Rekapitulasi Beban
Berat Output SAP 750749.59
Jenis Beban
kg 0.4375667
Beban Mati dan Hidup Lantai 586620.00
Beban Mati Dinding 36975.00
Beban Mati Balok 36376.00
Beban Mati Kolom 87493.56
Total Beban 747464.56
747464.56
%
A Kontrol periode fundamental struktur
Perioda T = 1.61 dtk (dari hasil SAP)
Koefisien Ct = 0.0731 (Tabel 15 SNI 1726 2012)
Ketinggian struktur hn = 60.68 m (ketinggian bangunan)
Koefisien x = 0.75 (Tabel 15 SNI 1726 2012)
Koefisien Cu = 1.4 (Tabel 14 SNI 1726 2012)
Periode fundamental pendekatan (Pasal 7.8.2.1 SNI 1726 2012)
Ta = Ct hn^x
= 0.07 22
= ### detik
Perioda fundamnetal struktur (T) tidak boleh melebihi hasil koefisien untuk batasan atas
pada perioda yang dihitung (Cu) dan perioda fundamental pendekatan (Ta)
(Pasal 7.8.2 SNI 1726 2012)
Cu Ta = 1.4 1.589
= 2.22 detik
T < Cu Ta
1.61 < ### OK
B Kontrol simpangan antar lantai
(Pasal 7.9.3 SNI 1726 2012)
δei = Perpindahan elastis yang dihitung akibat gaya gempa desain tingkat kekuatan
δi = Perpindahan yang diperbesar
= Cd.δei/Ie
Δi = Simpangan antar lantai tingkat desain
= (δei-δe(i-1))Cd/Ie
Δi < Δa
Δa = Simpangan antar lantai itngkat ijin
= 0.020 hsx(Tabel 16 SNI 1726 2012)
Untuk rangka pemikul momen yang dirancang untuk kategori desain seismik D tidak boleh melebihi
Δa/ρ (Pasal 7.12.1.1 SNI 1726 2012)
ρ = 1.3 (Pasal 7.3.4.2 SNI 1726 2012)
Faktor pembesaran defleksi Cd = 5.5 (Tabel 9 SNI 1726 2012)
Faktor keutamaan gempa Ie = 1 (faktor keutamaan gempa)
Sumbu x
Δi Δa Ket
δei δi
tinggi δei-
Lantai Elevasi 0.020
antar (dari (Cd.δei/Ie δe(i-1) (δei-δe(i- Δi <Δa
hsx
tingkat SAP) ) 1)) Cd/Ie
(m) (m) (mm) (mm) (mm) (mm) (mm)
Atap 60.68 4.68 62.39 343.145 10.75 59.125 72.000 OK
FFL 56.00 3.00 51.64 284.020 1.28 7.040 46.154 OK
LT. ATAP SL 53.00 4.00 50.36 276.980 1.46 8.030 61.538 OK
LT. 14 49.00 3.30 48.90 268.950 1.13 6.215 50.769 OK
LT. 13 45.70 3.30 47.77 262.735 1.48 8.140 50.769 OK
LT. 12 42.40 3.30 46.29 254.595 1.80 9.900 50.769 OK
LT. 11 39.10 3.30 44.49 244.695 2.14 11.770 50.769 OK
LT. 10 35.80 3.30 42.35 232.925 4.25 23.375 50.769 OK
LT. 9 32.50 3.30 38.10 209.550 0.93 5.115 50.769 OK
LT. 8 29.20 3.30 37.17 204.435 3.01 16.555 50.769 OK
LT. 7 25.90 3.30 34.16 187.880 3.26 17.930 50.769 OK
LT. 6 22.60 3.30 30.90 169.950 3.54 19.470 50.769 OK
LT. 5 19.30 3.30 27.36 150.480 3.87 21.285 50.769 OK
LT. 4 16.00 4.00 23.49 129.195 5.36 29.480 61.538 OK
LT. 3 12.00 4.00 18.13 99.715 5.78 31.790 61.538 OK
LT. 2 8.00 4.00 12.35 67.925 5.64 31.020 61.538 OK
LT. MEZZ 4.00 4.00 6.71 36.905 4.81 26.455 61.538 OK
LT.
