PERHITUNGAN
Tabel 4.2 Data tanah pada bagian tanah dasar ( SUB GRADE )
1.5 9.5 3.6 2.1 7.4 2.2 10.2 2.1 3.6 2.1
7.4 2.2 10.2 2.1 1.8 9.2 1.5 8.4 10.2 2.1
4.1 1.8 9.2 7.5 2.3 10.2 2.1 4.5 9.2 1.5
6.5 2.4 3.6 2.4 5.3 10.2 2.1 7.1 10.2 2.1
1.8 9.2 1.5 5.4 7.4 2.3 10.2 4.2 9.2 1.5
2.3 10.2 6.1 2.5 3.6 2.1 7.4 2.2 10.2 9.1
2.1 6.2 7.4 5.5 10.2 4.1 8.8 9.2 1.5 5.4
4.8 9.2 3.5 6.1 9.2 1.5 6.3 10.2 2.1 8.5
2.3 10.2 12.1 7.1 10.2 2.1 2.5 3.6 6.1 7.4
7.4 2.3 10.2 4.2 6.2 7.4 5.5 10.2 2.1 11.8
100
90
80
70
60
50
40
30
20
10
0
1 2 3 4 5 6 7 8 9 10
CBR DESAIN 3,6% CBR
Dari Grafik di atas didapatkan CBR segmen = 3.6
4 Menentukan CBR segmen dengan cara analitis dan DDT
Menggunakan Metode Statis :
Tabel 4.5 Penentuaan CBR design cara analitis
Jarak CBR x-ẋ (x - ẋ)²
0 + 000 2.1 3.49 12.1801
0 + 200 3.6 1.99 3.9601
0 + 400 4.2 1.39 1.9321
0 + 600 5.3 0.29 0.0841
0 + 800 5.5 0.09 0.0081
1 + 000 6.1 -0.51 0.2601
1 +200 6.2 -0.61 0.3721
1 + 400 6.3 -0.71 0.5041
1 + 650 7.4 -1.81 3.2761
1 + 900 9.2 -3.61 13.0321
n = 10 Σ = 55.90 Σ = 35.61
a) Σ CBR
CBR rata-rata =
n
55.90
CBR rata-rata =
10
x = 5.59
b) Standar Deviasi ( δ )
Σ (x - ẋ)²
δ=
n
35.61
=
10
= 1.89
Jalan dibuka pada tahun 2015 dengan umur Rencana ( UR ) 15 tahun , data LHR tercatat
pada tahun 2013, maka dapat dibuat klasifikasi jalan sebagai berikut :
2015 2025
Umur Rencana
n = 10 tahun
c.) Tabel 4.12 Jumlah kendaraan dalam Satuan Mobil Penumpang (SMP) 15 tahun
NO Jenis Kendaraan Jumlah Kendaraan
Koefisien Kendaraan
Lebar Perkerasan (L) Jumlah Lajur ( n )
Ringan Berat
Perhitungan LET 15
( ∑ LEP + ∑ LEA )
LET =
2
= 569.930 + 2781.727
2
= 1960.794
4.2.8. Menghitung Lintas Ekivalen Rencana ( LER )
Perhitungan LER 15
UR
LER = LET x
10
10
= 1960.794
10
= 1960.794
= 17.962 %
Sumber : Petunjuk Perencanaan Tebal Perkerasan Lentur Jalan Raya dengan metode Analisa Kompon
Depaertemem Pekerjaan Umum (1987)
Didapat nilai Lintas Ekivalen Rencana ( LHR )
Klasifikasi jalan arteri primer ( jalan utama ) dari perhitungan SMP > 20.000
LER 10 = 92.063 = 100 - 1000 maka diperoleh nilai :
4.3.3. Penentuan Indeks Permukaan (Ip)
ITP dapat ditentukan melalui grafik nomogram. Untuk menentukan ITP dari grafik nomogram di perluk
sebagai berikut, IP, IPo, DDT, LER, dan FR. Untuk mendapatkan angka Ipo, dapat dilihat pada tabel be
Tabel 4.19 Indek Permukaan (IP)
Roughnes
Jenis Permukaan Ipo
( mm / km )
LASTON ≥4 ≤ 1000
3.9 - 3.5 > 1000
LASBUTAG 3.9 - 3.5 ≤ 2000
3.4 - 3.0 > 2000
HRA 3.9 - 3.5 ≤ 2000
3.4 - 3.0 > 2000
BURDA 3.9 - 3.5 < 2000
BURTU 3.4 - 3.0 < 2000
LAPEN 3.4 - 3.0 ≤ 3000
2.9 - 2.5 > 3000
LATASBUM 2.9 - 2.5
BURAS 2.9 - 2.5
LATASIR 2.9 - 2.5
JALAN TANAH ≤ 2.4
JALAN KERIKIL ≤ 2.4
Sumber : Petunjuk Perencanaan Tebal Perkerasan Lentur Jalan Raya dengan metode Analisa Komponen
Depaertemem Pekerjaan Umum (1987)
Dari data diatas maka digunakan Nomogram 1 untuk mencari nilai ITP
Dari grafik diatas diperoleh nilai ITP = 8.0
1. Lapisan Permukaan
Tebal Minimum
ITP Bahan
( cm )
< 3.00 5 Lapisan Pelindung ( buras/burtu/burda)
3.00 - 6.70 5 Lapen/aspal macadam,HRA, Lasbutag ,Laston
6.71 - 7.49 7.5 Lapen/aspal macadam,HRA, Lasbutag ,Laston
7.50 - 9.99 7.5 Lasbutag, Laston
≥ 10.00 10 Laston
Dari tabel diatas jika diketahui nilai ITP = 10.5 maka tebal minimum lapisan permukaan dengan bahan
laston = 10 cm
2. Lapisan Pondasi
Tebal Minimun
ITP Bahan
( cm )
< 3.00 15 Batu pecah, stabilitas tanah dengan semen,
stabilitas tanah dengan kapur
3.00 - 7.49 20 Batu pecah, stabilitas tanah dengan semen,
stabilitas tanah dengan kapur
10 Laston Atas
7.50 - 9.99 20 Batu pecah, stabilitas tanah dengan semen,
stabilitas tanah dengan kapur,pondasi macadam
15 Laston Atas
10 - 12.14 20 Batu pecah, stabilitas tanah dengan semen,
stabilitas tanah dengan kapur,pondasi macadam,
Lapen, Laston Atas
≥ 12.25 25 Batu pecah, stabilitas tanah dengan semen,
stabilitas tanah dengan kapur,pondasi macadam,
Lapen, Laston Atas
Dari tabel diatas jika diketahui nilai ITP = 10.5 maka tebal minimum lapisan
pondasi dengan bahan Laston Atas = 20 cm
3. Tebal Lapiasn Pondasi Bawah
Untuk setiap nilai ITP bila digunakan pondasi bawah, tebal minimum adalah 10 cm
Berdasarkan Daftar I Jumlah Lajur Berdasarkan Lebar Perkerasan ,
maka lebar perkerasan untuk 4 Lajur adalah 5.50 ≤ L < 8.25 m.
