DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY

SNAG LIST (RESTAURANT)


DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT

1 External Graffi Repair of damaged areas

2 Internal Graffi Repair of damaged areas

3 Internal flooring (Floor Tiles) Shall be cleaned properly

4 Toilet and kitchen area tile work Shall be cleaned properly

5 Marble for Kitchen slab and door steps/threshold Edges shall be round properly and polished
Proper cleaning required and gasket shall be fixed on inner
6 windows and ventilator installation
face for waterproofing
7 Door frames Cleaning & polish final coat required

8 Door Shutters Cleaning & polish final coat required


1: Repair of Shutters and alignment
9 Kitchen Cabnets
2: Proper plaster required in floor mounted cabnets
10 Wooden carving sections 15" x 15" on external façad Polish final coat required

11 Paint work Repair in Washrooms & Final coat in Store Room

12 Toilet signage plates Shall be fixed properly

13 External steps and Plinth protection Clenaing required

14 Rockery on front side of the restaurant Crush to be filled

15 Electrical Wiring, Telephone cable and TV cable wirin Minor repairs & tests required

16 Electrical switch board and lights installation Minor connection settings required
Galss is brocken need to be fixed, All connection need to
17 Electrical DB be checked & Tags must be palced on each breaker plus
testing required

1: Proper cleaning of all fixtures


2: Basin mixtures shall be replaced as chrome is damaged
18 Internal Plumbing work in toilets and Kitchen
3: White cement shall be filled around basin stands and
comodes

19 External plumbing works

20 Rain water pipes To be fixed properly

21 Vent pipes Shall be fixed properly & Cowels shall be fixed

22 Gas pipe line Testing required


Roof Khurra shall be completed as per drawing & Joint of
23 Roof treatment rainwater pipe with parapet wall shall be filled with cement
sand mortar properly
24 Bottom khurra below rain water pipe Shall be constructed as per drawing
Inner plaster shall be done properly and Covers shall be
25 Construction of man holes and gully traps
fixed properly

26 External hard lanscaping and plinth protection Crackes in palster and concrete shall be repaired properly

27 Fiber shed over toilet ventilator Silicone shall be filled in gaps

28 MS Grill Ventilator in Store & Kitchen To be Fabricated & fixed

29 Shed over Ventilators Concrete Shed to be constructed

30 Gyser To be purchesd and installed


Seprate gate valve shall be installed in toilet Hot & Cold
31 Valve on toilet supply line
lines

ISSUED BY:
RESIDENT ENGINEER CONSULTANTS: RECEIVING:
THE URBAN UNIT G3 CONTRACTOR: M/S MALIK M YOUNUS
1 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST (RESTAURANT)
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT
ISSUED BY:
RESIDENT ENGINEER CONSULTANTS: RECEIVING:
THE URBAN UNIT G3 CONTRACTOR: M/S MALIK M YOUNUS

2 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST (GUEST HOUSE)
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT

1 External Graffi Minor repairs required

2 Internal Graffi Minor repairs required

3 Internal flooring (Floor Tiles) Shall be cleaned properly

4 Toilets and kitchen area tile work Shall be cleaned properly

5 Marble for Kitchen slab and door steps/threshold Edges shall be round properly and polished
Proper cleaning required and gasket shall be
6 windows and ventilator installation
fixed on inner face for waterproofing
7 Door frames Cleaning & polish final coat required

8 Door Shutters Cleaning & polish final coat required


1: Repair of Shutters and alignment
9 Kitchen Cabnets 2: Proper plaster required in floor mounted
cabnets

10 Paint work Minor repairs in kitchen & Toilets

11 External steps and Plinth protection

12 MS Wicket door in lawn Paint final coat required

13 Electrical Wiring, Telephone cable and TV cable wiring Minor repairs & tests required

Tv sockets to be checked & 5 pin sockets shall


14 Electrical switch board, lights & other fixtures installation be installed 1 in each room, Ceiling lights to be
fixed properly

All connection need to be checked & Tags must


15 Electrical DB
be palced on each breaker plus testing required

1: Proper cleaning of all fixtures


16 Internal Plumbing work in toilets and Kitchen 2: White cement shall be filled around basin
stands and comodes
17 External plumbing works Testing required