SEMI1 0.00 3.10 1.90 10.450 1.90 10.450 47.692 OK
BASEMEN
T -3.10 3.10 0.00 0.000 0.00 0.000 47.692 OK
Sumbu y
Δi Δa Ket
tinggi δei δi δei-
Lantai Elevasi antar δe(i-1) (δei-δe(i- 0.020 hsx Δi <Δa
tingkat (dari SAP)(Cd.δei/Ie) 1)) Cd/Ie
(m) (m) (mm) (mm) (mm) (mm) (mm)
ATAP 60.68 4.68 87.25 479.875 -0.39 -2.145 72.000 OK
FFL 56.00 3.00 87.64 482.020 -1.47 -8.085 46.154 OK
LT. ATAP SL 53.00 4.00 89.11 490.105 1.55 8.525 61.538 OK
LT. 14 49.00 3.30 87.56 481.580 1.62 8.910 50.769 OK
LT. 13 45.70 3.30 85.94 472.670 2.21 12.155 50.769 OK
LT. 12 42.40 3.30 83.73 460.515 2.79 15.345 50.769 OK
LT. 11 39.10 3.30 80.94 445.170 3.32 18.260 50.769 OK
LT. 10 35.80 3.30 77.62 426.910 4.23 23.265 50.769 OK
LT. 9 32.50 3.30 73.39 403.645 3.89 21.395 50.769 OK
LT. 8 29.20 3.30 69.50 382.250 4.73 26.015 50.769 OK
LT. 7 25.90 3.30 64.77 356.235 5.16 28.380 50.769 OK
LT. 6 22.60 3.30 59.61 327.855 5.57 30.635 50.769 OK
LT. 5 19.30 3.30 54.04 297.220 6.10 33.550 50.769 OK
LT. 4 16.00 4.00 47.94 263.670 10.05 55.275 61.538 OK
LT. 3 12.00 4.00 37.89 208.395 10.74 59.070 61.538 OK
LT. 2 8.00 4.00 27.15 149.325 11.18 61.490 61.538 OK
LT. MEZZ 4.00 4.00 15.97 87.835 11.12 61.160 61.538 OK
LT. 1 0.00 3.10 4.85 26.675 4.85 26.675 47.692 OK
SEMI
BASEMEN
T -3.10 3.10 0.00 0.000 0.00 0.000 47.692 OK
= 0.56
6
= 0.09
tetapi tidak perlu melebihi
Cs =
= 0.31
9.66
= 0.03
Harus tidak kurang dari
Cs = 0.04 Sds I ≥ 0.01
= 0.04 0.56 1 ≥ 0.01
= 0.02 ≥ 0.01
Jadi menggunakan besaran Cs = 0.09350
Apabila Vt < 0.85 V maka gaya harus dikalikan dengan 0.85V/V(Pasal 7.9.4.1 SNI 1726 2012)
0.85V = ###
Vt
Maka :
17360.364 kN > ### kN OK arah y
tingkat kekuatan
k boleh melebihi
DEAD XX LIVE(KN)
(
52807.39 10855.47
DL + LL TOTAL
kg kg kg Kn
22289597.3 218438.05354
218586.284
QUAKE X QUAKE Y
kg
9331.274 kN 10037.738
MAX X kg
MAX Y kg
Perhitungan Beban Mati dan Beban Hidup Lantai
Beban Jumlah B L A Beban Total Beban
m m m² kg/m kg/m
Beban Mati
Keramik 16 4 4.5 18 18 5184
Spesi Keramik 16 4 4.5 18 38 10944
ME 16 4 4.5 18 19 5472
Plafond 16 4 4.5 18 5 1440
Penggantung Flafond 16 4 4.5 18 10 2880
Pelat Lantai1 15 4 4.5 18 360 97200
Pelat lantai2 1 5.5 7 38.5 360 13860
Pelat Lantai3 1 5.5 7 38.5 720 27720
Air Hujan 1 4 4.5 18 110 1980
Beban Hidup
Restoran (Sky Lounge) 1 4 4.5 18 520 9360
Restoran 1 4 4.5 18 520 9360
Hall / Lobby 1 4 4.5 18 520 9360
Kamar Hotel 10 4 4.5 18 520 93600
Ruang Hotel Lainnya 3 4 4.5 18 520 28080
316440
25200.09
546331.95
M2 M3
Kgf-m Kgf-m
74830.59 7.84
78226.44 0.35
78079.89 0.46
77963.26 0.42
77767.43 0.42
74319.71 0.39
74693.07 0.57
77723.24 0.6
77644.82 0.38
77564.45 0.42
77461 0.44
74366.36 0.42
74417.02 0.34
77409.09 0.43
77217.92 0.37
77147.89 0.42
77031.07 0.36
73938.4 0.44
73900.15 0.58
77073.51 0.36
76873.6 0.41
76839.05 0.36
76679.23 0.4
73295.05 0.56
TABLE: Joint Reactions
Joint OutputCase CaseType StepType F1 F2 F3 M1
Text Text Text Text Kgf Kgf Kgf Kgf-m
1 QUAKE Y LinRespSpec Max 6198.39 11976.45 91172.75 22324.55
