RELACIÓN DE ESTIMACIONES

ESTIMACIÓN 22-45
ZONA DE PRODUCCIÓN

CONTRATISTA / PROVEEDOR EST 22 EST 23 EST 24 EST 25 EST 26 EST 27


10/6/2017 10/13/2017 10/20/2017 10/27/2017 11/3/2017 11/10/2017
MANO DE OBRA $161,850 $166,741 $121,736 $119,597 $124,176 $122,908
PINTURA $55,000 $30,000 $28,000 $26,000 $30,000 $30,000
INSTALACIÓN HIDRAULICA $13,000 $14,500 $8,500 $8,500 $8,500 $13,500
MAQUINARIA $25,900 $8,400 $7,000
HORAS UNIDAD X DIA $15,236 $4,712 $4,400 $6,350 $5,800
MATERIALES VARIOS $7,372
MAQUINARIA $16,050 $14,000 $14,000 $14,000 $14,000
MATERIALES VARIOS $4,178 $1,890 $685 $1,029
HORAS UNIDAD X DIA $19,931 $35,450
MADERERIA $14,100
HORAS UNIDAD X DIA $44,150 $24,037 $11,960 $23,780 $27,100
SERVICIO, BAÑOS $9,000 $9,000
MATERIALES VARIOS $7,590 $2,601 $754 $3,138
MATERIALES VARIOS $5,575 $11,375 $1,875 $17,980
MATERIALES VARIOS $12,705
TRAMITES SEGURO SOCIAL $38,943
MATERIALES VARIOS $3,621
MATERIALES VARIOS $11,419
BOMBAS Y EQUIPOS $14,147
MATERIALES VARIOS $2,550
DETALLES VARIOS
INFRAESTRUCTURA
HERRERIA
ESTRUCTURA METALICA
MANO DE OBRA
MATERIALES VARIOS
SUMNISTRO DE MATERIAL
CANCELERIA
SEGURO SOCIAL
MATERIAL ELECTRICO
MIC MAC
MANO DE OBRA
CARPINTERIA
SUMNINISTRO GEOSINTETICOS

$318,517 $315,083 $215,849 $276,256 $211,819 $262,767


ACUMULADO $318,517 $633,600 $849,449 $1,125,705 $1,337,524 $1,600,291
EST 28 EST 29 EST 30 EST 31 EST 32 EST 33 EST 34 EST 35 EST 36
11/17/2017 11/24/2017 11/30/2107 12/8/2017 ### 12/22/2017 12/29/2017 1/5/2018 1/12/2018
$119,645 $125,227 $138,437 $147,623 $145,393 $145,393 $145,393 $145,393 $159,159
$40,000 $30,000 $32,000 $32,000 $35,000 $35,000 $35,000 $35,000 $35,000
$13,500 $13,500 $13,500 $13,500 $14,500 $14,500 $14,500 $14,500 $14,500
$2,800 $2,800 $12,400 $4,800 $17,450
$5,800 $5,800 $5,100 $2,900 $4,356

$25,200 $31,100 $21,250 $15,450 $11,200 $35,350

$12,200
$18,520 $4,875
$21,360 $9,080 $5,750 $22,400 $5,800
$9,000 $9,000
$4,711 $3,320 $572 $956 $861 $626 $35,213
$13,125 $2,000 $8,380 $7,620 $55,492
$4,580
$69,161 $14,500 $14,500

$73,465
$16,411
$2,400
$10,000 $18,000 $20,945 $9,473 $9,473
$14,723
$20,000 $20,000
$39,474
$44,356
$9,290

$322,477 $191,127 $254,409 $272,702 $422,079 $271,012 $218,866 $194,893 $424,966


$1,922,768 $2,113,895 $2,368,304 $2,641,006 $3,063,085 $3,334,097 $3,552,963 $3,747,856 $4,172,822
EST 37 EST 38 EST 39 EST 40 EST 41 EST 42 EST 43 EST 44 EST 45
1/19/2018 1/26/2018 1/31/2018 2/9/2018 2/16/2018 3/1/2018 3/10/2018 3/14/2018 3/22/2018
$94,992 $83,870 $238,764 $100,031 $89,143 $112,671 $144,357 $136,089
$35,000 $63,666 $39,549 $32,500 $39,103 $50,248
$8,500 $23,000 $6,500 $6,451 $7,945 $6,000
$14,400 $5,600 $14,000 $8,400
$18,487 $6,706 $4,540 $7,280 $3,806
$1,480
$42,000 $25,200 $9,156 $32,350
$1,745 $13,246 $5,312

$65,275 $49,000 $13,800


$29,456 $28,351 $16,600 $2,500
$9,000 $9,000
$18,469 $4,263 $8,146 $10,981
$34,500 $13,767 $15,000 $15,154
$10,100 $8,814
$14,500 $14,500 $14,500

$91,337 $13,150

$9,473
$20,000 $35,000 $51,000 $35,000
$8,200 $48,398

$55,192 $12,312
$85,260 $21,560 $36,060
$110,422 $42,198 $71,973
$3,097 $4,407
$23,749
$21,500 $90,051 $68,831
$22,500
$18,748

$110,422 $94,992 $139,062 $316,764 $579,660 $296,532 $468,164 $497,141 $434,444


$4,283,244 $4,378,236 $4,517,298 $4,834,062 $5,413,722 $5,710,254 $6,178,418 $6,675,559 $7,110,003
NÚMEROS GENERADORES - CASA ROBLESG
[ CASA ROBLESGIL ]

RESUMEN GENERAL DE CUARTO DE LAV

DESCRIPCIÓN ACERO #3 ACERO #4

CUARTO DE LAVADO 0.61 0.94

CUARTO DE MAQUINAS

ALBERCA / JACUZZI

NOTA:
NÚMEROS GENERADORES - CASA ROBLESG
[ CASA ROBLESGIL ]

C I M E N T A C I Ó N / C U A R

ACERO

ACERO#3 ACERO#4
EJE TRAMO DESCRIPCIÓN
0.557 0.996

HORIZONTAL

LOSA INFERIOR VAR. LONGITUDINALES 0.996


LOSA INFERIOR VAR. TRANSVERSALES 0.996
HORIZONTALES 0.557
A1 O2 O4
VERTICALES 0.557
HORIZONTALES 0.557
A1 O2 O4
VERTICALES 0.557
HORIZONTALES 0.557
O2 O4
VERTICALES 0.557

VERTICALES

HORIZONTALES 0.557
O2 A1 C
VERTICALES 0.557
HORIZONTALES 0.557
O2 A1 C
VERTICALES 0.557
LOSA SUPERIOR VAR. LONGITUDINALES 0.996
LOSA SUPERIOR VAR. TRANSVERSALES 0.996