18 Drinking water supply plumbing Testing required

19 O.H water tank fiber make As per BOQ Testing required

20 Rain water pipes To be fixed properly

21 Vent pipes Shall be fixed properly & Cowels shall be fixed

22 Gas pipe line Testing required

Roof Khurra shall be completed as per drawing &


23 Roof treatment Joint of rainwater pipe with parapet wall shall be
filled with cement sand mortar properly

24 Bottom khurra below rain water pipe Shall be constructed as per drawing

25 Construction of man holes and gully traps Covers shall be fixed properly
Crackes in palster and concrete shall be repaired
26 External hard lanscaping and plinth protection
properly

27 Valve on toilet supply line Gate valve shall be installed on Hot & Cold lines

28 Gyser (Gas) To be purchesd and installed

29 Crush (Pan size) in lawn area Need to be layed

Aluminium Sliding Door In verandah towards lawn shall be installed

ISSUED BY:
RESIDENT ENGINEER CONSULTANTS: RECEIVING:
THE URBAN UNIT G3 3 / 16 CONTRACTOR: M/S MALIK M YOUNUS
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST (GUEST HOUSE)
DESANG APPROVAL
SR. NoBY:
ISSUED DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT
RESIDENT ENGINEER CONSULTANTS: RECEIVING:
THE URBAN UNIT G3 CONTRACTOR: M/S MALIK M YOUNUS

4 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST (STAFF QUARTERS 1 & 2)
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT

1 External Graffi Repair of damaged areas

2 Internal Graffi Repair of damaged areas


Shall be cleaned properly & in some areas
3 Internal flooring (Floor Tiles)
motives are missing which shall be fixed
Joint filling to be done properly & proper
4 Toilets and kitchen area tile work
cleaning required

5 Marble for Kitchen slab and door steps/threshold Edges shall be round properly and polished

Proper cleaning required and gasket shall be


6 windows and ventilator installation
fixed on inner face for waterproofing
7 Door frames Cleaning & Polish required

8 Door Shutters Cleaning & Polish required


1: Repair of Shutters and alignment
9 Kitchen Cabnets 2: Proper plaster required in floor mounted
cabnets
10 Wooden carving sections 18" x 60" on external façade Polish final coat required

11 Paint work 1 Coat required

12 MS Wicket door in lawn Paint final coat required

Minor repairs & tests required & Plastic cover


13 Electrical Wiring, Telephone cable and TV cable wiring
sheets shall be fixed on all extra points

Tv sockets to be checked & 5 pin sockets shall


14 Electrical switch board, lights & other fixtures installation
be installed 1 in each room
All connection need to be checked & Tags must
15 Electrical DB
be palced on each breaker
All fixtures shall be cleaned properly & Testing
16 Internal Plumbing work in toilets and Kitchen
required
17 External plumbing works Testing required

18 Rain water pipes To be fixed properly

19 Gas pipe line Testing required

Roof Khurra shall be completed as per drawing


20 Roof treatment & Joint of rainwater pipe with parapet wall shall
be filled with cement sand mortar properly

21 Bottom khurra below rain water pipe Shall be constructed as per drawing

22 Construction of man holes and gully traps Covers shall be fixed properly

23 External hard lanscaping and plinth protection Reapir of cracked areas

24 Valve on toilet supply line Shall be installed outside each toilet

ISSUED BY:
RESIDENT ENGINEER CONSULTANTS: RECEIVING:
THE URBAN UNIT G3 CONTRACTOR: M/S MALIK M YOUNUS

5 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST (PUBLIC TOILETS)
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT

1 External Graffi Minor repairs required


Shall be cleaned properly & Joint filling to be
2 Internal flooring (Floor Tiles)
done properly
Shall be cleaned properly & Joint filling to be
3 Internal (Wall Tiles)
done properly
4 MS Grill Ventilator installation Paint final coat remaining

5 Wire mesh (Galvanized) in ventilators Shall be fixed

6 Door frames Cleaning & Polish required

7 Door Shutters Cleaning & Polish required

8 Paint work 1 Coat required

9 Front parda wall

10 Electrical Wiring, All connection need to be checked

11 Electrical switch board, lights & other fixtures installation Shall be fixed properly

12 Internal Plumbing work in toilets Testing required

13 External plumbing works Gate valve shall be installed on Hot & Cold lines

Roof Khurra shall be completed as per drawing


14 Precast roof slab & Roof treatment & Joint of rainwater pipe with parapet wall shall
be filled with cement sand mortar properly

