Content

1 Customer Voice

2 Documentation Improvement

3 One Package for G/U/L 3900 Series Base Stations

4 How to Get Documentation

HUAWEI TECHNOLOGIES CO., LTD. Page 2


Customer Voice
Customer Voice Huawei Action

Features do not have engineering guidelines. We’ve enhanced our Engineering Guidelines in the Feature
Parameter Description. The new guidelines contain planning,
deploying, and maintain features.

The definition of frequency diversity scheduling and frequency We’ve add Figures, more Explicit description and clearer
selective scheduling in the Scheduling Feature Parameter application scenario in Feature Parameter Description
Description is unclear and the application scenarios are missing

Non complete hardware spec and some information is missing. We’ve add more specification information in Technical
Description and Hardware Description, to make it easy for
customers to find the complete information of hardware
specification.

The Commissioning Guide can’t guide me to deploy a site in We’ve add the Automatic OMCH Establishment to describe the
IPSec scenario, there lacks information. information needed when deploy a site. The document is
packaged in the Commissioning Guide
Missing configuration guide of some scenarios, such as We’ve add more configuration scenarios in Reconfiguration
Guide.

HUAWEI TECHNOLOGIES CO., LTD. Page 3


Application Scenarios of Wireless Documents

Focus on Improvement

HUAWEI TECHNOLOGIES CO., LTD. Page 4


Content
2 Documentation Improvement

 Feature Documentation

 Documents about Product Specification

 Documents about Commissioning

 Documents about Configuration

 Documents about Parameter, Counter, Alarm

HUAWEI TECHNOLOGIES CO., LTD. Page 5


Continuous Feature-Oriented Improvements
2013
2012
License control item list is
2011 added in Feature
2010 Engineering Guidelines is
Documentation
added in Feature
Improving the descriptions
2009 Network Impact Report Parameter Description, to
2008 Mapping of Feature ID is added, to describe the describe how to PLAN,
about key feature
algorithm
to Feature Parameter impact on the network DEPLOY and MAINTAIN
Feature delivered at 3 Description is added of new/modified features.
Related alarm list is added
Feature points (PDCP, TR5, features
in the troubleshooting
information and GA) instead of 1 Related Parameter lists chapter of Feature
classified as a point previously. are added in Feature Related Counter list is
Parameter Description
doc category. Parameter Description added in Feature
Parameter Description

HUAWEI TECHNOLOGIES CO., LTD. Page 6


Feature Documentation

2012: New Feature Engineering Guidelines

Plan the Feature Deploy the Feature Maintain the Feature

Planning Suggestions Data Preparation Performance Monitoring

RF planning Hardware Adjustment Parameter Optimization

Network planning Feature Activation Troubleshooting

Hardware planning Reconfiguration


Feature Deactivation
Implemented in:
 SRAN6.0 (GBSS13.0 / RAN13.0 / eRAN2.1)
SRAN7.0 (GBSS14.0 / RAN14.0 / eRAN3.0)
SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0)

HUAWEI TECHNOLOGIES CO., LTD. Page 7


Feature Documentation

2013: License Control Item is Provided for each Feature


Voices of Customers: Needs the compiled license control information

Action:
• License Control Item Description is added, which describes the license control item for each feature.

New

Implementation:
 Packaged in Feature Documentation, and released in Support website.
 Implemented in: SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0)

HUAWEI TECHNOLOGIES CO., LTD. Page 8


Feature Documentation

2013: Improvement on Feature Parameter Reference


Feature Parameter Description
Improved the unclear feature definition and
About This Document benefit
Overview
Introduction
Benefits • Improved: add figures to rich the
Architecture technical description
Technical Description • Improved: more Explicit description and
Related Features clearer application scenario
Network Impact
System Capacity
Network Performance Improved: more Valuable Data Preparation
Engineering Guidelines
 When to Use
Required Information Improved: add the missing feature
 Planning monitoring
 Deployment
Performance Monitoring
Performance Optimization Improved: more Practical Troubleshooting
Troubleshooting
Parameters Improved: add alarm list
Counters

HUAWEI TECHNOLOGIES CO., LTD. Page 9


Feature Documentation
Improve the Unclear Feature Definition and Benefit
eRAN6.0 introduces the new “Overview” chapters in each FPD,
including the feature introduction, benefits and architecture,
improve the unclear definition and benefits.