SUBTOTAL 0.57 0.87


DESPERDICIO 8% 0.05 0.07
TOTAL 0.61 0.94
C I M B R A

CIMBRA

EJE TRAMO DESCRIPCIÓN CARA 1 CARA 2

HORIZONTAL

A1 O2 O4 MUROS 2

A1 O2 O4 MUROS 2

O2 O4 MUROS 2

VERTICALES

O2 A1 C MUROS 2

O2 A1 C MUROS 2
LOSA SUPERIOR 1
LADOS 1

SUBTOTAL 122.63 M2
DESPERDICIO 5% 6.13 M2
TOTAL 128.76 M2

C O N C R E T

CONCRETO

EJE TRAMO DESCRIPCIÓN

HORIZONTAL

LOSA INFERIOR

A1 O2 O4 MUROS

A1 O2 O4 MUROS

O2 O4 MUROS
VERTICALES

O2 A1 C MUROS

O2 A1 C MUROS

LOSA SUPERIOR

SUBTOTAL 16.90 M3
DESPERDICIO 5% 0.84 M3
TOTAL 17.74 M3
C I M E N T A C I Ó N / C U A R T O

ACERO

ACERO#3 ACERO#4
EJE TRAMO DESCRIPCIÓN
0.557 0.996

HORIZONTAL

LOSA INFERIOR VAR. LONGITUDINALES 0.996


LOSA INFERIOR VAR. TRANSVERSALES 0.996
HORIZONTALES 0.557
a O8
VERTICALES 0.557
HORIZONTALES 0.557
VERTICALES 0.557

VERTICALES

HORIZONTALES 0.557
O8 a C VERTICALES 0.557
PAQUETE 4 VAR. 0.557
HORIZONTALES 0.557
a
VERTICALES 0.557
LOSA SUPERIOR VAR. LONGITUDINALES 0.996
LOSA SUPERIOR VAR. TRANSVERSALES 0.996

SUBTOTAL 0.42 0.76


DESPERDICIO 8% 0.03 0.06
TOTAL 0.45 0.82

C I M B R A

CIMBRA

EJE TRAMO DESCRIPCIÓN CARA 1 CARA 2

HORIZONTAL

a O8 MUROS 2

MUROS 2
VERTICALES

O8 a C MUROS 2

a MUROS 2
LOSA SUPERIOR 1
LADOS 1

SUBTOTAL 81.69 M2
DESPERDICIO 5% 4.08 M2
TOTAL 85.77 M2

C O N C R E T

CONCRETO

EJE TRAMO DESCRIPCIÓN

HORIZONTAL

LOSA INFERIOR

a O8 O4 MUROS

MUROS

VERTICALES

O8 a C MUROS

a MUROS

LOSA SUPERIOR

SUBTOTAL 9.78 M3
DESPERDICIO 5% 0.49 M3
TOTAL 10.27 M3
SA ROBLESGIL

ARTO DE LAVADO Y CUARTO DE MAQUINAS

CIMBRA CONCRETO
ACERO #5 CEMENTO
M2 M3

128.76 17.74
SA ROBLESGIL

N / C U A R T O D E LAVADO

ACERO
No. De No. De
ACERO#5 No. De
Varillas Grapas PIEZAS ML / LONG TOTAL KG
1.552 Estribos pza
pza pza

HORIZONTALES

20 2 5.50 219.12
28 2 3.90 217.53
13 2 5.50 79.65
28 2 2.70 84.22
13 2 5.50 79.65
18 2 2.70 54.14
13 2 1.20 17.38
6 2 2.70 18.05

VERTICALES

13 2 3.90 56.48
20 2 2.70 60.16
13 2 3.90 56.48
20 2 2.70 60.16
20 2 5.50 219.12
28 2 3.90 217.53

TON
TON
TON
C I M B R A

CIMBRA

CARA 3 CARA 4 ML / LONG ALTURA PIEZAS TOTAL M2

HORIZONTALES

5.10 2.30 23.46

5.50 2.30 25.30

1.70 2.10 7.14

VERTICALES

3.90 2.30 17.94

3.90 2.30 17.94


5.50 3.90 21.45
18.80 0.50 9.40

C O N C R E T O

CONCRETO

ML / LONG ALTO ESPESOR PIEZAS TOTAL M3

HORIZONTALES

5.50 3.90 0.20 4.29

5.50 2.10 0.20 2.31

5.50 2.10 0.20 2.31

1.70 2.10 0.20 0.71


VERTICALES

3.55 2.10 0.20 1.49

3.55 2.10 0.20 1.49

5.50 3.90 0.20 4.29


/ C U A R T O D E M A Q U I N A S

ACERO
No. De No. De
ACERO#5 No. De
Varillas Grapas PIEZAS ML / LONG TOTAL KG
1.552 Estribos pza
pza pza

HORIZONTALES

20 2 4.70 187.25
24 2 4.00 191.23
13 2 2.80 40.55
14 2 2.70 42.11
13 2 2.70 39.10
13 2 2.70 39.10

VERTICALES

13 2 4.70 68.07
24 2 2.70 72.19
4 1 4.70 10.47
13 2 3.70 53.58
18 2 2.70 54.14
20 2 4.70 187.25
24 2 4.00 191.23

TON
TON
TON

C I M B R A

CIMBRA

CARA 3 CARA 4 ML / LONG ALTURA PIEZAS TOTAL M2

HORIZONTALES

2.80 2.30 12.88

2.70 2.30 12.42


VERTICALES

4.70 2.30 21.62

3.70 2.30 17.02


4.00 2.70 10.80
13.90 0.50 6.95

C O N C R E T O

CONCRETO

ML / LONG ALTO ESPESOR PIEZAS TOTAL M3

HORIZONTALES

4.00 2.70 0.20 2.16

2.40 2.10 0.20 1.01

2.20 2.10 0.20 0.92

VERTICALES

4.70 2.10 0.20 1.97

3.70 2.10 0.20 1.55

4.00 2.70 0.20 2.16


NÚMEROS GENERADORES - CASA ROBLESG
[ CASA ROBLESGIL ]

RESUMEN GENERAL DE

DESCRIPCIÓN ACERO #3 ACERO #4

ZAPATA 4.80

CARTELAS 0.96

NOTA: LAS MEDIDAS CONTEMPLPADAS DE ACERO EN MUROS Y CARTELAS SO


NÚMEROS GENERADORES - CASA ROBLESG
[ CASA ROBLESGIL ]

