API 510 Mock Exam - A
Questions 1 to 35 are OPEN BOOK and simulate the first half of the actual exam.
1. A vessel is to under go a hydrostatic test after a repair. The vessel's stress allowable atthe test
{temperature is 15,000 psi and its stress allowable at its operating temperature is 13,800 psi. The vessel's
MAWP at its operational temperature is 125 psi. What will be the required test pressure atthe top of the
vessel?
203.8 psi
169.6 psi
176.6 psi
143.7 psi
2. A cylindrical shell contains a welded long joint that is made using a backing strip that remains in place.
All of the radiography requirements of UW 12 (a) have been met. For purposes of calculating
circumferential stress on the cylinder, what willbe the value of the joint E used in the calculation?
1. 10
2. 85
3. 80
4 90
3. A small exchanger has experienced internal corrosion of its tubes. The tubes are required to withstand
an external pressure of 350 psi. The tubes have and O, D. of 2.0 inch and are 6 inches in length with a wall
thickness of 025 inch. What would be the approximate Factor A value for this combination of length
diameter and thickness of tube is?
1.0056
2. 00055
3. 087
4. 10
4. An additional 4 inch nozzle was added to a pressure vessel and is similar to the one in Fig UW-16.1(i).
‘The minimum thickness of the nozzle is 377 inch and the shell minimum thickness is .750 inch. What is
* the decimal value of the throat required of two equal leg size fillet welds for this attachment?
1. 238”
2. 263"
3. 250"
4. .750"
5. A cylindrical shell has a seamless hemispherical head on one end and a seamless ellipsoidal head on the
other end. The elliptical head is attached by a type 2 weld meeting the spot radiography requirements of |
UW-11(a)(5)(b). The shell has a single longitudinal joint. All category A butt welds are type 1 with full
radiography applied. The vessel will require an MAWP of 50 psi . The material of the shell and head is
SA-515-Gr. 60. The allowable stress at the operating temperature is 15,000 psi. The heads inside diameter
is 10-0". What is the required thickness of the 2 to I ellipsoidal head?
1.250
2 z35)
3. 200
4.1003
08/02 Rev 6 Fast Track Technical - Licensed to ITAC 1API 510 Mock Exam - A
6. You have received the following tension test results for a welding procedure, what isthe ultimate unit
stress for these two specimens?
Specimen Widen Thickness Area Ultimate Total Ultimate Unit
Load Ib Stress
1 750 Ao 308 22,600 2
748 409 306 25,800 2
1 380 «2 = 83,314
2. 1=72,377 —-2=83,296
3. 1=73377 -2=84,314
4. 1=74377 2=83314
7. A pressure vessel has been measured to have a minimum wall thickness of 235 inch after 5 years of
service, The vessel's original wall thickness was 250. Its minimum allowable wall thickness is .195 inch.
How long until the next required inspection per API 510?
1. 10 years
2. S years
3. 6.6 years:
4. 6-1/2 years
Answer the following questions about the WPS and PQR (pages 3 to 6) from Captain Bob's Welding,
Consider both the WPS and its supporting PQR when answering the questions.
8, (WPS) In the JOINTS (QW-402) section, the following statement is true;
“There must be a sketch of the joint configuration tobe used in production.
‘Any groove desiga i allowed in production.
‘The box is properly addressed and contains no mistakes,
‘Flux dam retaining is permitted,
aeee
9. (WPS) In the BASE METAL (QW-403) there is a mistake because the;
Pipe diameter is not addressed.
Group number is not addressed and itis a supplemental essential variable.
Fillet welds are addressed as ALL.
‘There is no mistake; none of the above is true, 1 &3 are for information only, number 2 is not
needed for this procedure because no impact tests are required of the weldment.
10. (WPS) In the TECHNIQUE (QW-410) should have addressed the following;
‘Travel speed.
‘Method of back gouging.
Nothing, it is perfect.
‘The length of groove.
2 08/02 Rev 6 Fast Track Technical ~ Licensed to ITACAPI 510 Mock Exam - A
‘QW-482 SUGGESTED FORMAT FOR WELDING PROCEDURE SPECIFICATION (WPS}
(See-GW-200.1, Section IX, ASME Boiler and Pressure Vessel Code!
naw Captain Bob's Welding ov PoP Bye
Dae 6525-96 Sspporting POR No.) 372123
eckng (Yee Et
acing Meal Tp
{eles boar bsting and Trainee
_ Retainer if aseded
Barat Montara hast ia 'alloved copper oF
Brownentic Corer Gerante as required.
‘Shemh, Production Onewingt Wald Symbats or Ween Oucion
{Pou tow the gana aranpemant ef the pars 18 be weed Where
splible, root souclng ad the ees of wd roe may be
sweated,
(At the sodon of we Mi, sences eye aached 19 Marea fin
in, wa ingested bend suanoe, 04. fr notch toga rock
‘ra, lr mulls proce procedures ee)
t
"UASE METALS (QW4G2)
Pe Na. 0 Pte 2 ro No.
Sonciendon 74 wd wate.
| Secicaton yee and pc.
She Anant ed Mach, Pro.
| sham, Anata ane Men, Prop.
‘hick Range:
| eee tt room Min 3/8" G9 Max 1-3/4" pag ALL
a
ter.
P cerUen METALS (an-oal
‘Sow. No. SFA) —_ Sad
‘AWSNe, (Cem) —B=2038)
Fe, .
Ane, 2
‘See of Filer Mare
Weld et
‘Tac Rae:
Same an bane metal
eevee (Ci)
ona Inert
over
“ch bene mata tar mata cambinain shouldbe ecard adh
08/02 Rev 6 Fast Track Technical ~ Licensed to ITAC