2 QUAKE Y LinRespSpec Max 7856.98 11979.53 70694.49 22334.02
3 QUAKE Y LinRespSpec Max 7678.41 12162.62 70250.12 22660.13
4 QUAKE Y LinRespSpec Max 7653.57 12296.86 71259.64 22920.72
5 QUAKE Y LinRespSpec Max 7622.85 12431.61 72050.45 23180.36
6 QUAKE Y LinRespSpec Max 5902.91 12516.9 74570.19 23388.98
7 QUAKE Y LinRespSpec Max 5967.18 14923.74 49418.83 25287.36
8 QUAKE Y LinRespSpec Max 7554.84 14904.65 28304.84 25294.55
9 QUAKE Y LinRespSpec Max 7404.83 15119.78 27215.72 25647.05
10 QUAKE Y LinRespSpec Max 7376.76 15293.48 27154.79 25946.92
11 QUAKE Y LinRespSpec Max 7362.38 15466.5 28403.48 26244.87
12 QUAKE Y LinRespSpec Max 5755.8 15622.11 43703.97 26529.03
13 QUAKE Y LinRespSpec Max 5941.97 14795.2 43681.88 25112.47
14 QUAKE Y LinRespSpec Max 7512.62 14953.57 26377.9 25363.97
15 QUAKE Y LinRespSpec Max 7360.63 15121.97 26956.76 25650.46
16 QUAKE Y LinRespSpec Max 7335.69 15288.42 27129.84 25940.16
17 QUAKE Y LinRespSpec Max 7319.39 15462.14 28388.15 26239.38
18 QUAKE Y LinRespSpec Max 5718.93 15621.38 43507.37 26527.64
19 QUAKE Y LinRespSpec Max 6076.49 11871.36 83206.22 22149.22
20 QUAKE Y LinRespSpec Max 7716.17 12033.61 68320.75 22413.64
21 QUAKE Y LinRespSpec Max 7544.3 12164.07 69926.85 22663.45
22 QUAKE Y LinRespSpec Max 7539.34 12294.6 71233.95 22916
23 QUAKE Y LinRespSpec Max 7516.93 12430.34 72070.33 23177.63
24 QUAKE Y LinRespSpec Max 5820.64 12515.89 74555.44 23387.08
15622.11
329246.78
M2 M3
Kgf-m Kgf-m
23447.48 15.36
24414.64 0.89
24335.81 1.33
24279.7 0.92
24212.65 1.2
23136.68 0.88
22512.68 1.61
23438.04 1.8
23436.68 0.88
23419.92 1.24
23390.98 0.93
22456.84 1.17
22471.3 0.85
23372.97 1.26
23321.88 0.95
23301.71 1.13
23267.49 0.99
22333.68 1.11
23043.08 1.18
24027.18 0.97
23962.52 1.14
23956.21 0.98
23907.15 1.13
22849.94 0.95
A Kontrol periode fundamental struktur
Perioda T = 2.35 dtk (dari hasil SAP)
Koefisien Ct = 0.0724 (Tabel 15 SNI 1726 2012)
Ketinggian struktur hn = 59.95 m (ketinggian bangunan)
Koefisien x = 0.8 (Tabel 15 SNI 1726 2012)
Koefisien Cu = 1.4 (Tabel 14 SNI 1726 2012)
Periode fundamental pendekatan (Pasal 7.8.2.1 SNI 1726 2012)
Ta = Ct hn^x
= 0.0724 26.4382
= 1.914 detik
Perioda fundamnetal struktur (T) tidak boleh melebihi hasil koefisien untuk batasan atas
pada perioda yang dihitung (Cu) dan perioda fundamental pendekatan (Ta)
(Pasal 7.8.2 SNI 1726 2012)
Cu Ta = 1.4 1.914
= 2.67977 detik
T < Cu Ta
2.35 < 2.680 OK
B Kontrol simpangan antar lantai
(Pasal 7.9.3 SNI 1726 2012)
δei = Perpindahan elastis yang dihitung akibat gaya gempa desain tingkat kekuatan
δi = Perpindahan yang diperbesar
= Cd.δei/Ie
Δi = Simpangan antar lantai tingkat desain
= (δei-δe(i-1))Cd/Ie
Δi < Δa
Δa = Simpangan antar lantai itngkat ijin
= 0.020 hsx (Tabel 16 SNI 1726 2012)
Untuk rangka pemikul momen yang dirancang untuk kategori desain seismik D tidak boleh melebihi
Δa/ρ (Pasal 7.12.1.1 SNI 1726 2012)
ρ = 1.3 (Pasal 7.3.4.2 SNI 1726 2012)