C I M E N T A C I

ACERO

ACERO#3 ACERO#4
EJE TRAMO DESCRIPCIÓN
0.557 0.996

VERTICALES

HORIZONTALES 0.557
O2 C C2 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O2 B C VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O2 a A1 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
CL D2 E VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
A1 B VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O3 D1 E VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O3 A1 B VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
3A a A1 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O4 D1 β VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O4 A1 B VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O4 a A1
O4 a A1 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O5 a B VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O6 a B VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557

SUBTOTAL 1.60 TON


DESPERDICIO 8% 0.13 TON
TOTAL 1.73 TON
HORIZONTAL

HORIZONTALES 0.557
F D E VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
β O4 O6 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
a O2 O4 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
a O5 O6 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
A1 O2 O4 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
B O2 O4 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
B _ O6 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
C O2 2A VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
C2 O2 O4 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
D F O2 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
D1 O2 O3 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
D2 CL CL VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
E F O3 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
a O6 8C VERTICALES 0.557
a O6 8C
PAQUETE DE 4 VAR. 0.557

SUBTOTAL 2.85 TON


DESPERDICIO 8% 0.23 TON
TOTAL 3.07 TON
C I M B R A

CIMBRA

EJE TRAMO DESCRIPCIÓN CARA 1 CARA 2

VERTICALES

TAPAS 1
O2 C C2
LADOS LONGITUDINALES 2
TAPAS
O2 B C
LADOS LONGITUDINALES 2
TAPAS 2
O2 a A1
LADOS LONGITUDINALES 2
TAPAS
CL D2 E
LADOS LONGITUDINALES 2
TAPAS
A1 B
LADOS LONGITUDINALES 2
TAPAS
O3 D1 E
LADOS LONGITUDINALES 2
TAPAS 1
O3 A1 B
LADOS LONGITUDINALES 2
TAPAS 2
3A a A1
LADOS LONGITUDINALES 2
TAPAS 2
O4 D1 β
LADOS LONGITUDINALES 2
TAPAS 1
O4 A1 B
LADOS LONGITUDINALES 2
TAPAS 2
O4 a A1
LADOS LONGITUDINALES 2
TAPAS 1
O5 a B
LADOS LONGITUDINALES 2
TAPAS 1
O6 a B
LADOS LONGITUDINALES 2

SUBTOTAL 187.68 M2
DESPERDICIO 5% 9.38 M2
TOTAL 197.06 M2

CIMBRA
EJE TRAMO DESCRIPCIÓN CARA 1 CARA 2

HORIZONTAL

TAPAS 2
F D E
LADOS LONGITUDINALES 2
TAPAS 1
β O4 O6
LADOS LONGITUDINALES 2
TAPAS 1
a O2 O4
LADOS LONGITUDINALES 2
TAPAS 1
a O5 O6
LADOS LONGITUDINALES 2
TAPAS 1
A1 O2 O4
LADOS LONGITUDINALES 2
TAPAS 2
B O2 O4
LADOS LONGITUDINALES 2
TAPAS 1
B _ O6
LADOS LONGITUDINALES 2
TAPAS 1
C O2 2A
LADOS LONGITUDINALES 2
TAPAS 2
C2 O2 O4
LADOS LONGITUDINALES 2
TAPAS 2
D F O2
LADOS LONGITUDINALES 2
TAPAS 1
D1 O2 O3
LADOS LONGITUDINALES 2
TAPAS 1
D2 CL CL
LADOS LONGITUDINALES 2
TAPAS 4
E F O3
LADOS LONGITUDINALES 2
TAPAS 9
a O6 8C
LADOS LONGITUDINALES 2

SUBTOTAL 337.11 M2
DESPERDICIO 5% 16.86 M2
TOTAL 353.97 M2
C O N C R E T

CONCRETO

EJE TRAMO DESCRIPCIÓN

VERTICALES

O2 C C2 MUROS

O2 B C MUROS

O2 a A1 MUROS

CL D2 E MUROS

A1 B MUROS

O3 D1 E MUROS

O3 A1 B MUROS

3A a A1 MUROS

O4 D1 β MUROS

O4 A1 B MUROS

O4 a A1 MUROS

O5 a B MUROS

O6 a B MUROS

SUBTOTAL 14.22 M3
DESPERDICIO 5% 0.71 M3
TOTAL 14.93 M3

CONCRETO

EJE TRAMO DESCRIPCIÓN

HORIZONTAL
F D E MUROS

F D E MUROS

β O4 O6 MUROS

a O2 O4 MUROS

a O5 O6 MUROS

A1 O2 O4 MUROS

B O2 O4 MUROS

B _ O6 MUROS

C O2 2A MUROS

C2 O2 O4 MUROS

D F O2 MUROS

D1 O2 O3 MUROS

D2 CL CL MUROS

E F O3 MUROS

E F O3 MUROS

a O6 8C MUROS

SUBTOTAL 25.59 M3
DESPERDICIO 5% 1.28 M3
TOTAL 26.87 M3
E S T R U C T U R A / C

ACERO

ACERO#3 ACERO#4
EJE TRAMO DESCRIPCIÓN
0.557 0.996

CARTELAS

VERTICALES 1 0.557
VERTICALES 2
ESTRIBOS 0.557
GRAPAS 0.557
VERTICALES 1 0.557
VERTICALES 2
ESTRIBOS 0.557
GRAPAS 0.557
VERTICALES 1 0.557
VERTICALES 2
ESTRIBOS 0.557
GRAPAS 0.557

SUBTOTAL 0.89
DESPERDICIO 8% 0.07
TOTAL 0.96

CIMBRA

EJE TRAMO DESCRIPCIÓN CARA 1 CARA 2

CARTELAS

TAPAS 2
LADOS LONGITUDINALES 2

SUBTOTAL 56.00 M2
DESPERDICIO 5% 2.80 M2
TOTAL 58.80 M2

CONCRETO
EJE TRAMO DESCRIPCIÓN

CARTELAS

CARTELA 1

SUBTOTAL 4.99 M3
DESPERDICIO 5% 0.25 M3
TOTAL 5.24 M3

NOTA: LAS MEDIDAS CONTEMPLPADAS PARA CIMBRA Y CONCRETO CORRESPON

TOTAL ESTRUCTURA (MUROS)

ACERO # 3 4.80 TON


CIMBRA 551.03 M2
CONCRETO 41.80 M3
SA ROBLESGIL

ENERAL DE CIMENTACIÓN

CIMBRA CONCRETO
ACERO #5 CEMENTO
M2 M3

551.03 41.80

1.07 58.80 5.24

ROS Y CARTELAS SON DESDE CIMENTACIÓN.


