MATERIAL DELIVERED ON SITE FORM [GENERAL [7 NORTH I SOUTH
Project 1205060 Contractor STFA
‘Supeirtendent Koc
‘upecrtondents Rep ‘SSH Intemational Date 25-Nov-2018
Reterence 1205080-MDS-1 166 Rev.3
ee
Desspon a tera T marine T chitecturat Mechanical
Automatic Tank Gauging System ai
a FF electrical T Phambing
Date of Delivery: it
25-Ju2087 DNNo: 170718
‘Guanty
‘As por attached Delivery Note (itom No’s— 1, 4, § 11)
‘Specifeation / BOG sause
‘Tecinical Spectication Section 15190
Source & Place af Origin
IMIS INCON INC - USAPower Co,
Material Suomital Rt. No,
1205050-MAR-0175-2 Rov.0,
CCS Activity
‘Storage Location
STFA Precast Area STFA QC.
‘Location / Scope of Work Reviewed
‘South and North Harbour Sign.
Fema: Di
Attachments :- DN, P.O, MAR, Ceticate of Origin, Vendor Reports
‘Submited by: Abdul Aziz
Contractor's Signature: FSR — Date: 25-Nov-2018
‘Superintendents Rep. Comments NOT AP PROVED
4 EPA CURUIPICATE FoR CONGOLE TSE AM TSP-LU2 Is mer SuemaTED /mttAcHED POR
KOC ReviEN/APPeOrAL AS MENTIONED IN OUR ComMENT ORb MDS N66, Coy 2
I2- Mopet Foe TTEM No Le WAS NOT MATCH S WITH TIE MODEL wRittEw on
Twe DELVERY NOTE: a
DESIGNATION NAME ‘SIGNATURE DATE
oiscPune suPeRVison (Jue A Aix) 21k
DISCPUNE ENGINEER | yChaligl p Jia) 1s
(QW/GC MANAGER Goma Set t |——ZhA Shief eur
Feceted by Contactor cette Date:
Dstibuton By Superintendents Orighal Copy
Representative
‘Supeintendent o oo
Supesntendents Rep, Gea
contactor D —B__ CONTRACTOR WILL PROVIDE COPIES REQUIRED IN THIS FORM.
ORIGINAL WILL BE RETURNED TO CONTRACTOR AFTER ACTION TAKEN BY
SUPERINTENDENT'S REP,
Form No.: 1205050-CTR-FRM-0012_E