Untuk itu Lebar perkerasan jalan direncanakan 8 m
dengan panjang jalan yang direncanakan 2500 m
0.30 - - 340 - -
0.35 - - 744 - -
0.32 - - 590 - -
LASBUTAG
0.28 - - 454 - -
0.26 - - 340 - -
- 0.28 - 590 - -
- 0.26 - 454 - - LASTON ATAS
- 0.24 - 340 - -
- 0.23 - - - - LAPEN (MEKANIS)
- 0.19 - - - - LAPEN (MANUAL)
- 0.15 - - - - Stab tanah dengan
- 0.13 - - - - semen
- 0.15 - - 22 -
Stab dengan kapur
- 0.13 - - 18 -
- 0.14 - - - 100 Batu pecah (Kelas A)
- 0.13 - - - 80 Batu pecah (Kelas B)
- 0.12 - - - 60 Batu pecah (Kelas C)
- - 0.13 - - 70 Sirtu/pitrun (Kelas A)
- - 0.12 - - 50 Sirtu/pitrun (Kelas B)
- - 0.11 - - 30 Sirtu/pitrun (Kelas C)
- - 0.1 - - 20 Tanah Lempung
Sumber : Petunjuk Perencanaan Tebal Perkerasan Lentur Jalan RayaKepasiran
dengan metode Analisa Komponen
Direncanakan
a Lapisan Permukaan (surface Course), dengan :
D1 = .... cm
a1 = 0.40 (Laston Ms 744 kg)
LASTON
LASTON ATAS
Sirtu/pitrun (Kelas B)
Lapisan Tanah Dasar
A1
A2
A3
a LHR tercatat
2025
buka
Jumlah
Arah kanan
Kendaraan
5802 11523
555 1056
402 793
302 593
42 81
14046
12463.28 kend/hr
1142.17 kend/hr
857.71 kend/hr
641.4 kend/hr
87.61 kend/hr
15192 kend/hr
24746 kend/hr
kend/hr
kend/hr
kend/hr
kend/hr
kend/hr
kend/hr
deral Bina Marga, 1970 )
III )
Angka Ekivalen ( E )
= 0.0004
= 0.1593
= 0.3500
= 1.0375
0.2923
= 1.3195
EKERJAAN UMUM)
sien Kendaraan
Berat
0.45
= 1.50
= 81.88
= 135.09
= 299.45
= 52.02
= 569.93 kend/hr
C
0.3 = 3.97
0.45 = 400.10
0.45 = 660.14
0.45 = 1463.31
0.45 = 254.21
Σ LEA = 2781.73 kend/hr
100%
Kelandaian III
( > 10%)
% kendaraan berat
> 30 %
2.0 - 2.5
3.0 - 3.5
gan metode Analisa Komponen,
peroleh nilai : 2
Roughnes
mm / km )
≤ 1000
> 1000
≤ 2000
> 2000
≤ 2000
> 2000
< 2000
< 2000
≤ 3000
> 3000
2
an
/burtu/burda)
RA, Lasbutag ,Laston
RA, Lasbutag ,Laston
an permukaan dengan bahan
emen,
emen,
emen,
i macadam
emen,
i macadam,
emen,
i macadam,
abel-tabel berikut.
an metode Analisa Komponen
0.28 * 20 +
* D1
0.28 * D2 +
* D2
0.28 * 20 +
LASTON ( LP )
LASTON ATAS ( LPA )
Sirtu/pitrun (Kelas B) ( LPB )
Lapisan Tanah Dasar
5 cm
20 cm
40 cm
4.4 Perhitungan Volume Pekerjaan Perkerasan
RUWASJA ( RUANG PENGAWASAN JALAN )
BADAN JALAN
80
DRAINASE
CL
CL 2%
2%
2% 2%
10
0.05 0.03
8
8 m
800
a. LΔ = 1/2 x a x t
= 1/2 x 7 x 0.02
= 0.07 m²
b. L segiempat = L x t
= 7 x 0.03
= 0.21 m²
L Total = a + b
= 0.070 + 0.210
= 0.28 m²
Volume ( V ) = L Total x P
= 0.280 x 2050
= 574 m³
20
18
2 8 m 2
150 800 150
Sket Lapis Pondasi Atas
20
H2 0.25H1
18
0.22
150
h2 = 0.25 - 0.03
= 0.22 m
t = h1 - h2
= 0.25 - 0.22
= 0.03 m
LΔ = 1/2 x a x t
= 1/2 x 2 x 0.03
= 0.03 m²
L segiempat = 0.22 x 2
= 0.44 m²
Jadi, L1 = 0.470 x 2
= 0.94 m²
V1 = 0.94 x 2050
= 1927 m³
b. Perhitungan Volume Lapisan Pondasi Atas
L = Lebar x Tebal
= 7 x 0.2
= 1.40 m²
V = 1.40 x 2050
= 2870 m³
0.4
10
150 800
Lapisan Pondasi Bawah
CL
10
1.5 12 m 1.5
150 800
Sket Lapis Pondasi Bawah
a. Bahu Jalan
L = Lebar x Tebal
= 2 x 0.4
= 0.80 m²
V = 0.80 x 2050
= 1640 m³
L = Lebar x Tebal
= 7 x 0.4
= 2.80 m²
V = 2.80 x 2050
= 5740 m³
DRAINASE
120
lebar jalan = 7
lebar bahu = 2
panjang = 2050
Bahu Jalan
2%
150
Bahu Jalan
2%
150
150
150
KEPUTUSAN GUBERNUR NUSA TENGGARA BARAT
NOMOR : 910.2 - 478a TAHUN 2014
TENTANG
STANDAR SATUAN HARGA PEMERINTAH PROVINSI
NUSA TENGGARA BARAT TAHUN ANGGARAN 2015
UPAH PEKERJA
1 2 3 4 5
1 Pekerja OH 55,000.00 60,000.00
2 Pekerja terlatih OH 72,600.00 78,400.00
3 Tukang Batu OH 93,500.00 102,500.00
4 Kepala Tukang Batu OH 99,000.00 108,500.00
5 Tukang Kayu OH 99,000.00 108,500.00
6 Kepala Tukang Kayu OH 99,000.00 108,500.00
7 Tukang Besi OH 93,500.00 102,500.00
8 Kepala Tukang Besi Beton OH 99,000.00 108,500.00
9 Tukang Las OH 93,500.00 102,500.00
10 Kepala Tukang Las OH 82,500.00 92,500.00
11 Tukang Pelitur OH 75,000.00 85,000.00
12 Tukang Cat OH 75,000.00 85,000.00
13 Kepala Tukang Cat OH 80,000.00 90,000.00
14 Pemecah Batu OH 55,000.00 61,000.00
15 Penggergaji OH 55,000.00 61,000.00
16 Mandor Pengisi Bronjong OH 75,000.00 85,000.00
17 Pengisi Bronjong OH 51,000.00 61,000.00
18 Penganyam Bronjong OH 75,000.00 85,000.00
19 Kepala Penganyam Bronjong OH 80,000.00 90,000.00
20 Mandor OH 86,000.00 95,500.00
21 Sopir OH 70,500.00 80,000.00
22 Pembantu sopir OH 55,000.00 61,000.00
23 Mekanik OH 79,000.00 87,500.00
24 Pembantu Mekanik OH 72,500.00 82,500.00
25 Operator alat ringan OH 62,500.00 72,500.00
26 Operator alat berat OH 87,500.00 97,500.00
27 Pembantu operator OH 60,000.00 70,000.00