SA ROBLESGIL

I M E N T A C I Ó N

ACERO
No. De No. De
ACERO#5 No. De
Varillas Grapas PIEZAS ML / LONG TOTAL KG
1.552 Estribos pza
pza pza

VERTICALES

14 2 2.10 32.75
9 2 4.80 48.12
4 1 1.80 4.01
14 2 1.90 29.63
8 2 4.80 42.78
4 1 1.60 3.56
14 2 3.80 59.26
18 2 4.80 96.25
4 1 3.50 7.80
14 2 2.50 38.99
11 2 4.80 58.82
4 1 2.20 4.90
14 2 2.50 38.99
11 2 3.30 40.44
4 1 2.20 4.90
14 2 3.50 54.59
16 2 4.80 85.56
4 1 3.20 7.13
14 2 2.65 41.33
12 2 3.30 44.11
4 1 2.35 5.24
14 2 2.65 41.33
12 2 4.80 64.17
4 1 2.35 5.24
14 2 6.65 103.71
32 2 4.80 171.11
4 1 6.35 14.15
14 2 1.85 28.85
8 2 3.30 29.41
4 1 1.55 3.45
14 2 2.70 42.11
12 2 4.80 64.17
4 1 2.40 5.35
14 2 3.30 51.47
15 2 4.80 80.21
4 1 3.00 6.68
14 2 3.30 51.47
15 2 4.80 80.21
4 1 3.00 6.68
HORIZONTALES

14 2 4.60 71.74
22 2 4.80 117.64
4 1 4.30 9.58
14 2 6.90 107.61
33 2 4.80 176.46
4 1 6.60 14.70
14 2 4.60 71.74
22 2 4.80 117.64
4 1 4.30 9.58
14 2 1.15 17.94
4 2 4.80 21.39
4 1 0.85 1.89
14 2 4.15 64.72
19 2 3.30 69.85
4 1 3.85 8.58
14 2 3.10 48.35
14 2 3.30 51.47
4 1 2.80 6.24
14 2 1.00 15.60
4 2 4.80 21.39
4 1 0.70 1.56
14 2 1.40 21.83
6 2 3.30 22.06
4 1 1.10 2.45
14 2 4.90 76.42
23 2 4.80 122.99
4 1 4.60 10.25
14 2 5.45 85.00
26 2 4.80 139.03
4 1 5.15 11.47
14 2 2.80 43.67
13 2 4.80 69.51
4 1 2.50 5.57
14 2 1.00 15.60
3 2 4.80 16.04
4 1 0.70 1.56
14 2 5.80 90.46
28 2 4.80 149.72
4 1 5.50 12.25
14 2 21.70 338.43
101 2 4.80 540.07
4 1 20.20 45.01
C I M B R A

CIMBRA

CARA 3 CARA 4 ML / LONG ALTURA PIEZAS TOTAL M2

VERTICALES

0.20 2.55 0.51


1.80 2.55 9.18

1.60 2.55 8.16


0.20 2.55 1.02
3.50 2.55 17.85

2.20 2.55 11.22

2.20 2.55 11.22

3.20 2.55 16.32


0.20 2.55 0.51
2.35 2.55 11.99
0.20 2.55 1.02
2.35 2.55 11.99
0.20 2.55 1.02
6.35 2.55 32.39
0.20 2.55 0.51
1.55 2.55 7.91
0.20 2.55 1.02
2.40 2.55 12.24
0.20 2.55 0.51
3.00 2.55 15.30
0.20 2.55 0.51
3.00 2.55 15.30

CIMBRA
CARA 3 CARA 4 ML / LONG ALTURA PIEZAS TOTAL M2

HORIZONTALES

0.20 2.55 1.02


4.30 2.55 21.93
0.20 2.55 0.51
6.60 2.55 33.66
0.20 2.55 0.51
4.30 2.55 21.93
0.30 2.55 0.77
0.85 2.55 4.34
0.20 2.55 0.51
3.85 2.55 19.64
0.20 2.55 1.02
2.80 2.55 14.28
0.20 2.55 0.51
0.70 2.55 3.57
0.20 2.55 0.51
1.10 2.55 5.61
0.20 2.55 1.02
4.60 2.55 23.46
0.20 2.55 1.02
5.15 2.55 26.27
0.20 2.55 0.51
2.50 2.55 12.75
0.20 2.55 0.51
0.70 2.55 3.57
0.20 2.55 2.04
5.50 2.55 28.05
0.20 2.55 4.59
20.20 2.55 103.02
C O N C R E T O

CONCRETO

ML / LONG ALTO ESPESOR PIEZAS TOTAL M3

VERTICALES

1.80 2.55 0.15 0.69

1.60 2.55 0.15 0.61

3.50 2.55 0.20 1.79

2.20 2.55 0.15 0.84

2.20 2.55 0.15 0.84

3.20 2.55 0.15 1.22

2.35 2.55 0.15 0.90

2.00 2.55 0.15 0.77

6.20 2.55 0.20 3.16

1.50 2.55 0.15 0.57

2.00 2.55 0.15 0.77

2.70 2.55 0.15 1.03

2.70 2.55 0.15 1.03

CONCRETO

ML / LONG ALTO ESPESOR PIEZAS TOTAL M3

HORIZONTALES
2.20 2.55 0.15 0.84

2.20 2.55 0.20 1.12

6.50 2.55 0.15 2.49

4.30 2.55 0.15 1.64

0.90 2.55 0.30 0.69

3.70 2.55 0.15 1.42

2.80 2.55 0.15 1.07

0.60 2.55 0.15 0.23

1.00 2.55 0.15 0.38

4.60 2.55 0.2 2.35

5.10 2.55 0.15 1.95

2.50 2.55 0.15 0.96

0.70 2.55 0.15 0.27

3.40 2.55 0.20 1.73

1.90 2.55 0.15 0.73

20.20 2.55 0.15 7.73


C T U R A / C A R T E L A S

ACERO
No. De No. De
ACERO#5 No. De
Varillas Grapas PIEZAS ML / LONG TOTAL KG
1.552 Estribos pza
pza pza

CARTELAS

8 7 4.80 149.72
1.552 12 7 5.20 677.91
28 6 3.60 336.87
28 28 0.20 87.34
8 2 4.80 42.78
1.552 12 2 5.60 208.59
34 2 3.60 136.35
34 8 0.20 30.30
8 1 4.90 21.83
1.552 12 1 5.60 104.29
33 1 3.60 66.17
33 4 0.20 14.70

0.99 TON
0.08 TON
1.07 TON

CIMBRA

CARA 3 CARA 4 ML / LONG ALTURA PIEZAS TOTAL M2

CARTELAS

0.20 2.55 6.00 6.12


1.63 2.55 6.00 49.88

CONCRETO
ML / LONG ALTO ESPESOR PIEZAS TOTAL M3

CARTELAS

1.63 2.55 0.20 6.00 4.99

ONCRETO CORRESPONDE A LA ETAPA DE ESTRUCTURAS, 2.70 CM EN GENERAL.


