Professional Documents
Culture Documents
Cost Estimate
Cost Estimate
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.00
price (Price), and the amount
n loan (Draw). For "Lump
the Lump Sum quote in the
at will be paid for each item
990-2012
tals, PageHome Building
Totals, and Answers
Cost Estimate
Description Qty Price UM Draw
401 HARDWARE
402 • Entry Lockset 0.00
403 • Bedroom Locksets 0.00
404 • Bathroom Locksets 0.00
405 • Passage Doorsets 0.00
406 • Dummy Locksets 0.00
407 • Deadbolts 0.00
408 • Window Locks And Sash Lifts 0.00
409 • Door Stops (Base Board) 0.00
410 • Door Stops (Hinge Type) 0.00
411 • Bath Accessories 0.00
412 • Towel Holders 0.00
413 • Soap Dish 0.00
414 • Toothbrush Holder 0.00
415 • Tumbler Holder 0.00
416 • Medicine Cabinet 0.00
417 • Shower Curtain Rod 0.00
418 • Glass Fireplace Door 0.00
419 • Hardware Labor 0.00
420 0.00
421 TOTAL HARDWARE (LINES 402-419) 0.00
422
423 CABINETS AND VANITIES
424 • Wall Cabinets, Base Cabinets, and Vanities 0.00
425 Including Installation 0.00
426 • "Cultured" Marble Vanity Tops 0.00
427 0.00
428 TOTAL CABINETS AND VANITIES (PAGES 424-426) 0.00
429
430 PAINTING (Mtls and Labor) 0.00
431
432 WALLPAPER
433 • Wallpaper 0.00
434 • Labor Including Sizing And Paste 0.00
435 0.00
436 TOTAL WALLPAPER (LINES 433, 434) 0.00
437
438 WROUGHT IRON (Mtls and Labor) 0.00
439
440 GLASS
441 • Mirror 0.00
442 • Tub Enclosure 0.00
443 • Shower Enclosure 0.00
444 • Installation Of Glass Products 0.00
445 0.00
446 TOTAL GLASS (LINES 441-444) 0.00
447
Note:
448
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
449 PAGE TOTAL (LINES 421, 428, 430, 436, 438, 446) 0.00
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
450
Price Column. Excel will do all of the other calculations including what will be paid for each item
from
UM = your construction
Unit Measure (ea, sqloan ©Totals,
draw, the total for each item, Section
ft, etc.) 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
price (Price), and the amount
n loan (Draw). For "Lump
0.00 0.00
the Lump Sum quote in the
at will be paid for each item
990-2012
tals, PageHome Building
Totals, and Answers
Cost Estimate
Description Qty Price UM Draw
451 CERAMIC TILE - Materials and Labor
452
453 FLOORS AND FLOOR COVERINGS
454 • Carpet Including Pads and Installation 0.00
455 • Vinyl Tile Including Installation 0.00
456 • Wood Floors Including Installation 0.00
457 0.00
458 TOTAL FLOOR COVERING (LINES 454-456) 0.00
459
460 SCREEN PORCH
461 • Framing And Ceiling Materials 0.00
462 • Screening 0.00
463 • Screen Mould 0.00
464 • Screen Door 0.00
465 • Screen Door Hardware 0.00
466 • Labor 0.00
467 0.00
468 TOTAL SCREEN PORCH (LINES 461-466) 0.00
469
470 DECK
471 • Concrete (Footings) 0.00
472 • Framing Materials 0.00
473 • Decking 0.00
474 • Handrail Materials 0.00
475 • Nails 0.00
476 • Labor 0.00
477 0.00
478 TOTAL DECK (LINES 471-476) 0.00
479
480 WALKS, DRIVES, AND PATIOS
481 • Form Materials and Stakes 0.00
482 • Wire Mesh 0.00
483 • Joint Materials 0.00
484 • Concrete 0.00
485 • Labor 0.00
486 • River Rock Or Other Special Finishes - Materials 0.00
487 and Subcontract 0.00
488 0.00
489 TOTAL WALKS, DRIVES, PATIOS (LINES 481-487) 0.00
490
491
492
493
494 PAGE TOTAL (LINES 451, 458, 468, 478, 489) 0.00
495
496
497
Note:
498
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
499
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
500 Column. Excel will do all of the other calculations including what will be paid for each item
Price
from
UM = your construction
Unit Measure (ea, sqloan ©Totals,
draw, the total for each item, Section
ft, etc.) 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.