28 Pemasak aspal OH 55,000.00 61,000.00
29 Penunjuk Jalan OH 85,000.00 95,000.00
30 Tukang Pipa PVC OH 62,500.00 72,500.00
31 Tukang Pipa Besi OH 62,500.00 72,500.00
32 Tukang Listrik OH 65,000.00 75,000.00
33 Kepala Tukang Listrik OH 72,500.00 82,500.00
34 Penjaga malam OB sesuai UMP yang berlaku
35 Satpam OB sesuai UMP yang berlaku
37 Petugas Kebersihan OB sesuai UMP yang berlaku
38 Tenaga Pemantau Isi Siaran Radio dan Televi OB sesuai UMP yang berlaku
39 Porter untuk kegiatan survey OH 150,000.00 150,000.00
40 Guide OH 175,000.00 175,000.00
41 Petugas Pusat Informasi Pariwisata :
- Diploma OB sesuai UMP yang berlaku
- Sarjana OB sesuai UMP yang berlaku
42 Petugas Penjaga Objek Wisata OB sesuai UMP yang berlaku
BAHAN PASANGAN DAN TANAH
HARGA (Rp)
NO URAIAN SATUAN
P. Lombok P. Sumbawa
1 2 3 4 5
1 Batu belah 15 cm - 20 cm m³ 157,500.00 165,000.00
2 Batu Paras m³ 189,000.00 198,000.00
3 Batu kali alam m³ 169,000.00 177,100.00
4 Batu pecah 5-7 cm m³ 216,300.00 226,600.00
5 Batu pecah 3-5 cm m³ 271,950.00 284,900.00
6 Batu pecah 2-3 cm m³ 293,300.00 307,300.00
7 Kerikil alam 2/3 cm m³ 292,900.00 306,900.00
8 Kerikil Sungai - Royalti m³ 277,200.00 290,400.00
9 Kerikil pecah 1/2 cm m³ 283,500.00 297,000.00
8 Kerikil Alam 1 cm m3 283,500.00 297,000.00
9 Koral Beton m3 157,500.00 165,000.00
10 Agregate 2-3 (stone crusher) m³ 311,850.00 326,700.00
11 Agregate 1-2 (stone crusher) m³ 384,300.00 402,600.00
12 Aggregat Klas B (20% Agg.Hls : 80% Agg.Ks m³ 194,250.00 203,500.00
13 Bata merah kelas 1 buah 680.00 700.00
14 Bata merah kelas 2 buah 570.00 600.00
15 Pasir Beton (PB) m³ 157,500.00 165,000.00
16 Pasir pasang m³ 141,750.00 148,500.00
17 Pasir urug m³ 126,000.00 132,000.00
18 Sirtu m³ 138,000.00 144,500.00
19 Tanah urug Biasa m³ 99,750.00 104,500.00
20 Tanah urug Pilihan m³ 131,250.00 137,500.00
21 Tanah Liat (TL) m³ 173,250.00 181,500.00
22 Semen Merah (SM) m³ 189,000.00 198,000.00
23 Semen Warna kg 13,125.00 13,700.00
24 Semen PC. Merk Tiga Roda (kg) 1,480.00 77,500.00
25 Semen PC. Merk Gresik (kg) 1,470.00 77,000.00
26 Semen PC. Merk Tonasa (kg) 1,428.00 74,800.00
27 Semen PC. Merk Bosowa (kg) 1,365.00 71,500.00
28 Semen PC. Merk Holcim (kg) 1,386.00 72,600.00
29 PC Mortar Tiga Roda (kg) 1,627.50 85,200.00
30 Rumput Gebalan m² 21,000.00 22,000.00
31 Kapur gamping kg 1,575.00 1,650.00
32 Kapur biasa kg 735.00 750.00
33 List plafon (propil) 4/4 cm m 21,000.00 22,000.00
34 Aspal (Aspal Concrete/ AC ) Kg 14,700.00 16,800.00
35 Aspal (Medium Curring/ MC) Kg 15,750.00 18,000.00
36 Aspal emulsi Kg 13,650.00 15,600.00
37 Filler (abu batu ) Kg 2,400.00 2,500.00
38 Buton Granular Asphalt (BGA) Kg 2,200.00 2,300.00
39 Air Liter 125.00 150.00
40 Strorox -100 Kg 31,500.00 33,000.00
41 HB 20 buah 630.00 650.00
42 HB 15 buah 630.00 650.00
43 HB 10 buah 630.00 650.00
BAHAN ATAP
SATUAN HARGA (Rp)
NO URAIAN
SATUAN P. Lombok P. Sumbawa
1 2 3 4 5
1 Sirap Kalimantan buah 2,140.00 2,310.00
2 Genteng Lokal buah 2,140.00 2,200.00
3 Genteng Beton/Pres buah 5,350.00 5,780.00
4 Genteng karang pilang/Kodok buah 3,210.00 3,470.00
5 Genteng Pejaten (sudah di cat) buah 2,680.00 2,840.00
6 Genteng Kaca buah 14,560.00 15,650.00
7 Genteng Keramik buah 16,050.00 17,330.00
8 Genteng Karang Pilang type keramik buah 5,890.00 6,300.00
9 Bubungan Genteng Lokal buah 2,470.00 2,630.00
10 Bumbungan Genteng Beton buah 6,000.00 6,410.00
11 Bubungan Genteng Silang buah 3,540.00 3,780.00
12 Bubungan Genteng Pejaten buah 3,860.00 4,100.00
13 Bubungan Genteng Keramik buah 13,910.00 15,020.00
14 Bubungan Karang Pilang buah 8,560.00 9,240.00
15 Atap Metalroof 3,5 mm (Lapis Butiran) m² 246,100.00 265,650.00
16 Bubungan Metalroof (lapis buriran) m' 96,300.00 103,950.00
17 Atap Metal 3,5 mm (tanpa Lapis Butiran) m² 214,000.00 231,000.00
18 Bubungan Metal (tanpa lapis butiran) m' 85,600.00 92,400.00
19 Asbes type genteng (tyluq) lembar 53,500.00 57,750.00
20 Ijuk kg 21,400.00 23,100.00
21 Asbes Gelombang 92 x 180 lembar 37,990.00 40,950.00
22 Asbes Gelombang 105 x 240 lembar 128,400.00 138,600.00
23 Bubungan Asbes Gelombang 92 cm lembar 32,640.00 35,180.00
24 Bubungan Asbes Gelombang 105 cm lembar 69,020.00 74,450.00
25 Seng Glmb. Besar BJLS 20 lembar 51,360.00 55,440.00
26 Seng Glmb. Besar BJLS 25 lembar 62,060.00 66,990.00
27 Seng Glmb. Besar BJLS 30 lembar 69,550.00 75,080.00
28 Seng Glmb. Kecil BJLS 20 lembar 58,850.00 63,530.00