NÚMEROS GENERADORES - CASA ROBLESG
[ CASA ROBLESGIL ]

RESUMEN GENERAL DE

DESCRIPCIÓN ACERO #3 ACERO #4

MUROS DE CONCRETO 4.80

CARTELAS 0.96

NOTA: LAS MEDIDAS CONTEMPLPADAS DE ACERO EN MUROS Y CARTELAS SO


NÚMEROS GENERADORES - CASA ROBLESG
[ CASA ROBLESGIL ]

E S T R U C T U R A /

ACERO

ACERO#3 ACERO#4
EJE TRAMO DESCRIPCIÓN
0.557 0.996

VERTICALES

HORIZONTALES 0.557
O2 C C2 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O2 B C VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O2 a A1 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
CL D2 E VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
A1 B VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O3 D1 E VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O3 A1 B VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
3A a A1 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O4 D1 β VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O4 A1 B VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O4 a A1
O4 a A1 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O5 a B VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
O6 a B VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557

SUBTOTAL 1.60 TON


DESPERDICIO 8% 0.13 TON
TOTAL 1.73 TON
HORIZONTAL

HORIZONTALES 0.557
F D E VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
β O4 O6 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
a O2 O4 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
a O5 O6 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
A1 O2 O4 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
B O2 O4 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
B _ O6 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
C O2 2A VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
C2 O2 O4 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
D F O2 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
D1 O2 O3 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
D2 CL CL VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
E F O3 VERTICALES 0.557
PAQUETE DE 4 VAR. 0.557
HORIZONTALES 0.557
a O6 8C VERTICALES 0.557
a O6 8C
PAQUETE DE 4 VAR. 0.557

SUBTOTAL 2.85 TON


DESPERDICIO 8% 0.23 TON
TOTAL 3.07 TON
C I M B R A

CIMBRA

EJE TRAMO DESCRIPCIÓN CARA 1 CARA 2

VERTICALES

TAPAS 1
O2 C C2
LADOS LONGITUDINALES 2
TAPAS
O2 B C
LADOS LONGITUDINALES 2
TAPAS 2
O2 a A1
LADOS LONGITUDINALES 2
TAPAS
CL D2 E
LADOS LONGITUDINALES 2
TAPAS
A1 B
LADOS LONGITUDINALES 2
TAPAS
O3 D1 E
LADOS LONGITUDINALES 2
TAPAS 1
O3 A1 B
LADOS LONGITUDINALES 2
TAPAS 2
3A a A1
LADOS LONGITUDINALES 2
TAPAS 2
O4 D1 β
LADOS LONGITUDINALES 2
TAPAS 1
O4 A1 B
LADOS LONGITUDINALES 2
TAPAS 2
O4 a A1
LADOS LONGITUDINALES 2
TAPAS 1
O5 a B
LADOS LONGITUDINALES 2
TAPAS 1
O6 a B
LADOS LONGITUDINALES 2

SUBTOTAL 187.68 M2
DESPERDICIO 5% 9.38 M2
TOTAL 197.06 M2

CIMBRA
EJE TRAMO DESCRIPCIÓN CARA 1 CARA 2

HORIZONTAL

TAPAS 2
F D E
LADOS LONGITUDINALES 2
TAPAS 1
β O4 O6
LADOS LONGITUDINALES 2
TAPAS 1
a O2 O4
LADOS LONGITUDINALES 2
TAPAS 1
a O5 O6
LADOS LONGITUDINALES 2
TAPAS 1
A1 O2 O4
LADOS LONGITUDINALES 2
TAPAS 2
B O2 O4
LADOS LONGITUDINALES 2
TAPAS 1
B _ O6
LADOS LONGITUDINALES 2
TAPAS 1
C O2 2A
LADOS LONGITUDINALES 2
TAPAS 2
C2 O2 O4
LADOS LONGITUDINALES 2
TAPAS 2
D F O2
LADOS LONGITUDINALES 2
TAPAS 1
D1 O2 O3
LADOS LONGITUDINALES 2
TAPAS 1
D2 CL CL
LADOS LONGITUDINALES 2
TAPAS 4
E F O3
LADOS LONGITUDINALES 2
TAPAS 9
a O6 8C
LADOS LONGITUDINALES 2

SUBTOTAL 337.11 M2
DESPERDICIO 5% 16.86 M2
TOTAL 353.97 M2
C O N C R E T

CONCRETO

EJE TRAMO DESCRIPCIÓN

VERTICALES

O2 C C2 MUROS

O2 B C MUROS

O2 a A1 MUROS

CL D2 E MUROS

A1 B MUROS

O3 D1 E MUROS

O3 A1 B MUROS

3A a A1 MUROS

O4 D1 β MUROS

O4 A1 B MUROS

O4 a A1 MUROS

O5 a B MUROS

O6 a B MUROS

SUBTOTAL 14.22 M3
DESPERDICIO 5% 0.71 M3
TOTAL 14.93 M3

CONCRETO

EJE TRAMO DESCRIPCIÓN

HORIZONTAL
F D E MUROS

F D E MUROS

β O4 O6 MUROS

a O2 O4 MUROS

a O5 O6 MUROS

A1 O2 O4 MUROS

B O2 O4 MUROS

B _ O6 MUROS

C O2 2A MUROS

C2 O2 O4 MUROS

D F O2 MUROS

D1 O2 O3 MUROS

D2 CL CL MUROS

E F O3 MUROS

E F O3 MUROS

a O6 8C MUROS

SUBTOTAL 25.59 M3
DESPERDICIO 5% 1.28 M3
TOTAL 26.87 M3
E S T R U C T U R A / C

ACERO

ACERO#3 ACERO#4
EJE TRAMO DESCRIPCIÓN
0.557 0.996

CARTELAS

VERTICALES 1 0.557
VERTICALES 2
ESTRIBOS 0.557
GRAPAS 0.557
VERTICALES 1 0.557
VERTICALES 2
ESTRIBOS 0.557
GRAPAS 0.557
VERTICALES 1 0.557
VERTICALES 2
ESTRIBOS 0.557
GRAPAS 0.557

