On ‘Notifiable Projects’ you MUST, in addition to those
duties above, make sure that you:
‘Appoint 2M Coordinatr’ to advise and assist you and also to
co-ordinate aangements fr Health Safety during the design and
planning phase. The Approved Code of Practice
oP) requies
that appointment shouldbe before significant detaled design work
which "nelades preparation ofthe nial concept design and
implementation of any strategic brie." (ACOP pare 66). Designers
ae ot permitted 10 undertake any other design work until the
(COM Co-ordinator has been appointed
18 Appoint "Principal Conractr'as soon as practicable toate on
buldabily and maintainability and later t plan & manage the
construction work
8 Do ot allow constuction works to start unt the Pinal
Contactor has prepared a suitable Construction Phase Plan and pu
18 Age the contents an format ofthe ‘Health & Safety Fle
provide the COM Co-ordinator with relevant information fo this
ment The COM Co-ordinator wll ensure the Health & Safety
Fils prepared, reviewed or updated (as appropriate) ready for
handing over to you on completion ofthe work. This isan important
legal document
sm Keep the Heath & Stay Files
nd rake it avalable to anyone
who may need it inthe future, and explain its purpose to them You
must abo update it whenever necessary, When you
dispose of your
interest inthe structure you must also pass onthe Fle to those
acting it
(once appointed, your CDM Co-otdnatr”can help you cary out al your
‘other dates but unl you make this appointment you wl be deemed to be
caring out the COM Co-editor’ utes yoursel An early appointment
isnot only quite but also makes alot of sense!
WHAT HAPPENS IF YOU DON
uaa
= youfal to appoint a ‘COM Co-ordinator 'rncipl Cot
yeu wil be legally abe fr their ts and wil be deemed to be
Carrying them out
= You coud leave youse open to potential very expensive ci
action
15 You wil miss the opportunity to gan from the advantages sted
above, and
‘You coud face criminal prosecution by the HSE
Getting the ight people to do what they are supposed todo under these
regulations fs particulary important when you dont have much experience
‘of constuction or Heath & Safety, so you ned to be reasonably sure that
those you appoint are competent and capable of carying out thelr wark on
your particular projet
“he Asocation for Pojct Safety keeps a database of Individual and
Rogistered Paces who can act as CDM Co-ordinators and coud advise
and assist onal projects if required to do so — whist the Professional
Insttuons shoud be abe to help with the selection of Designers
Don't forget that once appointed for a Notable Project, your COM
CCovoinatc can help yu carry out all your dubs and a good designer
shoud be able to advise you on how you can comply with your dues on
‘most Non Notifiable Projects.
1 you need any further information, contact:
The Associaton fr Projet Safety
Stanhope House
2 Stanhope Place
Feinburgh £412 5H
Tel 08456 121 290,
Fe 08456 121 291
Eal:infot@aps or uk
website at hap:
psorg.uk
The HSE canbe contacted on HSE nflne - 0845 345 0055, ors thelr
website at htp/tmwezhsegouuk
The Asocton for rj Salty ia UK Company Limite by Guante and
Registered in Setend 5155374
sea. o7
fe
HAT CLIENTS NEED
ut
|YOU AND THE REGULATIONS: you ae about to ale or extend a
building or structure, thinking of putting up anew one of demolishing an
‘existing on, then the Construction (Design and Management) Regulations
2007 place a numberof spctc duties on you, The extent ofthese varies
with the ype of project involved ~ and for many projects you wll eed an
advise available o help you deal with these. On larger projects you ae
required to appoint this adviser entitled “COM Co-ordinator” before
significant detailed design work stars so that they can advise and asst
you wth al of your duties
‘The aim ofthese Regulations is to make Health & Safety an essential and
integral par ofthe planning and management of projects and to make
sure that eveyone works together to reduce the rk othe Heath & Salty
‘of those who work onthe srecture, wo maybe affected by these works,
(or who will us it asa place ar work once is completed
‘Advantages for You: If everyone involved in your project
complies with the CDM Regs, they will help:
'= Improve planning and management ands hp ensue thatthe
projec is completed on ie, within budget and ta the equied