Faktor pembesaran defleksi Cd = 5.5 (Tabel 9 SNI 1726 2012)
Faktor keutamaan gempa Ie = 1 (faktor keutamaan gempa)
Sumbu x
Δi
δei δi
Lantai Elevasi δei-δe(i-1) (δei-δe(i-1))
tinggi antar tingkat (dari SAP) (Cd.δei/Ie) Cd/Ie
(m) (m) (mm) (mm) (mm) (mm)
Atap 60.68 4.68 10.93 60.115 -37.37 -205.535
FFL 56.00 3.00 48.30 265.650 1.60 8.800
LT. ATAP SL 53.00 4.00 47.70 262.350 1.00 5.500
LT. 14 49.00 3.30 46.70 256.850 2.50 13.750
LT. 13 45.70 3.30 45.60 250.800 1.40 7.700
LT. 12 42.40 3.30 44.20 243.100 1.70 9.350
LT. 11 39.10 3.30 42.50 233.750 2.10 11.550
LT. 10 35.80 3.30 40.40 222.200 2.30 12.650
LT. 9 32.50 3.30 38.10 209.550 2.70 14.850
LT. 8 29.20 3.30 35.40 194.700 2.90 15.950
LT. 7 25.90 3.30 32.50 178.750 3.20 17.600
LT. 6 22.60 3.30 29.30 161.150 3.50 19.250
LT. 5 19.30 3.30 25.80 141.900 3.80 20.900
LT. 4 16.00 4.00 22.00 121.000 5.20 28.600
LT. 3 12.00 4.00 16.80 92.400 5.50 30.250
LT. 2 8.00 4.00 11.30 62.150 5.30 29.150
LT. MEZZ 4.00 4.00 6.00 33.000 4.40 24.200
LT. 1 0.00 3.10 1.60 8.800 1.60 8.800
SEMI
BASEMENT -3.10 3.10 0.00 0.000 0.00 0.000
Sumbu y
Δi
δei δi
Lantai Elevasi δei-δe(i-1) (δei-δe(i-1))
tinggi antar tingkat (dari SAP) (Cd.δei/Ie) Cd/Ie
(m) (m) (mm) (mm) (mm) (mm)
Atap 60.68 4.68 10.93 60.115 -37.37 -205.535
FFL 56.00 3.00 48.30 265.650 1.60 8.800
LT. ATAP SL 53.00 4.00 47.70 262.350 1.00 5.500
LT. 14 49.00 3.30 46.70 256.850 2.50 13.750
LT. 13 45.70 3.30 45.60 250.800 1.40 7.700
LT. 12 42.40 3.30 44.20 243.100 1.70 9.350
LT. 11 39.10 3.30 42.50 233.750 2.10 11.550
LT. 10 35.80 3.30 40.40 222.200 2.30 12.650
LT. 9 32.50 3.30 38.10 209.550 2.70 14.850
LT. 8 29.20 3.30 35.40 194.700 2.90 15.950
LT. 7 25.90 3.30 32.50 178.750 3.20 17.600
LT. 6 22.60 3.30 29.30 161.150 3.50 19.250
LT. 5 19.30 3.30 25.80 141.900 3.80 20.900
LT. 4 16.00 4.00 22.00 121.000 5.20 28.600
LT. 3 12.00 4.00 16.80 92.400 5.50 30.250
LT. 2 8.00 4.00 11.30 62.150 -1.10 -6.050
LT. MEZZ 4.00 4.00 12.40 68.200 8.80 48.400
LT. 1 0.00 3.10 3.60 19.800 3.60 19.800
SEMI
BASEMENT -3.10 3.10 0.00 0.000 0.00 0.000
= 0.561
8
= 0.070125
tetapi tidak perlu melebihi
Cs =
= 0.314
21.438181
= 0.0146468
Harus tidak kurang dari
Cs = 0.044 Sds I ≥ 0.01
= 0.044 0.561 1 ≥ 0.01
= 0.024684 ≥ 0.01
Jadi menggunakan besaran Cs = 0.02468
Apabila Vt < 0.85 V maka gaya harus dikalikan dengan 0.85V/Vt (Pasal 7.9.4.1 SNI 1726 2012)
0.85V = 5.460
Vt
ari hasil SAP)
bel 15 SNI 1726 2012)
etinggian bangunan)
bel 15 SNI 1726 2012)
bel 14 SNI 1726 2012)
kat kekuatan
Δa Ket
0.020 hsx Δi <Δa
(mm)
72.000 OK
46.154 OK
61.538 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
61.538 OK
61.538 OK
61.538 OK
61.538 OK
47.692 OK
47.692 OK
Δa Ket
0.020 hsx Δi <Δa
(mm)
72.000 OK
46.154 OK
61.538 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
50.769 OK
61.538 OK
61.538 OK
61.538 OK
61.538 OK
47.692 OK
47.692 OK
espon spektrum)
espon spektrum)
bel 9 SNI 1726 2012)
ktor keutamaan gempa)
asal 7.9.4.1 SNI 1726 2012)