0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.00
price (Price), and the amount
n loan (Draw). For "Lump
the Lump Sum quote in the
at will be paid for each item
990-2012
tals, PageHome Building
Totals, and Answers
Cost Estimate
Description Qty Price UM Draw
501 LANDSCAPING
502 • Subcontract - Includes: Finish Grading, 0.00
503 Seeding, Sodding, Shrubs, Ground 0.00
504 Covers, and Trees. 0.00
505 • Other Landscape Construction (Retaining Walls, 0.00
506 Steps, Etc.) Including Materials and Labor 0.00
507 0.00
508 TOTAL LANDSCAPING (502-506) 0.00
509
510 GUTTERS AND DOWNSPOUTS 0.00
511
512 CLEANING
513 • Site Clean Up - Haul Trash 0.00
514 • Clean Out House During Construction 0.00
515 • Final House Cleaning Incl. Windows 0.00
516 • Cleaning Brick and Concrete Surfaces 0.00
517 0.00
518 TOTAL CLEANING (LINES 513-516) 0.00
519
520 EQUIPMENT RENTAL 0.00
521
522 INSPECTIONS 0.00
523
524 SUPERINTENDING 0.00
525
526 CONTINGENCY 0.00
527
528
529 PAGE TOTALS (LINES 508, 510, 518, 520, 522, 524, 526) 0.00
530
531
532
533
534
535 GRAND TOTALS (FROM PAGE TOTALS) #REF!
536
537
538
539
540
541
542
543
544
545
546
547
Note:
548
For each item on your estimate enter a quantity (Qty), a unit price (Price), and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
549
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
550 Column. Excel will do all of the other calculations including what will be paid for each item
Price
from
UM = your construction
Unit Measure (ea, sqloan ©Totals,
draw, the total for each item, Section
ft, etc.) 1990-2012
PageHome Building
Totals, and Answers
Summary Page Totals.
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00 0.00
#REF! #REF!
price (Price), and the amount
n loan (Draw). For "Lump
the Lump Sum quote in the
at will be paid for each item
990-2012
tals, PageHome Building
Totals, and Answers
Cost Estimate
Description Draw Me
1 LAND Line 9 0.00 0.00
2 DESIGN Line 16 0.00 0.00
3 CONSTRUCTION LOAN Line 26 0.00 0.00
4 PERMITS Line 37 0.00 0.00
5 UTILITIES Line 45 0.00 0.00
6 SITE PREPARATION Line 57 0.00 0.00
7 FOOTINGS Line 64 0.00 0.00
8 FOUNDATIONS Line 79 0.00 0.00
9 SLAB Line 114 0.00 0.00
10 SOIL TREATMENT Line 116 0.00
11 FRAMING Line 176 0.00 0.00
12 MASONRY WALLS Line 189 0.00 0.00
13 ROOFING Line 210 0.00 0.00
14 WINDOWS Line 213 0.00
15 EXTERIOR DOORS Line 219 0.00 0.00
16 CORNICE, VENEER, & EXTERIOR TRIM Line 264 0.00 0.00
17 FIREPLACE Line 281 0.00 0.00
18 ELECTRICAL Line 292 0.00 0.00
19 APPLIANCES AND SPECIAL EQUIPMENT Line 317 0.00 0.00
20 HVAC SYSTEM Line 326 0.00 0.00
21 PLUMBING Line 336 0.00 0.00
22 WELL Line 338 0.00
23 SEPTIC TANK Line 340 0.00
24 SOLAR SYSTEM Line 342 0.00
25 INSULATION Line 351 0.00
26 DRYWALL Line 353 0.00
27 INTERIOR DOORS AND TRIM Line 393 0.00 0.00
28 HARDWARE Line 421 0.00 0.00
29 CABINETS AND VANITIES Line 428 0.00 0.00
30 PAINTING Line 430 0.00
31 WALLPAPER Line 436 0.00 0.00
32 WROUGHT IRON Line 438 0.00
33 GLASS Line 446 0.00 0.00
34 CERAMIC TILE Line 451
35 FLOORS AND FLOOR COVERINGS Line 458 0.00 0.00
36 SCREEN PORCH Line 468 0.00 0.00
37 DECK Line 478 0.00 0.00
38 WALKS, DRIVES, AND PATIOS Line 489 0.00 0.00
39 LANDSCAPING Line 508 0.00 0.00
40 GUTTERS AND DOWNSPOUTS Line 510 0.00
41 CLEANING Line 518 0.00 0.00
42 EQUIPMENT RENTAL Line 520 0.00
43 INSPECTIONS Line 522 0.00
44 SUPERINTEND Line 524 0.00
45 CONTINGENCY Line 526 0.00
46
47 GRAND TOTAL 0.00 0.00
48
49
50
UM = Unit Measure © 1990-2012 Home Building Answers
Summary
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00