29 Seng Plat BJLS 18 lebar 90 cm m' 24,080.00 25,940.00
30 Seng Plat BJLS 20 lebar 90 cm m' 32,100.00 34,650.00
31 Seng Plat BJLS 25 lebar 90 cm m' 48,150.00 51,980.00
32 Seng Plat BJLS 28 lebar 90 cm m' 58,850.00 63,530.00
33 Seng Plat BJLS 30 lebar 90 cm m' 69,550.00 75,080.00
34 Seng Spandek 3 mm lebar 70 cm m' 57,780.00 62,370.00
35 Seng Spandek 3,5 mm lebar 70 cm m' 69,550.00 75,080.00
36 Seng Spandek 4 mm lebar 70 cm m' 82,930.00 89,460.00
BAHAN KAYU
SATUAN HARGA (Rp)
NO URAIAN
P. Lombok P. Sumbawa
1 2 3 4 5
1 Papan Kayu Klas I m³ 17,655,000.00 18,150,000.00
2 Papan Kayu Klas II m³ 13,375,000.00 13,750,000.00
3 Papan Kayu Klas III m³ 4,815,000.00 4,950,000.00
4 Balok Kayu Klas I m³ 17,120,000.00 17,600,000.00
5 Balok Kayu Klas II m³ 12,840,000.00 13,200,000.00
6 Balok Kayu Klas III m³ 4,280,000.00 4,400,000.00
7 Dolken / Perancah Dia. 7 Cm - 4 M batang 18,700.00 19,200.00
8 Papan kayu bekisting m³ 3,210,000.00 3,300,000.00
9 Balok kayu bekisting m³ 2,675,000.00 2,750,000.00
10 Lumbersering Kls I m² 428,000.00 440,000.00
11 Lumbersering Kls II m² 374,500.00 385,000.00
12 Kaso-kaso (5 x 7) cm Kayu Kelas II m³ 5,000,000.00
13 Reng (3 x 4) cm Kayu Kelas II m³ 4,000,000.00
BAHAN BAMBU
NO URAIAN SATUAN HARGA (Rp)
P. Lombok P. Sumbawa
1 2 3 4 5
1 Bambu (dia.12,5 cm, P - 6 m) batang 21,400.00 22,000.00
2 Bambu (dia.10 cm, P- 6 m) batang 18,750.00 19,200.00
3 Bambu (dia.7 cm, P- 6 m) batang 16,100.00 16,500.00
4 Bedek kulitan m² 39,000.00 40,100.00
5 Bedek biasa m² 37,450.00 38,500.00
6 Bedek pagar m² 30,500.00 31,300.00
7 Bilik bambu m² 32,100.00 33,000.00
BAHAN CETAK
NO URAIAN SATUAN HARGA (Rp)
P. Lombok P. Sumbawa
1 2 3 4 5
1 Lubang Angin 10x20 Cm buah 7,070.00 7,200.00
2 Lubang Angin 20x20 Cm buah 7,490.00 7,700.00
3 Lubang Angin 30x30 Cm buah 9,100.00 9,300.00
4 Buis Beton Dia. 10 Cm bh.L= 0.5M 48,150.00 49,500.00
5 Buis Beton Dia. 20 Cm bh.L= 0.5M 56,180.00 57,700.00
6 Buis Beton Dia. 30 Cm bh.L= 0.5M 67,410.00 69,300.00
7 Buis Beton Dia. 40 Cm bh.L= 0.5M 81,320.00 83,600.00
8 Buis Beton Dia. 60 Cm bh.L= 0.5M 102,190.00 105,000.00
9 Buis Beton Dia. 80 Cm bh.L= 0.5M 133,750.00 137,500.00
10 Bataco 10 x 20 x 40 Cm buah 2,570.00 2,600.00
11 Paving blok press type bata t=8 cm buah 2,360.00 2,400.00
12 Paving blok biasa type bata t=6 cm buah 1,930.00 1,900.00
13 Paving blok press type berlian t= 8 m buah 2,470.00 2,500.00
14 Roster Pejaten buah 58,850.00 60,500.00
BAHAN LANTAI
NO URAIAN SATUAN HARGA (Rp)
P. Lombok P. Sumbawa
1 2 3 4 5
1 Tegel Abu-abu 20 x 20 m² 38,900.00 39,900.00
2 Tegel Bergaris Abu 20 x 20 Cm m² 49,700.00 51,000.00
3 Tegel Warna 20 x 20 Cm. m² 43,100.00 44,200.00
4 Tegel Bergaris Warna 20 x 20 Cm m² 54,600.00 56,100.00
5 Tegel Traso Klas I 30 x 30 m² 56,000.00 57,500.00
6 Tegel Traso Klas II 30 x 30 m² 50,700.00 52,000.00
7 Keramik dinding m² 65,200.00 66,900.00
8 Keramik KW I (Motif) m² 84,300.00 86,500.00
9 Keramik KW II (Motif) m² 71,300.00 73,200.00
10 Keramik KW I (Polos) m² 57,500.00 59,000.00
11 Keramik KW II (Polos) m² 51,700.00 53,100.00
12 Keramik Cutting 30 X 50 m² 138,600.00 142,400.00
13 Marmer 100/100 m² 340,400.00 349,900.00
14 Marmer m² 289,700.00 297,700.00
15 Beton grid pracetak m² 70,700.00 72,600.00
16 Porselin 11/11 m² 63,600.00 65,300.00
17 Porselin 10/20 m² 63,600.00 65,300.00
18 Porselin 20/20 m² 68,000.00 69,800.00
19 Ubin Keramik 30/30 m² 60,000.00 61,600.00
20 Ubin Keramik 33/33 m² 41,200.00 42,300.00
21 Ubin Keramik 40/40 m² 60,000.00 61,600.00
22 Ubin Keramik 20/20 m² 60,000.00 61,600.00
23 Ubin Keramik 10/33 m² 69,600.00 71,500.00
24 Mozaik 30/30 m² 32,700.00 33,500.00
25 Ubin Keramik artistik 10/20 m² 38,900.00 39,900.00
26 Ubin Keramik artistik 10/10 m² 77,700.00 79,800.00
27 Keramik artistik 5/20 m² 282,500.00 290,400.00
28 Keramik artistik 10/20 m² 148,400.00 152,400.00
29 Plint Keramik artistik 10/10 m² 247,200.00 254,100.00
30 Plint Keramik artistik 10/20 m² 148,400.00 152,400.00
31 Plint Keramik artistik 5/20 m² 106,000.00 108,900.00
32 Plint Internal Cove artistik 5 x 5/20 m² 22,100.00 22,600.00
33 Ubin Abu-abu 20/20 m² 41,800.00 42,900.00
34 Ubin Abu-abu 30/30 m² 41,700.00 42,700.00
35 Ubin Abu-abu 40/40 m² 41,700.00 42,700.00
36 Plint Ubin Abu-abu 15/20 m² 27,900.00 28,600.00
37 Plint Ubin Abu-abu 15/30 m² 28,000.00 28,700.00
38 Plint Ubin Abu-abu 10/40 m² 41,800.00 42,900.00
39 Ubin Warna 20/20 m² 48,400.00 49,700.00
40 Ubin Warna 30/30 m² 48,400.00 49,700.00