SUBTOTAL 0.89
DESPERDICIO 8% 0.07
TOTAL 0.96

CIMBRA

EJE TRAMO DESCRIPCIÓN CARA 1 CARA 2

CARTELAS

TAPAS 2
LADOS LONGITUDINALES 2

SUBTOTAL 56.00 M2
DESPERDICIO 5% 2.80 M2
TOTAL 58.80 M2

CONCRETO
EJE TRAMO DESCRIPCIÓN

CARTELAS

CARTELA 1

SUBTOTAL 4.99 M3
DESPERDICIO 5% 0.25 M3
TOTAL 5.24 M3

NOTA: LAS MEDIDAS CONTEMPLPADAS PARA CIMBRA Y CONCRETO CORRESPON

TOTAL ESTRUCTURA (MUROS)

ACERO # 3 4.80 TON


CIMBRA 551.03 M2
CONCRETO 41.80 M3
SA ROBLESGIL

ENERAL DE ESTRUCTURA

CIMBRA CONCRETO
ACERO #5 CEMENTO
M2 M3

551.03 41.80

1.07 58.80 5.24

ROS Y CARTELAS SON DESDE CIMENTACIÓN.


SA ROBLESGIL

U C T U R A / M U R O S

ACERO
No. De No. De
ACERO#5 No. De
Varillas Grapas PIEZAS ML / LONG TOTAL KG
1.552 Estribos pza
pza pza

VERTICALES

14 2 2.10 32.75
9 2 4.80 48.12
4 1 1.80 4.01
14 2 1.90 29.63
8 2 4.80 42.78
4 1 1.60 3.56
14 2 3.80 59.26
18 2 4.80 96.25
4 1 3.50 7.80
14 2 2.50 38.99
11 2 4.80 58.82
4 1 2.20 4.90
14 2 2.50 38.99
11 2 3.30 40.44
4 1 2.20 4.90
14 2 3.50 54.59
16 2 4.80 85.56
4 1 3.20 7.13
14 2 2.65 41.33
12 2 3.30 44.11
4 1 2.35 5.24
14 2 2.65 41.33
12 2 4.80 64.17
4 1 2.35 5.24
14 2 6.65 103.71
32 2 4.80 171.11
4 1 6.35 14.15
14 2 1.85 28.85
8 2 3.30 29.41
4 1 1.55 3.45
14 2 2.70 42.11
12 2 4.80 64.17
4 1 2.40 5.35
14 2 3.30 51.47
15 2 4.80 80.21
4 1 3.00 6.68
14 2 3.30 51.47
15 2 4.80 80.21
4 1 3.00 6.68
HORIZONTALES

14 2 4.60 71.74
22 2 4.80 117.64
4 1 4.30 9.58
14 2 6.90 107.61
33 2 4.80 176.46
4 1 6.60 14.70
14 2 4.60 71.74
22 2 4.80 117.64
4 1 4.30 9.58
14 2 1.15 17.94
4 2 4.80 21.39
4 1 0.85 1.89
14 2 4.15 64.72
19 2 3.30 69.85
4 1 3.85 8.58
14 2 3.10 48.35
14 2 3.30 51.47
4 1 2.80 6.24
14 2 1.00 15.60
4 2 4.80 21.39
4 1 0.70 1.56
14 2 1.40 21.83
6 2 3.30 22.06
4 1 1.10 2.45
14 2 4.90 76.42
23 2 4.80 122.99
4 1 4.60 10.25
14 2 5.45 85.00
26 2 4.80 139.03
4 1 5.15 11.47
14 2 2.80 43.67
13 2 4.80 69.51
4 1 2.50 5.57
14 2 1.00 15.60
3 2 4.80 16.04
4 1 0.70 1.56
14 2 5.80 90.46
28 2 4.80 149.72
4 1 5.50 12.25
14 2 21.70 338.43
101 2 4.80 540.07
4 1 20.20 45.01
C I M B R A

CIMBRA

CARA 3 CARA 4 ML / LONG ALTURA PIEZAS TOTAL M2

VERTICALES

0.20 2.55 0.51


1.80 2.55 9.18

1.60 2.55 8.16


0.20 2.55 1.02
3.50 2.55 17.85

2.20 2.55 11.22

2.20 2.55 11.22

3.20 2.55 16.32


0.20 2.55 0.51
2.35 2.55 11.99
0.20 2.55 1.02
2.35 2.55 11.99
0.20 2.55 1.02
6.35 2.55 32.39
0.20 2.55 0.51
1.55 2.55 7.91
0.20 2.55 1.02
2.40 2.55 12.24
0.20 2.55 0.51
3.00 2.55 15.30
0.20 2.55 0.51
3.00 2.55 15.30

CIMBRA
CARA 3 CARA 4 ML / LONG ALTURA PIEZAS TOTAL M2

HORIZONTALES

0.20 2.55 1.02


4.30 2.55 21.93
0.20 2.55 0.51
6.60 2.55 33.66
0.20 2.55 0.51
4.30 2.55 21.93
0.30 2.55 0.77
0.85 2.55 4.34
0.20 2.55 0.51
3.85 2.55 19.64
0.20 2.55 1.02
2.80 2.55 14.28
0.20 2.55 0.51
0.70 2.55 3.57
0.20 2.55 0.51
1.10 2.55 5.61
0.20 2.55 1.02
4.60 2.55 23.46
0.20 2.55 1.02
5.15 2.55 26.27
0.20 2.55 0.51
2.50 2.55 12.75
0.20 2.55 0.51
0.70 2.55 3.57
0.20 2.55 2.04
5.50 2.55 28.05
0.20 2.55 4.59
20.20 2.55 103.02
C O N C R E T O

CONCRETO

ML / LONG ALTO ESPESOR PIEZAS TOTAL M3

VERTICALES

1.80 2.55 0.15 0.69

1.60 2.55 0.15 0.61

3.50 2.55 0.20 1.79

2.20 2.55 0.15 0.84

2.20 2.55 0.15 0.84

3.20 2.55 0.15 1.22

2.35 2.55 0.15 0.90

2.00 2.55 0.15 0.77

6.20 2.55 0.20 3.16

1.50 2.55 0.15 0.57

2.00 2.55 0.15 0.77

2.70 2.55 0.15 1.03

2.70 2.55 0.15 1.03

CONCRETO

ML / LONG ALTO ESPESOR PIEZAS TOTAL M3

HORIZONTALES
2.20 2.55 0.15 0.84

2.20 2.55 0.20 1.12

6.50 2.55 0.15 2.49

4.30 2.55 0.15 1.64

0.90 2.55 0.30 0.69

3.70 2.55 0.15 1.42

2.80 2.55 0.15 1.07

0.60 2.55 0.15 0.23

1.00 2.55 0.15 0.38

4.60 2.55 0.2 2.35

5.10 2.55 0.15 1.95

2.50 2.55 0.15 0.96

0.70 2.55 0.15 0.27

3.40 2.55 0.20 1.73

1.90 2.55 0.15 0.73

20.20 2.55 0.15 7.73


C T U R A / C A R T E L A S

ACERO
No. De No. De
ACERO#5 No. De
Varillas Grapas PIEZAS ML / LONG TOTAL KG
1.552 Estribos pza
pza pza