15 External hard lanscaping and plinth protection Concrete on edges of Paver areas

16 Toilet signage plates To be fixed properly

17 Valve on toilet water supply line To be installed

18 Rain water pipes To be fixed properly

19 Vent pipes Shall be fixed properly & Cowels shall be fixed

20 Bottom khurra below rain water pipe Shall be constructed as per drawing

ISSUED BY:
RESIDENT ENGINEER CONSULTANTS: RECEIVING:
THE URBAN UNIT G3 CONTRACTOR: M/S MALIK M YOUNUS

6 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST (CYCLE STORE)
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT

Minor repair required & remaining portions shall


1 External Graffi
be completed

Plaster on Outer walls upto plinth level required


2 Plaster work
to be completed

3 Internal paint work Final coat remaining

4 Internal PCC flooring Proper cleaning required

Roof Khurra shall be completed as per drawing


5 Precast roof slab & roof treatment & Joint of rainwater pipe with parapet wall shall
be filled with cement sand mortar properly

6 Electrical wiring, switch board & Fixture installation To be completed as per directions

1: Final coat of paint remaining


7 MS Doors
2: Sides shall be filled properly with Mortar

8 Ms Grill ventilators Final coat of paint remaining

9 Wire mesh (Galvanized) in ventilators Shall be fixed

10 Fiber shed over Ventilators Gaps shall be filled with Silicon

11 Rain water pipe Need to be fixed properly

12 Bottom khurra below rain water pipe Shall be constructed as per drawing

ISSUED BY:
RESIDENT ENGINEER CONSULTANTS: RECEIVING:
THE URBAN UNIT G3 CONTRACTOR: M/S MALIK M YOUNUS

7 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST (BOARDWALK)
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT

Some portions specially on both end required to


1 Toe walls
be redone due to settlement cracks

Concrete at the edges required at some portions


2 Paver laying
& Cleaning required

3 Plaster Work Cracks shall be repaired

4 Pebble fixing

5 Sitting area concrete Pads Reapir of cracked areas reuired

6 Concrete patterns on walking track Repair on edges required

7 Storm water Drain Plater repair required at some areas

8 Levelling dressing on lake side Some portions required to be redone

Required to be fixed properly with MS angle &


9 Fixing of concrete benches with floor
rawal bolts

10 Installtion of Dustbins Some Dustins missing

Removal & refixing of tuff pavers on the pathway from guest


11 Sand filling in gaps required
house to boardwalk'
All kiosks shall be connected properly with
12 Wiring for Electrical poles & Kiosks
electrical DB

13 External DB installation MS Grill shall be fixed for safety

14 Garden light poles Silicone around glass shall be filled

15 Sumpits & uPVC pipe installation Required to be done at designated places

ISSUED BY:
RESIDENT ENGINEER CONSULTANTS: RECEIVING:
THE URBAN UNIT G3 CONTRACTOR: M/S MALIK M YOUNUS

8 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST (EXTERNAL DEVELOPMENTS & WORKS)
DESANG APPROVAL
SR. No POINTS
CONTRACTOR CONSULTANTS URBAN UNIT
A EXTERNAL DEVELOPEMNTS (CIVIL WORKS)
1 Pathways ( Sandstone finishing) Reapir of cracked areas
Brocken pavers shall be replaced and sand
2 Pathways ( Paver finishing)
filling remaining
3 Bonfire
4 Sitting areas Cleaning required

1: Plaster on out face is reauired to be


5 External Boundary completed
2: Proper cleaning required at outer side areas

6 Electrical Handholes Shall be completed as per drawing


7 Earthing Pits Shall be completed as per drawing
B EXTERNAL ELECTRICAL WORKS
1 External Wall lights Shall be cleaned
2 External Flood lights Testing required