41 Ubin Warna 40/40 m² 48,200.00 49,500.00
42 Plint Ubin Warna 10/20 m² 48,800.00 50,100.00
43 Plint Ubin Warna 10/30 m² 48,500.00 49,800.00
44 Plint Ubin Warna 10/40 m² 24,200.00 24,800.00
45 Ubin Teraso 30/30 m² 59,400.00 61,000.00
46 Ubin Teraso 40/40 m² 59,400.00 61,000.00
47 Plint Ubin Teraso 10/30 m² 59,400.00 61,000.00
48 Plint Ubin Teraso 10/40 m² 59,400.00 61,000.00
49 Ubin Granit 30/30 m² 185,600.00 190,700.00
50 Ubin Granit 40/40 m² 185,500.00 190,600.00
51 Plint Ubin Granit 10/30 m² 185,600.00 190,700.00
52 Plint Ubin Granit 10/40 m² 185,500.00 190,600.00
53 Ubin Teralux Kerang 30/30 m² 200,100.00 205,700.00
54 Ubin Teralux Kerang 40/40 m² 200,100.00 205,700.00
55 Plint Ubin Teralux Kerang 10/30 m² 200,700.00 206,200.00
56 Plint Ubin Teralux Kerang 10/40 m² 200,100.00 205,700.00
57 Ubin Teralux Marmer 30/30 m² 215,100.00 221,100.00
58 Ubin Teralux Marmer 40/40 m² 215,100.00 221,100.00
59 Ubin Teralux Marmer 60/60 m² 215,100.00 221,100.00
60 Plint Ubin Teralux Marmer 10/30 m² 262,200.00 269,500.00
61 Plint Ubin Teralux Marmer 10/40 m² 285,700.00 293,700.00
62 Plint Ubin Teralux Marmer 10/60 m² 238,700.00 245,300.00
63 Teraso Cor m³ 667,400.00 686,000.00
64 Batu Teraso (Krikil sikat) kg 5,300.00 5,300.00
65 Batu Granit (Krikil sikat) kg 11,200.00 11,400.00
66 Karpet m² 91,900.00 94,300.00
67 Underlayer / rubber corrugated m² 98,900.00 101,600.00
68 Parquet m² 127,200.00 130,600.00
69 Gymfloor (Lantai Kayu) m² 127,200.00 130,600.00
70 Vinyl 30/30 m² 106,000.00 108,900.00
71 Vinyl karet 30/30 m² 196,900.00 202,400.00
72 Batu Hias buah 2,200.00 2,200.00
BAHAN BESI
NO URAIAN SATUAN HARGA (Rp)
P. Lombok P. Sumbawa
1 2 3 4 5
1 Besi Beton Ulir kg 19,300.00 19,800.00
2 Besi Beton Polos kg 18,200.00 18,700.00
3 Besi Profil Siku ST 33 Kg 16,100.00 16,500.00
4 Besi Plat kg 19,500.00 20,000.00
5 Besi profil siku ST 37 Kg 19,500.00 20,000.00
6 Besi Baja WF dan Sejenisnya ST 37 Kg 20,200.00 20,600.00
7 Besi Black steel (S40) Kg 20,900.00 21,400.00
8 Alluminium Kuzen tebal 1,2 mm (natural) m' 149,800.00 154,000.00
9 Alluminium Kuzen tebal 1,2 mm (Warna) m' 160,500.00 165,000.00
10 Besi canal C Kg 19,500.00 20,000.00
11 Kawat Beton kg 24,800.00 25,400.00
12 Kawat Nyamuk Besi m² 24,800.00 25,400.00
13 Kawat Nyamuk Plastik m² 19,300.00 19,800.00
14 Kawat Saringan Pasir m² 24,200.00 24,800.00
15 Kawat Duri rol 120,100.00 123,400.00
16 Kawat Bronjong 3 mm kg 31,800.00 32,600.00
17 Kawat Bronjong 4 mm kg 31,800.00 32,600.00
18 Kawat 3 mm (gulungan) kg 17,200.00 17,600.00
19 Kawat Las kg 35,400.00 36,300.00
20 Jaring kawat baja dilas Kg 19,300.00 19,800.00
21 Besi Angkur Ø 8 mm Kg 19,100.00 19,600.00
22 Besi strip tebal 5 mm Kg 19,300.00 19,800.00
23 Besi strip 2 x 3 mm Kg 19,300.00 19,800.00
24 Baja strip (0,2 x 2) cm Kg 19,300.00 19,800.00
25 Baja strip Kg 19,300.00 19,800.00
26 Besi list kaca (1 x 1) cm m 256,800.00 264,000.00
27 Pintu gulung besi m2 588,500.00 605,000.00
28 Pintu lipat baja Folding door M2 247,200.00 254,100.00
29 Sunscreen alluminium M2 353,100.00 363,000.00
30 Rolling door alluminium M2 535,000.00 550,000.00
31 Alumunium strip M 49,500.00 50.80
32 Alumunium voil Lbr 106,000.00 108,900.00
33 Pintu Alumunium M 120,900.00 124,100.00
34 Profil kaca alluminium M 50,300.00 51,700.00
35 Jendela nako (rangka + kaca 5 mm) M2 224,700.00 231,000.00
36 Kawat 4 mm (gulungan) kg 17,200.00 17,600.00
37 Kawat bronjong pabrikasi lubang 8x10 unit 454,800.00 467,500.00
Heavy Galv. Uk. 2.0 x 1.0 x 0.5 dia 2.7
mm
38 Kawat bronjong pabrikasi lubang 8x10 unit 513,600.00 528,000.00
Heavy Galv. Uk. 2.0 x 1.0 x 0.5 dia 3
mm
39 Kawat bronjong pabrikasi lubang 8x10 unit 620,600.00 638,000.00
Heavy Galv. & PVC Uk. 2.0 x 1.0 x 0.5
dia 2.7 mm
40 Kawat bronjong pabrikasi lubang 8x10 674,100.00 693,000.00
Heavy Galv. Uk. 3.0 x 1.0 x 0.5 dia 2.7 mm unit
INSI
015
6
55000
KETERANGAN
6
KETERANGAN
6
KETERANGAN
KETERANGAN
KETERANGAN
6
KETERANGAN
6
KETERANGAN
161,058.00
KETERANGAN
6
KETERANGAN
6
KETERANGAN
6
KETERANGAN
KETERANGAN
6
KETERANGAN
KETERANGAN
6
KETERANGAN
6
KETERANGAN
6
KETERANGAN
6
N
KETERANGAN
6
4.5 Rencana Anggran Biaya ( RAB ) dan Rekapitulasi
REKAPITULASI
Kegiatan : Pembangunan Infrastruktur Jalan
Pekerjaan : Pekerasan Jalan Baru
Sumber dana : APBN
Lokasi : Mataram
T.A. : 2015
Jumlah Harga
No Jenis Pekerjaan
Rp.
Terbilang : Enam Belas Milyar Enam Ratus Lima Puluh Tujuh Juta Tiga Ratus Lima Puluh Dua Ribu Rupiah
A
Jumlah Harga
Rp.
