six month

? Check if the circuit board and the component are clean;

? Check the temperature and dust of the heat-sink. Use a vacuum cleaner to
clean the module if necessary;
? Replace the air filter if necessary
? Notice! Check the air inlet and outlet. The device may be damaged by
overheating.

Check if the air inlet filter and ventilation ducts of the Turnkey Station
and internal devices are normal Clean or replace the filter

Check the running state of the fan inside the Turnkey Station Check if there
is a crack in the fan blade Check if there is abnormal noise during the
running of the fan;

Routine check the corrosion of the metal components (once six months)

? Annually check the contactors (auxiliary switches and micro-switches) to


ensure the optimal operation
? Check the running parameters (esp., voltage and insulation)

Device maintenance ? Routine check the corrosion of the metal components


(once six months)
? Annually check the contactors (auxiliary switches and micro-switches) to
ensure the optimal operation

? Check the running parameters (esp., voltage and insulation) From every six
months to annually

Safety function ? Check the emergency stop button and the LCD stop function;

? Simulation shutdown
? Check the warning labels and other markings for damage or unclearness
Replace them if necessary From every six months to annually
Software maintenance
? Optimize software
? Check each parameter setting From every six months to annually

LCD time display ? Check if the time displayed on the LCD display is correct;
? Replace the button cells on the back of the LCD panel if time is
incorrect after calibration. From every six months to annually
Firefighting device Check the functionality of the firefighting
devices Follow related regulation where the project is located Other
devices Replace the damaged lighting devices in time When necessary