= 7.12 cm2 As req=
5/ 8 2 3.98 cm2 CORR 5/ 8 2 3.98 cm2 CORR 5/ 8 2
1/ 2 1 1.29 cm2 1/ 2 3 3.87 cm2 1/ 2 1
As real= 5.27 cm2 As real= 7.85 cm2 As real=
Ok Ok

EJE 12 T N2
As req= 7.59 cm2 As req= 5.69 cm2 As req=
3/ 4 2 5.7 cm2 CORR 5/ 8 2 3.98 cm2 CORR 5/ 8 2
1/ 2 2 2.58 cm2 1/ 2 0 0 cm2 1/ 2 0
As real= 8.28 cm2 As real= 3.98 cm2 As real=
Ok Mal
As req= 3 cm2 As req= 1.82 cm2
A 5/ 8 2 3.98 cm2 B 5/ 8 2 3.98 cm2
As real= 3.98 cm2 As real= 3.98 cm2
Ok Ok

As req= 3.34 cm2 As req= 2.6 cm2


5/ 8 2 3.98 cm2 CORR 5/ 8 2 3.98 cm2 CORR
1/ 2 0 cm2 5/ 8 0 cm2
As real= 3.98 cm2 As real= 3.98 cm2
Ok Ok
5.59 cm2 As req= 6.4 cm2 As req= 8.2 cm2
3.98 cm2 CORR 5/ 8 2 3.98 cm2 CORR 5/ 8 2 3.98 cm2
2.58 cm2 1/ 2 2 2.58 cm2 3/ 4 2 5.7 cm2
6.56 cm2 As real= 6.56 cm2 As real= 9.68 cm2
Ok Ok Ok
As req= 2.9 cm2 As req= 2.58 cm2
5/ 8 2 3.98 cm2 5/ 8 2 3.98 cm2
As real= 3.98 cm2 As real= 3.98 cm2
Ok Ok

As req= 2.95 cm2 As req= 3.92 cm2


5/ 8 2 3.98 cm2 CORR 5/ 8 2 3.98 cm2 CORR
1/ 2 0 cm2 1/ 2 0 cm2
As real= 3.98 cm2 As real= 3.98 cm2
Ok Ok
4.42 cm2 As req= 6.98 cm2 As req= 4.42 cm2
3.98 cm2 CORR 5/ 8 2 3.98 cm2 CORR 5/ 8 2 3.98 cm2
1.29 cm2 1/ 2 3 3.87 cm2 1/ 2 1 1.29 cm2
5.27 cm2 As real= 7.85 cm2 As real= 5.27 cm2
Ok Ok Ok

5.44 cm2 As req= 7.52 cm2


3.98 cm2 CORR 5/ 8 2 3.98 cm2 CORR
0 cm2 1/ 2 2 2.58 cm2
3.98 cm2 As real= 6.56 cm2
Mal Mal
As req= 3 cm2
5/ 8 2 3.98 cm2
As real= 3.98 cm2
Ok

As req= 3.2 cm2


5/ 8 2 3.98 cm2 CORR
1/ 2 0 0 cm2
As real= 3.98 cm2
Ok
CORR

CORR
A 3.15 B 4.73

0.80 1.05 1.60

0.45 0.55 0.8


4.73 D 3.67 F 3.15

1.60 1.25 1.25 1.05

0.8 0.65 0.65 0.55


3.15 G

0.80

0.45
A= 30 DISEÑO POR CORTE
h= 50
Vu= 11.87
Ø= 0.85
STRIBO Ø3/8" F'c= 210
ØA. BARRA= 0.71 d= 44 SPAC1=
50
Vs= 3.83 Ton *f SPAC2=
AV= 1.42
30 F'y= 4200

SPAC= 68.58 cm
11.00 cm

22.00 cm