HUAWEI TECHNOLOGIES CO., LTD. Page 10


Feature Documentation
Add Figures to Rich the Technical Description eRAN6.0

VOC: TI said the definition of frequency diversity scheduling and


frequency selective scheduling in the Scheduling Feature Parameter
Description is unclear and the application scenarios are missing。

Action: add two figures and application scenarios about DL resource


allocation in frequency diversity scheduling and frequency selective
scheduling to help enhance understanding the technical description.

eRAN3.0

HUAWEI TECHNOLOGIES CO., LTD. Page 11


Feature Documentation
More Explicit Description and Clearer Application Scenario
eRAN6.0
VOC: TI asked what is the target IBLER value in the DL CQI adjustment
algorithm? What is the appropriate value? 10%? Why choose this
value?

Action: modify the DL CQI adjustment algorithm in the Scheduling


Feature Parameter Description, making it more clear and accurate.

eRAN3.0

• Why the optimum IBLER value is 10%.


• Which scenarios apply this value.

Vague description

Explicit description
HUAWEI TECHNOLOGIES CO., LTD. Page 12
Feature Documentation

More Valuable Data Preparation


VOC: how to choose the appropriate value for the
CellReselPriority parameter? Larger or small? eRAN6.0

Action: in the Idle Mode Management Feature Parameter


Description, the “Data Preparation” is improved to give
more parameter setting advise, help to decide that the
parameter is set small value or large value.

eRAN3.0

HUAWEI TECHNOLOGIES CO., LTD. Page 13


Feature Documentation

More Practical Troubleshooting


VOC: troubleshooting steps are not practical enough, can not
guide the actual troubleshooting.
eRAN6.0
Action: for example, in the UL Comp Feature Parameter
Description, the “troubleshooting” is rewriting based on actual
field verification and has been actually used to eliminate some
fault.

eRAN3.0

HUAWEI TECHNOLOGIES CO., LTD. Page 14


Feature Documentation

Add Alarm Lists


Voices of Customers:
Add alarm lists in the documents, if new alarms are introduced after the feature is activated.

Action:
• Added related alarm lists in the troubleshooting chapter in Feature Parameter Description about the equipment and transmission. E.g. Synchronization, RAN
Sharing, Transmission Efficiency Improvement, IP Performance Monitor. So that you can know newly introduced alarms due to the feature.

Engineering Guidelines
 When to Use
 Required Information New
 Planning
 Deployment
Performance Monitoring
Performance Optimization
Troubleshooting

Implementation:
 Packaged in Feature Documentation and Product Documentation, and released in Support website.

 Implemented in: SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0)

HUAWEI TECHNOLOGIES CO., LTD. Page 15


Feature Documentation

Add the Section Number and Edition Date of 3GPP Agreement


Voices of Customers:
Need to quote the edition date information of 3GPP agreement.

Action:
• Add the section number and edition date of 3GPP agreement in the Feature Parameter Description, so that you can location of the
information in 3GPP Agreement more quickly.

New
Implementation:
 Packaged in Feature Documentation, and released in Support website.

Implemented in: eRAN6.0

HUAWEI TECHNOLOGIES CO., LTD.


Page 16 Page 16
Content
2 Documentation Improvement

 Feature Documentation

 Documents about Product Specification

 Documents about Commissioning

 Documents about Configuration

 Documents about Parameter, Counter, Alarm

HUAWEI TECHNOLOGIES CO., LTD. Page 17


Add More Information about Product Specification
Voices of Customers:
Non complete product spec and some information is missing.
Action:
New
• Information about signaling specification, hardware specification is added.

Implementation:
Packaged in Product Documentation Hedex, and released in Support website directly.
Implemented in: SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0)

HUAWEI TECHNOLOGIES CO., LTD. Page 18


Specifications of Base Station - 1
Specification Type Specification Position
Cabinet engineering • Input power Technical Description
specification • Dimension and weight
• Surge protection specifications
• Operating temperature and humidity

RF Unit specification Supported Modes and Frequency Bands Technical Description


• RX and TX Channels
• Capacity
• Receiver Sensitivity
• Output Power
• Power Consumption
• Surge protection specifications
• CPRI specification (port number, interface rate, topology, cascading Levels) New
BBU specification • Capacity Technical Description
• Transmission specification
• Signaling specification
 CNBAP specification for NodeB
 Data radio bearer, BHCA, RRC_connected users of UMPT/LMPT specifications for
eNodeB
 signaling specifications for multi-mode base station
• Baseband specification Add reference to Hardware Description, so
• CPRI specification
that all the specifications can be found in the
• BBU input power, dimension and weight
Technical Description now.