9,231,421,705.47
3,481,580,522.87
12,713,002,228.34
266,491,929.20
266,491,929.20
2,163,553,610.64
2,163,553,610.64
Jumlah Harga
Rp.
9,231,421,705.47
3,481,580,522.87
266,491,929.20
2,163,553,610.64
15,143,047,768.18
1,514,304,776.82
16,657,352,544.99
16,657,352,000.00
piah
DAFTAR HARGA SATUAN UPAH
NTB
TAHUN ANGGARAN 2018
Rp 15,014.29 Rp 105,100.00
Rp 13,757.14 Rp 96,300.00
Rp 12,971.43 Rp 90,800.00
Rp 14,142.86 Rp 99,000.00
Rp 13,357.14 Rp 93,500.00
Rp 15,328.57 Rp 107,300.00
Rp 11,400.00 Rp 79,800.00
Rp 11,000.00 Rp 77,000.00
Rp 12,571.43 Rp 88,000.00
Rp 10,071.43 Rp 70,500.00
Rp 9,585.71 Rp 67,100.00
Rp 6,142.86 Rp 43,000.00
Rp 6,571.43 Rp 46,000.00
Rp 7,571.43 Rp 53,000.00
Rp 11,000.00 Rp 77,000.00
KET
6
167,200.00
329,100.00
260,000.00
80,000.00
187,000.00
256,800.00
322,800.00
348,200.00
456,200.00
326,020.00
415,839.17
149,600.00
187,000.00
148,900.00
148,900.00
155,800.00
19,100.00
2,120,000.00
6,125.00
6,125.00
11,572.00
195,000.00
87,900.00
39,400.00
9,500.00
47,000.00
201,630.00
31,000.00
36,500.00
9,500.00
40,870.00
39,260.00
37,325.00
266,000.00
2,495,150.00
5,207,600.00
7,250.00
6,700.00
65,320.00
1,528,580.00
1,003,682.00
420,553.00
148,104.00
38,190.00
28,600.00
38,600.00
55,000.00
KETERANGAN
6
ITEM PEMBAYARAN NO. : 6.3 (5a) Analisa EI-635(a)
JENIS PEKERJAAN : Lapisan Permukaan (Laston)
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.00 KM
5 Tebal Lapis (AC-WC) padat t 0.05 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.40 %
11 Berat Isi bahan :
- AC-WC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2 (M92) 0.0383 M3
1.b. Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3 (M91) 0.0372 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 2.3142 Kg
1.d. Aspal = (As x (D1 x tM3) x Fh2) x 1000 (M10) 6.4519 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 1.10 menit
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : A M P Q2 457.93 M2
Produksi AC-WC / hari = Tk x Q5 Qt 3,205.52 M2
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0218 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0022 Jam
Rp. 464,271.65 / M2
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.00 KM
5 Tebal Lapis (AC) padat t 0.06 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30 18.00 %
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 50.30 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 26.30 % memenuhi -
- Semen FF 0.90 % Spesifikasi
- Asphalt As 4.50 %
11 Berat Isi bahan :
- AC-Base D1 2.32 ton / M3
- Agr Pch Mesin 20 - 30 mm D2 1.42 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D3 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D4 1.57 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Agr 20-30 = ("20-30" x (D1 x 1M3) x Fh1) : D2 (M93) 0.3088 M3
1.b. Agr 5-10 & 10-20 = ("5-10 & 10-20" x (D1 x 1M3) x Fh1) : D3 (M92) 0.8629 M3
1.c. Agr 0-5 = ("0-5" x (D1 x 1M3) x Fh1) : D4 (M91) 0.4081 M3
1.d. Semen = (FF x (D1 x 1M3) x Fh1) x 1000 (M05) 21.9240 Kg
1.e. Aspal = (As x (D1 x 1M3) x Fh2) x 1000 (M10) 107.532 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 21.47 M3
Produksi AC-BC / hari = Tk x Q5 Qt 150.26 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.3261 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0466 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.00 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Sirtu Fh3 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 - lepas
Faktor Efisiensi alat Fa 0.83 - kondisi sedang
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0595 jam
- Mandor = (Tk x M) : Qt - 0.0085 jam
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E.052 Jam 0.0011 354,451.55 386.43
2. AMP E.155 Jam 0.0022 76,414.05 166.87
3. Genset E.311 Jam 0.0022 18,310.52 39.99
4. Dump Truck E.211 Jam 0.0417 177,259.41 7,389.50
5. Asp. Finisher E.157 Jam 0.0013 190,269.45 242.58
6. Tandem Roller E.081 Jam 0.0033 211,966.67 690.22
7 P. Tyre Roller E.084 Jam 0.0015 183,268.29 266.30
8 Alat Bantu Ls 1.0000 266,000.00 266,000.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E.052 Jam 0.0218 354,451.55 7,728.60
2. AMP E.155 Jam 0.0466 76,414.05 3,559.85
3. Genset E.311 Jam 0.0466 18,310.52 853.02
4. Dump Truck E.211 Jam 0.9994 177,259.41 177,152.29
5. Asphalt Finisher E.157 Jam 0.0212 190,269.45 4,043.04
6. Tandem Roller E.081 Jam 0.0543 211,966.67 11,503.67
7 P. Tyre Roller E.084 Jam 0.0242 183,268.29 4,438.29
8 Alat Bantu Ls 1.0000 266,000.00 266,000.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E.052 jam 0.0085 354,451.55 3,011.14
2. Dump Truck E.211 jam 0.4848 177,259.41 85,928.03
3. Motor Grader E.010 jam 0.0022 662,199.79 1,429.80
4. Tandem Roller E.081 jam 0.0178 211,966.67 3,783.43
5. Water Tanker E.182 jam 0.0141 218,086.08 3,065.47
6. Alat Bantu Ls 1.0000 266,000.00 266,000.00
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
4 X 460,063 = 1,840,250.46
0 KODE
KOTA MATARAM ANALISA BIAYA E.010
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 662,200 = 3,310,998.96
0 KODE
KOTA MATARAM ANALISA BIAYA E.031
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 711,158 = 3,555,790.83
0 KODE
KOTA MATARAM ANALISA BIAYA E.040
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 312,271 = 1,561,354.71
0 KODE