CARTELAS

8 7 4.80 149.72
1.552 12 7 5.20 677.91
28 6 3.60 336.87
28 28 0.20 87.34
8 2 4.80 42.78
1.552 12 2 5.60 208.59
34 2 3.60 136.35
34 8 0.20 30.30
8 1 4.90 21.83
1.552 12 1 5.60 104.29
33 1 3.60 66.17
33 4 0.20 14.70

0.99 TON
0.08 TON
1.07 TON

CIMBRA

CARA 3 CARA 4 ML / LONG ALTURA PIEZAS TOTAL M2

CARTELAS

0.20 2.55 6.00 6.12


1.63 2.55 6.00 49.88

CONCRETO
ML / LONG ALTO ESPESOR PIEZAS TOTAL M3

CARTELAS

1.63 2.55 0.20 6.00 4.99

ONCRETO CORRESPONDE A LA ETAPA DE ESTRUCTURAS, 2.70 CM EN GENERAL.


NÚMEROS GENERADORES - CASA ROBLESGIL
[ CASA ROBLESGIL ]

RESUMEN GENERAL DE ACABAD

M U R O S

M01
Muro de concreto armado S.D.E., acabado aparente, cimbrado con tableros horizo
impermeabilizante integral y sellador mate S.M.A. Ver planos de Despieces
M02 Muro de tabique Tabimax de 15 cm con aplanado de mortero fino de 1.5cm por la
manos de pintura vinílica color S.M.A.

M03 Bastidor de 5 cm de ancho con recubrimiento de madera de 2cm por lado, acaba

M04 Cancelería de aluminio acabado y color S.M.A. con cristal claro (según especificac
Cancelería)
M05 Bastidor de 5 cm de ancho con recubrimiento de mármol S.M.A.

P I S O S

Piso a base de placas de granito sandblasteado, en formatos variables S.M.A. Pa


P01
ver planos correspondientes.

Piso a base de placas de granito flameado en formatos variables S.M.A. Para des
P02 planos correspondientes.

Firme de concreto armado, acabado pulido S.M.A. en tableros no mayores a 10 m


P03 cortadora. Ver planos de Escaleras y Despieces de pisos.

Piso a base de porcelanato de 2 cm de espesor, marca y color S.M.A. Ver planos d


P04

Piso a base de gravilla S.M.A.


P05

Piso a base de duela de madera de ingeniería marca y color S.M.A., pegado sobre
P06 planos de Despieces de pisos.

Alberca Fondo de Concreto Armado (S.D.E.) Interior Green stone sukabumi S.M.A.
P07
Tierra vegetal en jardinera de concreto armado S.D.E. con capa de impermeabiliz
aplicación en caliente, marca y color S.M.A. con contención de malla geotextil tipo
P08
detalles, ver planos de Paisaje.

Piso a base de placas de mármol en formatos variables S.M.A. Para despieces es


P09 correspondientes.
NÚMEROS GENERADORES - CASA ROBLESGIL
[ CASA ROBLESGIL ]

M U R O S

M01 Muro de concreto armado S.D.E., acabado aparente, cimbrado con tableros horizontale
integral y sellador mate S.M.A. Ver planos de Despieces

LAVADO SOTANO

EJE TRAMO DESCRIPCIÓN

C O2 O4 MURO INTERIOR
C O2 O4 MURO EXTERIOR
- - -
- - -
A1 O2 O4 MURO INTERIOR
A1 O2 O4 MURO EXTERIOR
- - -
- - -
- A1 C MURO INTERIOR
- A1 C MURO EXTERIOR
O4 A1 C MURO INTERIOR
O4 A1 C MURO EXTERIOR

C U A R T O D E M A Q U I N A S P.

EJE TRAMO DESCRIPCIÓN

O8 a - MURO INTERIOR
O8 a - MURO EXTERIOR
- a - MURO INTERIOR
- a - MURO EXTERIOR
a O8 - MURO INTERIOR
a O8 - MURO EXTERIOR
- a - MURO INTERIOR
- a - MURO EXTERIOR

P L A N T A B A J A
VERTICALES
EJE TRAMO DESCRIPCIÓN

Y D E MURO EXTERIOR
Y D E MURO INTERIOR
O2 a D MURO EXTERIOR
O2 a D MURO INTERIOR
- A1 B MURO EXTERIOR
- A1 B MURO INTERIOR
CL - E MURO EXTERIOR
CL - E MURO INTERIOR
O3 A1 B MURO EXTERIOR
O3 A1 B MURO INTERIOR
O3 D1 E MURO EXTERIOR

O3 D1 E MURO INTERIOR ESCALERA

O4 a B MURO INTERIOR

O4 a B MURO EXTERIOR

O4 D1 E MURO INTERIOR

O4 E B MURO EXTERIOR

O4 E B MURO INTERIOR

O5 a B MURO EXTERIOR

O5 a B MURO INTERIOR

O6 a B MURO INTERIOR

O6 a B MURO EXTERIOR
HORIZONTALES
a O2 8C MURO EXTERIOR

a O2 8C MURO INTERIOR

a O2 8C MURO INTERIOR

A1 O2 O3 MURO INTERIOR RECAMARA

A1 O2 O3 MURO INTERIOR

A1 3A O4 MURO INTERIOR BAÑO

A1 3A O4 MURO INTERIOR ESCALERA

B O2 2A MURO INTERIOR

B O2 2A MURO INTERIOR

B 3A O4 MURO INTERIOR ESCALERA

B 3A O4 MURO INTERIOR PASILLO


B BUFFETERA
B O5 O6
B O5 O6
- O6 -
- O6 -
C O2 -
C O2 -
C2 O2 O4
C2 O2 O4
D F O2
D F O2
D1 O2 O3
D1 O2 O3
CLOSET RECAMARA