HUAWEI TECHNOLOGIES CO., LTD. Page 19


Specifications of Base Station - 2
Specification Type Specification Position
BBU board specification • Baseband specification Hardware Description
(NodeB)  supported cells New
 CE
 Uplink resource group
 HSDPA codes
 HSDPA users
 HSUPA users
• CPRI specification
 port number
 interface rate
 supported cells
BBU board specification • Baseband specification
New Hardware Description
(eNodeB)  Supported cells
 RRC_connected users of LBBP
 RRC_connected users per cell of LBBP
 VoIP user per Cell of LBBP
 Throughput
• CPRI specification
 port number
 interface rate
 supported cells

HUAWEI TECHNOLOGIES CO., LTD. Page 20


Specifications of Controller
Specification Type Specification Position
Cabinet engineering • Input power and power consumption Product Description
specification • Dimension and weight
• Clock precision and accuracy
• Operating temperature and humidity
• Reliability specifications (MTBF and MTTR)

Controller capacity • BHCA Product Description


specifications • Traffic volume
• PS (UL+DL) Data Throughput (for UMTS)
• Number of NodeBs (for UMTS)
• Number of cells (for UMTS)
• Number of TRXs (for GSM)
• Number of configured PDCHs (for GSM)
• Number of active PDCHs (MCS-9)(for GSM)
• Gb interface throughput (for GSM)

Subrack specification • Dimension and weight Hardware Description


• Power consumption

Board specifications •Hardware specifications Hardware Description


 Power consumption
 Dimension and weight
 Operating temperature and humidity
•Processing capability, different board has different processing capability type, such as
 Session setup/release times
 Number of channel identifiers (CIDs)
 CS voice service
 Maximum payload throughput

HUAWEI TECHNOLOGIES CO., LTD. Page 21


Improvement on Capacity Monitoring Guide
Voices of Customers:
Need capacity engineering guide. There should be more on suggestive actions and details on how to do that.
Action:
• Improve capacity monitoring method of each monitoring item, including related commands and methods of capacity improvement.

Why?

What?

How?
Implementation:
Packaged in Product Documentation Hedex, and released in Support website directly.
Implemented in: SRAN7.0 (GBSS14.0 / RAN14.0 / eRAN3.0), SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0)

HUAWEI TECHNOLOGIES CO., LTD. Page 22


Content

2 Documentation Improvement

 Feature Documentation

 Documents about Product Specification

 Documents about Commissioning

 Documents about Configuration

 Documents about Parameter, Counter, Alarm

HUAWEI TECHNOLOGIES CO., LTD. Page 23


Commissioning Guide Improvements-1/2
Voices of Customers: The Commissioning Guide can’t guide me to deploy a site in IPSec scenario, there lacks information.

Action:
Add the Automatic OMCH Establishment to describe the information needed when deploy a site. The document is packaged in the
Commissioning Guide.

Implementation:
 Commissioning Guide covers all information needed when deploy a site now.

 Implemented in: SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0).

HUAWEI TECHNOLOGIES CO., LTD. Page 24


Commissioning Guide Improvements-2/2
Voices of Customers: In the documentation there are parts of the OMCH establishment procedure for which there is very
few information provided or which are not mentioned at all.

Action: Add the detailed automatic OMCH establishment procedure and the configuration requirements for the transmission network,
including the non-IPSec scenario and IPSec scenario.

Implementation:
 Packaged in Product Documentation Hedex, and released in Support website directly.
 Implemented in: SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0)

HUAWEI TECHNOLOGIES CO., LTD. Page 25


Content

2 Documentation Improvement

 Feature Documentation

 Documents about Product Specification

 Documents about Commissioning

 Documents about Configuration

 Documents about Parameter, Counter, Alarm

HUAWEI TECHNOLOGIES CO., LTD. Page 26


More Configuration Scenarios are Provided
Voices of Customers: Missing configuration guide of some scenarios, such as replacing SeGW.

New

New

New
Implementation:
 Packaged in eNodeB Product Documentation, and released in Support website.
 Implemented in:eRAN6.0.