1: Silicone around glass shall be filled


3 External Garden pole lights
2: Graffi on concrete columns shall be done

4 Earthing To be completed as per BOQ & Drawing


5 Transformer/Meter to Main Pannel Cable laiyng Cable joints shall be done as directed
Proper taging must be done
6 Main DB / Pannel with provision of 2 Connections from wapda All wires shall be connected with brackers using
thimbles
7 External DB for lighting,Public toilets, Store room etc Proper taging must be done
8 Main telephone DB with 50 pair connection strip Connections & Testing required
9 Main CATV DB with Cable booster & Spliters Testing required
10 Joints of Main Cables Cable joint shall be comlpeted using PVC joint
C EXTERNAL PLUMBING WORKS
1 Sewerage line Shall be cleaned & Test required
Electrical switch must be shifted in Staff quarter
2 Boring & installation of submersible pump
near the boring
Gate valves shall be installed on Hot & Cold
3 Water supply Connection to each building
pipe lines out side of each toilet
4 Gas line piping & Connection to each kitchen & for gyser Testing required
5 Drinking Water supply piping from R.O plant to Each kitchen Testing required
6 Submersible Sluge pump & 400 feet waste pipe Handed over to TDCP Representative
1:Covers shall be fixed properly
2: Benching shall be done as per drawing
7 Manholes, Sockage pit
3: Cocnrete slab over sockage pit with 1
opening
D R.O PLANT
1 Concrete pad for R.O plant
2 Installation of R.O Plant Delivered at site Installation remaining
3 O.H tank (As per BOQ) Required to be installed
E ENTRANCE BOARD
1 Sandstone cladding Replace the broken tiles
2 Paint in engraved writting
3 Pad arround the Signage Concrete around shall be laid properly

ISSUED BY:
RESIDENT ENGINEER CONSULTANTS: RECEIVING:
THE URBAN UNIT G3 CONTRACTOR: M/S MALIK M YOUNUS

9 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT
A RESTAURANT

1 External Graffi Repair of damaged areas

2 Internal Graffi Repair of damaged areas

3 Internal flooring (Floor Tiles) Shall be cleaned properly

4 Toilet and kitchen area tile work Shall be cleaned properly

5 Marble for Kitchen slab and door steps/threshold Edges shall be round properly and polished

Proper cleaning required and gasket shall be fixed


6 windows and ventilator installation
on inner face for waterproofing

7 Door frames Cleaning & polish final coat required

8 Door Shutters Cleaning & polish final coat required

1: Repair of Shutters and alignment


9 Kitchen Cabnets
2: Proper plaster required in floor mounted cabnets

10 Wooden carving sections 15" x 15" on external façade Polish final coat required

11 Paint work Repair in Washrooms & Final coat in Store Room

12 Toilet signage plates Shall be fixed properly

13 External steps and Plinth protection Clenaing required

14 Rockery on front side of the restaurant Crush to be filled

15 Electrical Wiring, Telephone cable and TV cable wiring Minor repairs & tests required

16 Electrical switch board and lights installation Minor connection settings required

Galss is brocken need to be fixed, All connection


17 Electrical DB need to be checked & Tags must be palced on each
breaker plus testing required

1: Proper cleaning of all fixtures


2: Basin mixtures shall be replaced as chrome is
18 Internal Plumbing work in toilets and Kitchen damaged
3: White cement shall be filled around basin stands
and comodes

19 External plumbing works

20 Rain water pipes To be fixed properly

21 Gas pipe line Testing required

22 Roof treatment

Inner plaster shall be done properly and Covers shall


23 Construction of man holes and gully traps
be fixed properly
Crackes in palster and concrete shall be repaired
24 External hard lanscaping and plinth protection
properly

25 Fiber shed over toilet ventilator Silicone shall be filled in gaps

26 MS Grill Ventilator in Store & Kitchen To be Fabricated & fixed

27 Shed over Ventilators Concrete Shed to be constructed

10 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT

28 Gyser To be purchesd and installed

Seprate gate valve shall be installed in toilet Hot &


29 Valve on toilet supply line
Cold lines

11 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT
B GUEST HOUSE
1 External Graffi Minor repairs required
2 Internal Graffi Minor repairs required
3 Internal flooring (Floor Tiles) Shall be cleaned properly
4 Toilets and kitchen area tile work Shall be cleaned properly
5 Marble for Kitchen slab and door steps/threshold Edges shall be round properly and polished
Proper cleaning required and gasket shall be fixed
6 windows and ventilator installation
on inner face for waterproofing
7 Door frames Cleaning & polish final coat required
8 Door Shutters Cleaning & polish final coat required