- - -
E F O3
E F O3
β O4 O6
β O4 O6
NÚMEROS GENERADORES - CASA ROBLESGIL
[ CASA ROBLESGIL ]
M U R O S

M03 Bastidor de 5 cm de ancho con recubrimiento de madera de 2cm por lado, acab

P L A N T A A L T A

RECAMARA NIÑOS

EJE TRAMO DESCRIPCIÓN

- - -
- - -
- - -
3A
-
-
3A
C2 O2 3A

RECAMARA

EJE TRAMO DESCRIPCIÓN

O3 D1 E
D1 O2 O3
- - -
D1 O2 2A
2A O1 -
- - -

FAMILY ROOM

EJE TRAMO DESCRIPCIÓN


O5 C C2

RECAMARA NIÑAS

EJE TRAMO DESCRIPCIÓN

D1 - O5
- - -
- - -
- - -
- - -
- - -
- - -
- - -
RECAMARA PRINCIPAL

EJE TRAMO DESCRIPCIÓN

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

T A P A N C O S

TAPANCO NIÑOS

EJE TRAMO DESCRIPCIÓN

C O2 3A
C2 O2 O5

TAPANCO NIÑAS

EJE TRAMO DESCRIPCIÓN

E O4 O5
D1 O2 O5

TAPANCO NIÑAS
EJE TRAMO DESCRIPCIÓN

C2 O5 -
- - -
SA ROBLESGIL

AL DE ACABADOS

R O S

brado con tableros horizontales de 9.00cm ,con


anos de Despieces
rtero fino de 1.5cm por lado, acabado con dos

a de 2cm por lado, acabado aparente S.M.A.

l claro (según especificación en planos de

l S.M.A.

S O S

atos variables S.M.A. Para despieces específicos

variables S.M.A. Para despieces específicos ver

leros no mayores a 10 m², juntas hechas con

color S.M.A. Ver planos de Despieces de pisos.

olor S.M.A., pegado sobre firme autonivelante. Ver

n stone sukabumi S.M.A.


n capa de impermeabilizante vulcanizado de
ón de malla geotextil tipo Pavitex o similar. Para

S.M.A. Para despieces específicos ver planos


SA ROBLESGIL

R O S

do con tableros horizontales de 9.00cm ,con impermeabilizante

SOTANO

LARGO ANCHO PIEZAS TOTAL M2

5.04 2.10 10.58


5.40 2.30 12.42
2.50 2.10 5.25
1.20 2.10 2.52
5.04 2.10 10.58
5.40 2.10 11.34
1.36 1.10 1.50
0.60 1.10 0.66
3.55 2.10 7.46
3.85 2.30 8.86
3.55 2.10 7.46
3.85 2.30 8.86

87.47

M A Q U I N A S P. B.

LARGO ANCHO PIEZAS TOTAL M2

4.05 2.10 8.51


4.60 2.30 10.58
3.20 2.10 6.72
3.60 2.30 8.28
2.35 2.10 4.94
2.80 2.30 6.44
2.20 2.10 4.62
2.60 2.30 5.98

56.06

A B A J A
CALES
LARGO ANCHO PIEZAS TOTAL M2

5.00 2.84 13.05


4.50 2.30 9.20
10.30 2.84 23.50
8.10 2.30 12.88
2.10 2.30 4.83
2.10 2.30 4.83
1.85 2.30 4.26
2.20 2.30 5.06
2.15 2.30 4.95
2.30 2.30 5.29
2.80 2.30 6.44
3.10 2.30 7.13
4.25 2.84 10.35
4.80 2.84 11.91
3.15 2.30 7.25
4.50 2.84 10.02
7.50 2.30 14.49
2.90 2.84 8.24
2.60 2.30 5.98
2.75 2.30 6.33
2.60 2.84 7.38

183.35
NTALES
28.10 2.84 81.95
4.85 2.30 11.16
21.70 2.84 63.51
2.20 2.30 5.06
2.05 2.30 4.71
1.10 2.30 2.53
1.25 2.30 2.88
1.30 2.30 2.99
1.25 2.30 2.88
1.20 2.30 2.76
1.35 2.30 3.11
4.30 0.64 2.75
0.55 2.30 1.27
0.55 2.30 1.27
6.20 0.80 4.96
6.30 0.80 5.04
0.90 2.30 2.07
0.90 2.30 2.07
4.50 2.30 10.35
4.60 2.30 10.58
5.15 2.84 14.63
5.00 2.30 11.50
2.40 2.30 5.52
2.25 2.30 5.18
0.75 2.30 1.73
0.60 2.30 1.38
5.05 2.30 11.62
5.95 2.84 16.90
6.40 2.30 14.72
6.60 2.84 18.74

325.78
SA ROBLESGIL

R O S

ra de 2cm por lado, acabado aparente S.M.A.

A A L T A

A NIÑOS

LARGO ANCHO PIEZAS TOTAL M2

1.00 2.15 2.15


0.80 2.15 1.72
2.30 2.15 4.95
0.70 2.15 1.51
0.10 2.15 0.22
0.10 2.15 0.22
0.70 2.15 1.51
3.30 2.15 7.10

19.35

MARA

LARGO ANCHO PIEZAS TOTAL M2

3.00 2.15 6.45


2.40 2.15 5.16
0.10 2.15 0.22
0.80 2.15 1.72
2.00 2.15 4.30
0.10 2.15 0.22

18.06

Y ROOM

LARGO ANCHO PIEZAS TOTAL M2


3.25 2.15 6.99

6.99

A NIÑAS

LARGO ANCHO PIEZAS TOTAL M2

3.30 2.15 7.10


0.70 2.15 1.51
0.15 2.15 0.32
0.15 2.15 0.32
0.70 2.15 1.51
2.30 2.15 4.95
0.80 2.15 1.72
1.00 2.15 2.15

19.57
PRINCIPAL

LARGO ANCHO PIEZAS TOTAL M2

1.00 2.15 2.15


0.80 2.15 1.72
2.30 2.15 4.95
0.80 2.15 1.72
0.15 2.15 0.32
0.15 2.15 0.32
3.10 2.15 6.67
0.90 2.15 1.94
1.30 2.15 2.80
0.90 2.15 1.94
0.15 2.15 0.32

24.83

TOTAL PLANTA ALTA 88.80

N C O S

O NIÑOS

LARGO ANCHO PIEZAS TOTAL M2

4.30 0.90 2 7.74


8.70 0.90 2 15.66

23.40

O NIÑAS

LARGO ANCHO PIEZAS TOTAL M2

4.30 0.90 2 7.74


8.70 0.90 2 15.66

23.40

O NIÑAS
LARGO ANCHO PIEZAS TOTAL M2

5.80 0.90 2 10.44


2.25 0.90 2 4.05

14.49

TOTAL TAPANCOS 61.29

150.09