HUAWEI TECHNOLOGIES CO., LTD. Page 27


Content

2 Documentation Improvement

 Feature Documentation

 Documents about Product Specification

 Documents about Commissioning

 Documents about Configuration

 Documents about Parameter, Counter, Alarm

HUAWEI TECHNOLOGIES CO., LTD. Page 28


Disuse Statement is Provided for Parameter, Alarm and Performance Counter

Voices of Customers: Lack the description of parameter disuse.

Action:
• Disuse Statement is added in MO and Parameter Changes, Alarm Changes, and Performance Counter Changes, so that you can plan ahead to
avoid the impact to your network .

New

Implementation:
 Packaged in Release Documents, and released with software in Support website.
 Implemented in: SRAN7.0 (GBSS14.0 / RAN14.0 / eRAN3.0), SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0)

HUAWEI TECHNOLOGIES CO., LTD. Page 29


More Transparency of Reserved Parameter
Voices of Customers:
All parameters should be described including reserved parameters. Reserved parameters should be renamed.
Action:
• Used Reserved Parameter List is to be added, which describes the meaning, value and usage of the parameters, to guides users to
use and configure reserved parameters.

New

Implementation:
Packaged in Product Documentation Hedex, and released in Support website directly.
Implemented in: SRAN7.0 (GBSS14.0 / RAN14.0 / eRAN3.0), SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0)

HUAWEI TECHNOLOGIES CO., LTD. Page 30


Alarm Reference Optimization: Remote handling & Onsite handling
Voices of Customers Huawei Action
• Manpower and high costs are required when engineers perform the network • The “remote handling” and “onsite handling” are described separately .
maintenance on sites, especially at base stations. Therefore, after alarms are reported, • The onsite preparation reminds engineers which tools and equipment
we need to decide whether it is necessary to send engineers to sites to clear them. are necessary.
• Engineers frequently forget to bring important tools to the site. Time and costs are • Packaged in Product Documentation. Implemented in SRAN8.0
wasted the on way back to fetch those tools. (GBSS15.0 / RAN15.0 / eRAN6.0).

SRAN7.0 SRAN8.0

New! tools and


equipment are
necessary for
onsite handling.

HUAWEI TECHNOLOGIES CO., LTD. Page 31


Alarm Reference Optimization: Flow Chart & Detailed Operation
Voices of Customers Huawei Action

• Senior maintenance engineer: I prefer the alarm handling procedure in a • Flowcharts for remote handling and onsite handling have been added.
flowchart instead of that in long paragraphs of words. • More detailed instructions are provided.
• Junior maintenance engineer: I prefer the detailed and step-by-step • For top 25 alarms, implemented in SRAN8.0 (GBSS15.0 / RAN15.0 /
alarm handling instructions. eRAN6.0).

SRAN7.0 SRAN8.0
New!
Flowchart

New! Detailed
instructions

HUAWEI TECHNOLOGIES CO., LTD.


Page 32 Page 32
Alarm Reference Optimization: Detailed Description
Voices of Customers Huawei Action
• We want to learn about how alarms are • Descriptions about detecting and clearing alarms as well as alarm generation
generated and how to clear them. mechanism are added. In addition, the impacts of alarm detecting on OM experiences
and operations are added.
• For top 25 alarms, implemented in SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0).

SRAN7.0 SRAN8.0

HUAWEI TECHNOLOGIES CO., LTD.


Page 33 Page 33
Optimized Alarm Reference
Alarm ID Alarm Name
25800 E1/T1 Loss of Signal
25801 E1/T1 Alarm Indication Signal
25802 E1/T1 Remote Alarm Indication Signal
25833 IMA Group Activated Links Insufficient at Far End
25880 Ethernet Link Fault
25895 Ethernet Trunk Group Fault
25900 IP PM Activation Failure
25901 Remote Maintenance Link Failure
26101 Inter-Board CANBUS Communication Failure
26102 ESN Read Failed
26242 Configuration File Damaged
26262 External Clock Reference Problem
26521 RF Unit RX Channel RTWP/RSSI Too Low
26522 RF Unit RX Channel RTWP/RSSI Unbalanced
26529 RF Unit VSWR Threshold Crossed
28006 Radio Signaling Link Disconnected
28008 Radio Link Failure
28009 Carrier No Traffic
28010 Carrier Configuration Error
28011 RF Unit RX Channel Fault
28203 Local Cell Unusable
28206 Local Cell Capability Decline
28209 Cell No Traffic
29240 Cell Unavailable
29243 Cell Capability Degraded
29247 Cell PCI Conflict
HUAWEI TECHNOLOGIES CO., LTD. Page 34
Content

1 Customer Voice

2 Documentation Improvement

3 One Package for G/U/L 3900 Series Base Stations

4 How to Get Documentation

HUAWEI TECHNOLOGIES CO., LTD. Page 35


One Product Documentation Package for G/U/L 3900 Series Base Stations
Change: The documents for G/U/L single-mode 3900 series Base Stations are not separately packaged for release. Instead, these
documents are packaged in one documentation package.
Change Reason:
Align with the unified SRAN8.0 Base Station software release policy.
It is easier for customer to understand common points and differences between modes.
It is more convenient for customer to manage documentation.
Avoid inconsistent update of the same content in different documents.