1: Repair of Shutters and alignment


9 Kitchen Cabnets
2: Proper plaster required in floor mounted cabnets

10 Paint work Minor repairs in kitchen & Toilets


11 External steps and Plinth protection
12 MS Wicket door in lawn Paint final coat required
13 Electrical Wiring, Telephone cable and TV cable wiring Minor repairs & tests required
Tv sockets to be checked & 5 pin sockets shall be
14 Electrical switch board, lights & other fixtures installation installed 1 in each room, Ceiling lights to be fixed
properly

All connection need to be checked & Tags must be


15 Electrical DB
palced on each breaker plus testing required

1: Proper cleaning of all fixtures


16 Internal Plumbing work in toilets and Kitchen 2: White cement shall be filled around basin stands
and comodes
17 External plumbing works Testing required
18 Drinking water supply plumbing Testing required
19 O.H water tank fiber make As per BOQ Testing required
20 Rain water pipes To be fixed properly
21 Gas pipe line Testing required
22 Roof treatment
23 Construction of man holes and gully traps Covers shall be fixed properly
Crackes in palster and concrete shall be repaired
24 External hard lanscaping and plinth protection
properly
25 Valve on toilet supply line Gate valve shall be installed on Hot & Cold lines
26 Gyser (Gas) To be purchesd and installed
27 Crush (Pan size) in lawn area Need to be layed

12 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT
C STAFF QUARTER-1 & 2
1 External Graffi Repair of damaged areas
2 Internal Graffi Repair of damaged areas
Shall be cleaned properly & in some areas motives
3 Internal flooring (Floor Tiles)
are missing which shall be fixed
Joint filling to be done properly & proper cleaning
4 Toilets and kitchen area tile work
required
5 Marble for Kitchen slab and door steps/threshold Edges shall be round properly and polished
Proper cleaning required and gasket shall be fixed
6 windows and ventilator installation
on inner face for waterproofing
7 Door frames Cleaning & Polish required
8 Door Shutters Cleaning & Polish required

1: Repair of Shutters and alignment


9 Kitchen Cabnets
2: Proper plaster required in floor mounted cabnets

10 Wooden carving sections 18" x 60" on external façade Polish final coat required
11 Paint work 1 Coat required
12 MS Wicket door in lawn Paint final coat required
Minor repairs & tests required & Plastic cover sheets
13 Electrical Wiring, Telephone cable and TV cable wiring
shall be fixed on all extra points
Tv sockets to be checked & 5 pin sockets shall be
14 Electrical switch board, lights & other fixtures installation
installed 1 in each room
All connection need to be checked & Tags must be
15 Electrical DB
palced on each breaker
All fixtures shall be cleaned properly & Testing
16 Internal Plumbing work in toilets and Kitchen
required
17 External plumbing works Testing required
18 Rain water pipes To be fixed properly
19 Gas pipe line Testing required
20 Roof treatment
21 Construction of man holes and gully traps Covers shall be fixed properly
22 External hard lanscaping and plinth protection Reapir of cracked areas
23 Valve on toilet supply line Shall be installed outside each toilet

13 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT
D PUBLIC TOILET BLOCK
1 External Graffi Minor repairs required
Shall be cleaned properly & Joint filling to be done
2 Internal flooring (Floor Tiles)
properly
Shall be cleaned properly & Joint filling to be done
3 Internal (Wall Tiles)
properly
4 MS Grill Ventilator installation Cleaning required
5 Wire mesh (Galvanized) in ventilators Shall be fixed
6 Door frames Cleaning & Polish required
7 Door Shutters Cleaning & Polish required
8 Paint work 1 Coat required
9 Front parda wall
10 Electrical Wiring, All connection need to be checked
11 Electrical switch board, lights & other fixtures installation Shall be fixed properly
12 Internal Plumbing work in toilets Testing required
13 External plumbing works Gate valve shall be installed on Hot & Cold lines
14 Precast roof slab & Roof treatment
15 External hard lanscaping and plinth protection
16 Toilet signage plates To be fixed properly
17 Valve on toilet water supply line To be installed
18 Rain water pipes To be fixed properly