KOTA MATARAM ANALISA BIAYA E.052
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 354,452 = 1,772,257.8
0 KODE
KOTA MATARAM ANALISA BIAYA E.053
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 176,640 = 883,199.70
0 KODE
KOTA MATARAM ANALISA BIAYA E.080
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 239,116 = 1,195,579.40
0 KODE
KOTA MATARAM ANALISA BIAYA E.081
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 211,967 = 1,059,833.36
0 KODE
KOTA MATARAM ANALISA BIAYA E.082
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 183,268 = 916,341.45
0 KODE
KOTA MATARAM ANALISA BIAYA E.084
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 264,994 = 1,324,971.81
0 KODE
KOTA MATARAM ANALISA BIAYA E.087
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
4 X 201,658 = 806,631.95
0 KODE
KOTA MATARAM ANALISA BIAYA E.088
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
3 X 28,948 = 72,370.60
0 KODE
KOTA MATARAM ANALISA BIAYA E.089
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
2 X 22,035 = 44,069.59
0 KODE
KOTA MATARAM ANALISA BIAYA E.130
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
2 X 194,597 = 389,194.71
0 KODE
KOTA MATARAM ANALISA BIAYA E.153
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
3 X 76,414 = 191,035.11
0 KODE
KOTA MATARAM ANALISA BIAYA E.155
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
4 X 1,021,273 = 4,085,091.23
0 KODE
KOTA MATARAM ANALISA BIAYA E.157
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
4 X 190,269 = 761,077.78
0 KODE
KOTA MATARAM ANALISA BIAYA E.182
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 218,086 = 1,163,125.75
0 KODE
KOTA MATARAM ANALISA BIAYA E.211
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 215,193 = 1,075,966.90
0 KODE
KOTA MATARAM ANALISA BIAYA E.212
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 276,642 = 1,383,208.03
0 KODE
KOTA MATARAM ANALISA BIAYA E.221
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 177,259 = 886,297.07
0 KODE
KOTA MATARAM ANALISA BIAYA E.252
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 26,520 = 132,599.09
0 KODE
KOTA MATARAM ANALISA BIAYA E.253
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
5 X 28,809 = 144,046.24
0 KODE
KOTA MATARAM ANALISA BIAYA E.301
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
3 X 76,691 = 191,727.14
0 KODE
KOTA MATARAM ANALISA BIAYA E.341
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
3 X 24,267 = 60,666.92
0 KODE
KOTA MATARAM ANALISA BIAYA E.401
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
2 X 74,579 = 149,157.75
0 KODE
KOTA MATARAM ANALISA BIAYA E.501
SUB DINAS BINA MARGA PERALATAN
PROPINSI KODE KOTA KODE DISIAPKAN
NUSA TENGGARA BARAT [52] MATARAM [02] DPPW-MTR
2. LAIN - LAIN
Asuransi 3 % Thn + PPN 10% = 3.30% x Harga
Jam / tahun
3 X 20,773 = 51,933.11
PROPINSI :NTB
KOTA : MATARAM
ANALISA BIAYA PEKERJAAN
KOTA MATARAM PRODUKSI CAMP. ASPAL BETON UNTUK LAPIS
SUB DINAS PONDASI ATAS ( LATASTON ATAS )(DENGAN ALAT)
BINA MARGA
URAIAN ANGAPAN / ASUMSI
1. Semua material dikirim oleh suplier 1. ATBL dihasilkan dari AMP produksi 100 ton / hari
2. Whell Loader menjaga BIN selalu penuh. 2. Dipakai agregat pecah tersaring
3. Produksi mesin 100 ton / hari 3. Aspal dipanaskan lebih dulu agar aspal sudah siap saat dimulai
4. Hasil produksi diangkut dengan dump truk 4. Biaya produksi termasuk pengangkutan sampai 10 km dari AMP
dengan ditutup terpal untuk menjaga 5. Dimuat dalam dump truck 5 ton dan dikirim ke lokasi pekerjaan
temperatur 6. Umur alat bantu rata rata 1 bl/org/set
7. Sesuai spesifikasi BM No. 3/PT/B/1983
PROPINSI :NTB
KOTA : MATARAM
ANALISA BIAYA PEKERJAAN
KOTA MATARAM
SUB DINAS PRODUKSI CAMP. ASPAL BETON AGREGAT
BINA MARGA ( LASBUTAG )( DENGAN BURUH )
URAIAN ANGAPAN / ASUMSI
1. Asbuton ukuran besar dipecah dengan 1. Menggunakan tenaga manusia 30 ton / hari
tenaga manusia 2. Material dikirim kelokasi pencampuran
2. Masukkan asbuton pilihan + minyak flux 3. Asbuton dipecah dengan tangan agar dapat melewati saringan 1 cm
kedalam alat pencampur 4. Asbuton pilihan dicampur dengan munyak flux atau minyak aspal lebih
3. Bahan campuran tersebut disimpan dan kurang dari volume ( 201 / ton ), waktu pencampuran ( 1 x pencampuran
dilindungi volume 0,35 m3 ) adalah 10 menit
4. Bahan campuran dimuat kedalam truk dan 5. Bahan campuran disimpan dan dilindungi selama 3 - 15 hari
diantara ke tempat pekerjaan 6. Pengisian ke truck dan pembongkaran dengan tenaga manusia sejauh 10 km
PROPINSI :NTB
KOTA : MATARAM
ANALISA BIAYA PEKERJAAN
KOTA MATARAM
SUB DINAS PENGUPASAN DAN PEMBERSIHAN SEMAK
BINA MARGA PADA DAMIJA ( DENGAN BURUH )
URAIAN ANGAPAN / ASUMSI
1. Mengupas dan membuang semak pada 1. Menggunakan tenaga manusia ( 17 m x 100 m )/hari
damija ( daerah milik jalan ) 2. Hasil kerja 25 m2 /orang/hari
3. Penggunaan alat bantu rata rata 1 bulan - orang
4. Bakarlah sampah di tempat pekerjaan
PEKERJA JUMLAH HARI KODE JUMLAH UPAH
ORANG OH Rp/Org/Hr
PROPINSI :NTB
KOTA : MATARAM
ANALISA BIAYA PEKERJAAN
KOTA MATARAM
SUB DINAS PEMADATAN TANAH DASAR
BINA MARGA ( DENGAN BURUH )
URAIAN ANGAPAN / ASUMSI
PROPINSI :NTB
KOTA : MATARAM
ANALISA BIAYA PEKERJAAN
KOTA MATARAM
SUB DINAS PEMBENTUKAN BAHU JALAN KERAS
BINA MARGA ( DENGAN BURUH )
URAIAN ANGAPAN / ASUMSI