SRAN7.0 (GBSS14.0/RAN14.0/eRAN3.0) SRAN8.0 (GBSS15.0/RAN15.0/eRAN6.0)

3900 Series GSM BTS Product


Documentation

3900 Series WCDMA NodeB


Product Documentation 3900 Series Base Station Product
Documentation
3900 Series LTE eNodeB
Product Documentation

MBTS
Product Documentation

HUAWEI TECHNOLOGIES CO., LTD. Page 36


Content

4 How to Get Documentation

 Obtain Documentation by M2000/LMT

 Support Website

 HedEx Lite

 VIP Discussion

HUAWEI TECHNOLOGIES CO., LTD. Page 37


New: Obtain Documentation by M2000/LMT
Voices of Customers: Needs to get the production documentation conveniently when the software is upgraded.

Action:
• Add a menu in M2000 GUI and LMT, which shows the way to get the product documentation.
M2000

2
1

LMT
3 Double click the .hdxi file to download the product
documentation to your computer.
Note: You should have the account for support website.

Implementation:
 Implemented in: SRAN8.0 (GBSS15.0 / RAN15.0 / eRAN6.0)

HUAWEI TECHNOLOGIES CO., LTD. Page 38


Support: Locate a Document Through Navigation

1 After logging in to the


website, select a product Select a product.
from the homepage.

2 Select a Document Type. The default document type is


"Product Documentation".

3 Click a document to view it


online or download it.
You are suggested to
select "HDX file" from the
Product Documentation.

HUAWEI TECHNOLOGIES CO., LTD. Page 39


Support: Locate a Document Through the Search Function
Search at the homepage.
 Enter keywords to search on the
A homepage of the Support website. Or Enter keywords.
click the search button to enter the
Advanced Search page.

Search within a node.


 Search from within a specific node.
B The scope of the search is limited to
The search scope is the
the current node. current node.

Submit your suggestions to


improve the search function.
Filter the search results.

C  Filter the search results to locate the


required document more efficiently.
Filter by product or
document type.

HUAWEI TECHNOLOGIES CO., LTD. Page 40


Support: Enhanced Website Online Functions
 Online Browsing
Customers can browse the document through the website without downloading it.
 Online Scoring
Customers can score the document according to their estimations.
 Online Feedback
Customers can feed back their suggestions and comments directly.

HDX file for online browsing Give scores and feedback directly!

HUAWEI TECHNOLOGIES CO., LTD. Page 41


Brief Introduction to HedEx Lite
 HedEx Lite is a desktop application developed by Huawei to view Huawei product documents in .hdx format. HedEx
Lite runs directly without installation and supports the automatic upgrade of product documents.

Six convenient features of HedEx Lite: Support quick,


accurate, and
Simple and easy
comprehensive search.
to use and require
no installation.

Centrally manage
Automatically Huawei product
upgrade product
HedEx Lite documents.
documents.

Convenient Convenient
document feedback comment function
function

Download it from the homepage of the Support Website.

HUAWEI TECHNOLOGIES CO., LTD. Page 42


HedEx Lite: Obtain Product Documents Easily

Online query and download

A  Log in to HedEx Lite and download


the product documents in .hdx format
through the online query function.

Download

Automatic upgrade of product documents

B  After logging in to HedEx Lite, if a new


Support
version of an .hdx document is released to
the Support Website, HedEx Lite will
remind you to upgrade it.
HedEx
Lite

HUAWEI TECHNOLOGIES CO., LTD. Page 43


HedEx Lite: Manage Huawei Product Documents Centrally

Manage Huawei
.hdx product
document centrally

Manage Huawei product documents in


the format of .hdx by category.