standards
‘mee costs delays and bad publicity resulting from accident oil
heath
1 Make sure that cleaning, maintenance and repair ses have been
though through
1m Reduce whole life costs of he buldng structure
11 Provide wsefulinfrmaton forthe maintenance and possible fate
development ofthe buidinglstuctre
The Regulations recognise that you ~ the Clint - hold the power to
influence and control those you engage or appoint on a project, and
therefore thatthe ultimate responsiblity forthe achievement ofa safe
projets in your hands as mech a thes
The Regulations are about making sure that there i
'= Early appointment or engagement of competent and capable key
people or erganisatios that have sufficient resources
1m A realistic project programme which gives enough ime fr planing
and progamming as well scaring out the work tse
‘Early identication and reduction of construction sks and proper
‘management of those that remain, so that constuction safe and
oes nt damage the health of workers or thes
‘&Coeperaton between allinvlved ina project and effective co
codination regarding Health & Safty sues
1m Adequate welfare faces provided from the stat and thoughout
the construction phase
and that
'= Appropriate informations made aval othe right people a the
Fight time, from the start ofthe design process trough
construction use ia place of wor) and maintenance tothe
everual demolition of removal, so that wotk can be cated out
safely and without isk to health
However itis important that the amount of effort devoted to managing
Heath & Safety is kept appropriate to the comple of the project and
level of sks.
HOW LONG WILL YOUR PROJECT TAKE?
Inespecive of sie the COM regulations separates constuction projects
into two types - dependent on how long they take to bull and how many
people ae invoied,
The two types are:
‘= Worotfble Projets — whee the poet ikl to inv LESS
THAN 30 days 50 peson das of constuction wer, o
1m Notable projects - where the projects likely to inolve MORE
TAN 30 days or 500 person days of constuction work.
Ifyou ae in doubt, you should assume thatthe project is Notibl, or
seek hep = you can discuss with your designer if you are in discussion with
‘one or The Associaton for Project Safty can provide you with independent
advice
YOUR DUTIES AS A CONSTRUCTION CLIENT:
There ae duties for you that apply to ALL projets and adional duties
‘hat apply to Notifiable Project.
On ALL projects - Non-Notifiable and Notifiable - you will
need to:
1m Appoint or engage people and organisations that are competent
and capable of canyng ou the work they have to do and are
adequately resourced
‘= Ensure that all apprintments are made early enough to enable
‘those appointed to carryout their dts efecivly
1m See that management arrangements ar putin pace and make sure
‘they remain in pace throughout the project, so that construction
‘works can be carted out safely and without ik to health
‘= Allo sufciont time for e2ch stage ofthe projec, including design,
‘reparation for stating on site and he construction ise
1m Provide information tly tobe needed by anyone involved, so that
‘they can comply with ther duties
‘= Co-opeate wih eveyone volved, to make it easier for ther 10
cary out ther duties
‘= Co-ordinate your own work with al thse inoled, to ensure the
health and safety of those carng out construction work and
anyone affected by it
‘= Be satisfied that any workplaces are designed to comply with all
relevant Health & Safety egisltion
‘Give notice to Contracts of the minim time they will be
allowed for planning and preparation between thet appointment
and stating the constuction work
‘Be sted that suitable wellae faites are provided by
Contracts rom te stat and thoughout the construction phase
The Regulations mostly require you to ensue that a numberof things are
done ater than actual do them youselt On Nor-Notiabe Projects you
can ask a Designer or Contractor for assistance or you can appoint
Sareane to help you~ which may be necessary ifthe projets partcly|
‘eompley (Far instance you culd appoint a CDM Co-rdnatr, who is used
to dealing with these sues, even when your projects Non-Noiisbl)
you don't know what todo you shoul seek advice.
(On Notable projets the COM Co-ordinators thereto lp you cary out
those duties and wil advise you throughout the project on what needs to
be done.