Construction Page 4 room is 40 ft x 30 ft in plan. Ceiling height is 12 ft. Openings for doors and windows has a total area of 8S 2, The following rates are given for the crew: 1 supervisor $25/hr Teepe Wall area + ceiling area ~ opening area 2 painter $20/hr = 12[(30-+ 30) + (40+ 40)] +(4030)-85 Plastering production = 60 fi/Labor hr. 798 fe Painting production = 160 ft/Labor hr. Plaster and paint crew: ee Calculate the area of walls and ceiling ‘The estimated labor cost for plastering and painting the room (walls and ceiling) is: a) $2428 b) $2480 ©) $2525 d) $2685, Assumption _: Plastering and painting are sequential tasks. lasterin 2795 FE __, $14/hr 4 OTE /Labor hr. “i labor ~*°°? "6 \ 2795 __$20/tn anes + FEO RE /Labor hr “2 labors ~ *1746° Supervision 2788 2798 fe $25/h" _ $1601.25 GO fe /Labor he.” 160 fe" /Labor he.) "1 labor ‘otal cost = $652.16 + $174.69 + $1601.25 = $2426.1 (Answer : A) CIVIL ENGINEERING