14 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT
E EXTERNAL DEVELOPEMNTS (CIVIL WORKS)
1 Pathways ( Sandstone finishing) Reapir of cracked areas
Brocken pavers shall be replaced and sand filling
2 Pathways ( Paver finishing)
remaining
3 Bonfire
4 Sitting areas Cleaning required

1: Plaster on out face is reauired to be completed


5 External Boundary
2: Proper cleaning required at outer side areas

9 Electrical Handholes Shall be completed as per drawing


10 Earthing Pits Shall be completed as per drawing
F CYCLE STORAGE
Minor repair required & remaining portions shall be
1 External Graffi
completed
Plaster on Outer walls upto plinth level required to be
2 Plaster work
completed
3 Internal paint work Final coat remaining
4 Internal PCC flooring Proper cleaning required
5 Precast roof slab & roof treatment Testing required
6 Electrical wiring, switch board & Fixture installation To be completed as per directions
1: Final coat of paint remaining
7 MS Doors
2: Sides shall be filled properly with Mortar
8 Ms Grill ventilators Final coat of paint remaining
9 Wire mesh (Galvanized) in ventilators Shall be fixed
10 Fiber shed over Ventilators Gaps shall be filled with Silicon
11 Rain water pipe Need to be fixed properly

15 / 16
DEVELOPMENT OF TOURISM FACILITIES AT KHABEKI LAKE SOON VALLEY
SNAG LIST
DESANG APPROVAL
SR. No DESCRIPTION POINTS
CONTRACTOR CONSULTANTS URBAN UNIT
G EXTERNAL ELECTRICAL WORKS
1 External Wall lights Shall be cleaned
2 External Flood lights Testing required
1: Silicone around glass shall be filled
3 External Garden pole lights
2: Graffi on concrete columns shall be done
4 Earthing To be completed as per BOQ & Drawing
5 Transformer/Meter to Main Pannel Cable laiyng Cable joints shall be done as directed

6 Main DB / Pannel with provision of 2 Connections from wapda Proper taging must be done

7 External DB for lighting,Public toilets, Store room etc Proper taging must be done
8 Main telephone DB with 50 pair connection strip Connections & Testing required
9 Main CATV DB with Cable booster & Spliters Testing required
H EXTERNAL PLUMBING WORKS
1 Sewerage line Shall be cleaned & Test required
Electrical switch must be shifted in Staff quarter near
2 Boring & installation of submersible pump
the boring
Gate valves shall be installed on Hot & Cold pipe
3 Water supply Connection to each building
lines out side of each toilet
4 Gas line piping & Connection to each kitchen & for gyser Testing required
5 Drinking Water supply piping from R.O plant to Each kitchen Testing required
6 Submersible Sluge pump & 400 feet waste pipe

1:Covers shall be fixed properly


7 Manholes, Sockage pit 2: Benching shall be done as per drawing
3: Cocnrete slab over sockage pit with 1 opening

I R.O PLANT
1 Concrete pad for R.O plant
2 Installation of R.O Plant Delivered at site Installation remaining
3 O.H tank (As per BOQ) Required to be installed
J BOARDWALK
Some portions specially on both end required to be
1 Toe walls
redone due to settlement cracks
Concrete at the edges required at some portions &
2 Paver laying
Cleaning required
3 Pebble fixing
4 Sitting area concrete Pads Reapir of cracked areas reuired
5 Concrete patterns on walking track Repair on edges required
6 Storm water Drain Plater repair required at some areas
7 Levelling dressing on lake side Some portions required to be redone
Required to be fixed properly with MS angle & rawal
8 Fixing of concrete benches with floor
bolts
9 Installtion of Dustbins Some Dustins missing
Removal & refixing of tuff pavers on the pathway from guest house
10 Sand filling in gaps required
to boardwalk'
All kiosks shall be connected properly with electrical
11 Wiring for Electrical poles & Kiosks
DB
12 External DB installation MS Grill shall be fixed for safety
13 Garden light poles Silicone around glass shall be filled
14 Sumpits & uPVC pipe installation Required to be done at designated places
K ENTRANCE BOARD
1 Sandstone cladding Replace the broken tiles
2 Paint in engraved writting
3 Pad arround the Signage Concrete around shall be laid properly

16 / 16