Manage Huawei Support loading the following six


product documents in types of documents to HedEx
other formats centrally
Lite for reading and searching
.
HTML PDF DOC XLS PPT TXT
Load local documents delivered by Huawei
(not in the format of .hdx) to HedEx Lite for
centralized management and use them
through Loading Local Folders.

HUAWEI TECHNOLOGIES CO., LTD. Page 44


HedEx Lite: Load Libraries
Copy a file to the libraries folder
A
Copy an .hdx file to the libraries menu
under the menu of HedEx Lite.

B Add the path


Add a path of the .hdx file through
HDX File Settings.

HUAWEI TECHNOLOGIES CO., LTD. Page 45


VIP Discussion
VIP Principle:
• For Universal Documentations, given reference on how to get them on Documentation area of support website.

• For Pre-sale Documentation and customized documents, released in VIP.

http://support.huawei.com/

VIP Service Visit here to get the


latest version.
TI Project-Wireless Product
+- HedEx Software
Universal Documentations are
+- SRAN Documentation Guide released in support website,
+- SingleRAN including:
•Feature Documentation
+-WCDMA-RAN
• Product Documentation
+-GSM-BSS •NBI Documentation
+-LTE
+-Pre-sale Documentation
+-Feature Documentation
+-Product Documentation
+-NBI Documentation
+-OSS

HUAWEI TECHNOLOGIES CO., LTD. Page 46


Thank you
www.huawei.com

Better Documentation, Better Communication


Register and Create an Account in Three Steps
 Log in to the Support Website (http://support.huawei.com) and
open a common user account.
 Check your email box to receive a confirmation email sent from
Register HWSSO@huawei.com and activate your account. We
recommend that you register with your work email address.

Work email address: is only used by an internal employee of


a company and typically contains the domain name of the
company, for instance: xxx@huawei.com.

 A reminder will pop up when you log in to the website. Click


Upgrade Upgrade Account to upgrade your account to Equipment
Customer, so you can have access to all documents.
 If no reminder pops up, upgrade your account from the
homepage of the Support website->My Support->My Account.

 If you register with your work email, the system will automatically
approve your upgrade, you will become an Equipment
Customer as soon as you click the Upgrade button.
Approve  If not, you will need a local Huawei employee to approve your
upgrade. Please specify the email address of the employee.

If you register with your work email but a local Huawei employee is
still required to approve your account upgrade, contact
supportmaster@huawei.com to register the suffix of your company.

HUAWEI TECHNOLOGIES CO., LTD. Page 48


Improvement Map for all Customer Documentations
2009 2010 2011 2012 2013
Focus on: Focus on: Focus on: Focus on: Focus on:
Document Structure Counters Upgrading and O&M Feature & Para/MML Specification & Capacity
Integrated
Pre-Sale Documentation Configuration Principle

Extend flow chart in Added: Rewrote unclear description Capacity Monitoring Guide
Product Documentation measurement units to the in Para/MML Reference such Hardware Specification
Spare Parts Catalog
counters as may, may be, etc Parameter Reference
Added:
Feature Document Engineering Guidelines Added: License control item list,
Network Impact Report
Feature Activation Guide Added in FPD related alarm list
Added: Feature ID & name
Release Document in the Counter Change Doc Delta Missing
Delivered timely and
Test Document integrally

Consistency between South Bound


NBI Document and North Bound Data

HUAWEI TECHNOLOGIES CO., LTD. Page 49


Add Documents for Co-MPT Base Station
Add: Add documents for Co-MPT Base Station, including MML Command Reference, Parameter Reference, Performance Counter
Reference, Alarm Reference, Event Reference.
Add Reason:
Co-MPT Base Station is introduced in SRAN8.0. The documents for Co-MPT Base Station help customer to use Base Station more
easily.

New! New!
+- Co-MPT Base Station MML Command Reference +- Co-MPT Base Station Performance Counter Reference
+- NodeB MML Command Reference +- NodeB Performance Counter Reference
+- eNodeB MML Command Reference +- eNodeB Performance Counter Reference

New! New!
+- Co-MPT Base Station Parameter Reference +- Co-MPT Base Station Alarm Reference
+- NodeB Parameter Reference +- NodeB Alarm Reference
+- eNodeB Parameter Reference +- eNodeB Alarm Reference
+- Co-MPT Base Station Parameter Reference.xls +- GBTS Alarm Reference
+- NodeB Parameter Reference.xls
+- eNodeB Parameter Reference.xls

HUAWEI TECHNOLOGIES CO., LTD. Page 50

You might also like