1. Material timbunan yang baik dihampar 1. Menggunakan tenaga manusia ( 250 m3/hari, pemadatan 2500 m bahu jalan )
dengan tenaga manusia 2. 10 cm timbunan padat dibutuhkan untuk 1 m lebar bahu jalan
2. Dipadatkan dengan menggunakan mesin 3. Material dikirim kelokasi oleh pemasok
gilas bergetar 4. Pemasuk menimbun material disekitar bahu jalan
5. Material dihampar kelokasi dengan tenaga manusia
6. Pemadatan dengan mesin gilas bergetar kecil
PROPINSI :NTB
KOTA : MATARAM
ANALISA BIAYA PEKERJAAN
KOTA MATARAM
SUB DINAS KONSTRUKSI LAPIS PONDASI BAWAH ( LPB )
BINA MARGA KELAS B ( MENGGUNAKAN ALAT )
URAIAN ANGAPAN / ASUMSI
PROPINSI :NTB
Kota : MATARAM
ANALISA BIAYA PEKERJAAN
KOTA MATARAM
SUB DINAS KONSTRUKSI LAPIS PONDASI BAWAH ( LPB )
BINA MARGA KELAS B ( DENGAN BURUH )
URAIAN ANGAPAN / ASUMSI
PROPINSI :NTB
Kota : MATARAM
ANALISA BIAYA PEKERJAAN
KOTA MATARAM MENGHAMPAR CAMP. ASPAL, BUTON, AGG. 3 CM
SUB DINAS ( MENGGUNAKAN BURUH )
BINA MARGA B = 20, B = 21, B = 22, B = 23
URAIAN ANGGAPAN / ASUMSI
1. Mandor menempatkan papan tebal 2,5 cm se 1. Menggunakan tenaga manusia 750 m3/hari
panjang as jalan dan tepi jalan 2. Aspal campuran dikirim oleh leveransir ketempat pekerjaan
2. Tack coat aspal disemprotkan dipermukaan 3. Pemakaian campuran dingin 16.7 ton/m2 dalam tebal 3 cm
yang sudah bersih 4. Pemakaian aspal untuk tack coat 0,5 ltr/m2 dengan tenaga manusia
3. Asbuton dihampar langsung dari truk dengan
tenaga manusia
4. Pemadatan dengan mesin gilas
PROPINSI :NTB
Kota : MATARAM
ANALISA BIAYA PEKERJAAN
KOTA MATARAM
SUB DINAS MENGHAMPAR LAPIS PONDASI ATAS ASPAL BETON
BINA MARGA LASTON ATAS ( MENGGUNAKAN ALAT )
URAIAN ANGGAPAN / ASUMSI
PROPINSI :NTB
Kota : MATARAM
ANALISA BIAYA PEKERJAAN
KOTA MATARAM
SUB DINAS PEMBENTUKAN DAN PERATAAN BAHU JALAN
BINA MARGA ( MENGGUNAKAN ALAT )
URAIAN ANGGAPAN / ASUMSI
1. Grader melakukan satu kali lintasan untuk 1. Menggunakan alat berat
memotong dan satu kali lintasan untuk 2. Mandor mengawasi juga pekerjaan lain
meratakan
2. Buruh melakukan pembersihan sekeliling 3. Meratakan bahu jalan 5 Km/hari
gorong - gorong termasuk rintangan 4. Harga satuan ini untuk satu sisi jalan
210,200.00
96,300.00
429,200.00
239,400.00
528,000.00
301,000.00
322,000.00
2,126,100.00
BIAYA SUB TOTAL
(Rp) (Rp)
4,675,000.00
112,690,000.00
53,200.00
15,467,700.00
132,885,900.00
BIAYA SUB TOTAL
(Rp) (Rp)
3,190,063.95
382,070.23
9,682,456.18
1,840,250.46
2,844,632.66
17,939,473.48
152,951,473.48
PER TON
KERJAAN
KODE
TON AGREGAT K.030 1,324,316.00
N BURUH )
at melewati saringan 1 cm
k flux atau minyak aspal lebih
encampuran ( 1 x pencampuran
selama 3 - 15 hari
ngan tenaga manusia sejauh 10 km
105,100.00
159,600.00
176,000.00
1,075,000.00
92,000.00
1,607,700.00
BIAYA SUB TOTAL
(Rp) (Rp)
1,496,000.00
2,737,200.00
11,460,000.00
12,720,000.00
3,675,000.00
3,471,600.00
266,000.00
35,825,800.00
BIAYA SUB TOTAL
(Rp) (Rp)
2,151,933.81
144,046.24
2,295,980.05
39,729,480.05
PER TON
56
KERJAAN
KODE
RSIHAN SEMAK K.210 1,207.12
N BURUH )
BIAYA SUB TOTAL
(Rp) (Rp)
105,100.00
1,548,000.00
1,653,100.00
BIAYA SUB TOTAL
(Rp) (Rp)
399,000.00
399,000.00
BIAYA SUB TOTAL
(Rp) (Rp)
0.00
2,052,100.00
PER M2
KERJAAN
KODE
DASAR K.341 1,376.34
UH )
210,200.00
107,300.00
2,838,000.00
3,155,500.00
BIAYA SUB TOTAL
(Rp) (Rp)
53,200.00
53,200.00
BIAYA SUB TOTAL
(Rp) (Rp)
1,195,579.40
1,195,579.40
4,404,279.40
PER M2
KERJAAN
KODE
LAN KERAS K.410 86,029.96
UH )
210,200.00
2,838,000.00
46,000.00
3,094,200.00
BIAYA SUB TOTAL
(Rp) (Rp)
16,740,000.00
665,000.00
17,405,000.00
BIAYA SUB TOTAL
(Rp) (Rp)
1,008,289.93
1,008,289.93
21,507,489.93
PER M3
KERJAAN
KODE
SI BAWAH ( LPB ) K.510 361,757.08
KAN ALAT )
n 600 m2/hari
BIAYA SUB TOTAL
(Rp) (Rp)
105,100.00
214,600.00
88,000.00
172,000.00
579,700.00
BIAYA SUB TOTAL
(Rp) (Rp)
14,526,000.00
8,008,600.00
5,930,600.00
8,802,540.00
10,771,200.00
266,000.00
48,304,940.00
BIAYA SUB TOTAL
(Rp) (Rp)
3,310,998.96
1,195,579.40
872,344.32
5,378,922.68
54,263,562.68
PER M3
KERJAAN
KODE
SI BAWAH ( LPB ) K.511 426,583.37
BURUH )
105,100.00
107,300.00
88,000.00
2,838,000.00
3,138,400.00
BIAYA SUB TOTAL
(Rp) (Rp)
5,810,400.00
3,133,800.00
2,737,200.00
3,260,200.00
4,338,400.00
532,000.00
19,812,000.00
BIAYA SUB TOTAL
(Rp) (Rp)
1,772,257.75
872,344.32
2,644,602.07
25,595,002.07
PER M3
KERJAAN
BUTON, AGG. 3 CM KODE
URUH ) K.631 98,624.81
B = 23
105,100.00
214,600.00
645,000.00
92,000.00
106,000.00
1,162,700.00
BIAYA SUB TOTAL
(Rp) (Rp)
59,594,220.08
6,494,000.00
3,934,480.00
212,800.00
70,235,500.08
BIAYA SUB TOTAL
(Rp) (Rp)
1,195,579.40
916,341.45
458,484.27
2,570,405.12
73,968,605.20 1.6666667
164374.68 98624.807
PER M2 5.753E+09 164374.68
328749.36
11670602
3.5
KERJAAN
KODE
TAS ASPAL BETON K.528 3,597,560.60
NAKAN ALAT )
105,100.00
429,200.00
516,000.00
424,000.00
1,474,300.00
BIAYA SUB TOTAL
(Rp) (Rp)
152,951,473.48
112,200.00
2,578,500.00
1,041,480.00
133,000.00
156,816,653.48
BIAYA SUB TOTAL
(Rp) (Rp)
1,195,579.40
916,341.45
229,242.14
951,347.23
306,763.43
3,599,273.64
161,890,227.12
PER M3
KERJAAN
KODE
AN BAHU JALAN K.855 1,828,584.86
ALAT )
BIAYA SUB TOTAL
(Rp) (Rp)
105,100.00
107,300.00
172,000.00
384,400.00
BIAYA SUB TOTAL
(Rp) (Rp)
53,200.00
53,200.00
BIAYA SUB TOTAL
(Rp) (Rp)
3,310,998.96
3,310,998.96
3,748,598.96
PER Km