Data Lapangan

OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 27 April 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

21+300 85819.609 761208.105 38.319


85787.139 761214.612 39.416
85783.188 761220.048 39.472
85788.382 761192.631 39.470
85782.747 761188.881 39.241
85776.831 761184.537 39.416
85821.285 761205.750 42.096
85816.636 761200.392 41.907
85792.444 761190.642 41.434
85777.765 761182.633 40.885
85772.802 761188.736 40.219
85773.588 761189.725 39.029
85767.313 761196.800 39.989
85768.697 761196.911 38.555
85778.750 761205.766 38.537
85788.193 761212.349 38.516
85793.928 761207.647 38.689
85784.945 761201.573 38.545
85807.224 761226.254 39.112
85807.117 761226.747 40.000
85812.173 761218.969 39.071
85814.007 761220.337 40.192
85772.160 761198.305 38.498
85768.836 761202.406 38.221
85777.069 761209.154 38.137
85787.699 761216.127 38.313
85765.986 761199.716 38.141
85762.114 761194.201 38.142
85810.611 761231.141 38.162

Pekanbaru, 27 April 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 21 Mei 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+877 CL 86718.097 759936.834 39.600


L1 86705.469 759927.281 39.456
L2 86692.840 759917.185 38.315
R1 86728.273 759944.532 39.876
R2 86742.821 759955.536 38.763

22+900 CL 86729.736 759920.503 39.500


L1 86720.196 759913.840 39.082
L2 86714.949 759936.171 40.159
L3 86699.138 759926.502 39.692
L4 86697.871 759925.923 40.156
R1 86736.804 759926.006 39.156
R2 86732.195 759945.620 38.997
R3 86731.737 759946.225 39.676
R4 86753.856 759941.317 38.890

22+925 CL 86744.230 759900.180 39.338


L1 86732.822 759895.596 38.944
L2 86719.116 759882.625 39.102
L3 86718.398 759880.842 40.868
R1 86754.498 759907.430 38.102
R2 86755.087 759907.788 39.328
R3 86761.501 759911.576 39.163
R4 86762.392 759912.242 39.988
R5 86769.943 759916.389 39.942
R6 86771.332 759917.549 41.701
R7 86775.343 759889.793 41.053

22+950 CL 86758.733 759879.885 38.097


L1 86736.609 759862.030 39.312
L2 86731.278 759860.673 39.993
R1 86757.674 759879.370 38.118
R2 86757.483 759879.267 39.552
R3 86768.443 759887.354 39.352
R4 86746.578 759871.502 38.732
R5 86774.214 759889.977 39.611
R6 86783.337 759896.146 41.094

22+960 CL 86764.431 759871.880 38.097


L1 86760.836 759869.756 38.312
L2 86758.786 759868.458 39.401
L3 86736.474 759854.333 40.789
R1 86769.850 759875.746 38.275
R2 86771.246 759876.702 39.376
R3 86790.761 759890.062 41.567

Pekanbaru, 21 Mei 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 28 Mei 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

20+650 CL 85381.640 761721.000 46.542


L1 85376.050 761709.300 44.997
L2 85372.770 761705.400 45.000
L3 85367.730 761702.200 45.000
L4 85366.130 761702.400 45.846
L5 85353.000 761696.800 46.752

20+675 CL 85398.290 761702.300 45.765


L1 85389.520 761698.300 44.493
L2 85388.460 761697.300 43.550
L3 85382.470 761684.900 43.621
L4 85381.920 761683.600 45.451
L5 85370.150 761677.500 45.653

20+700 CL 85415.080 761683.300 44.134


L1 85403.490 761669.800 43.475
L2 85403.010 761669.100 44.244
L3 85387.270 761658.900 45.672

20+710 CL 85421.670 761675.800 44.280


L1 85395.100 761650.000 44.482

21+292 CL 85782.020 761219.400 38.765


L1 85755.850 761199.300 38.432
R1 85808.230 761239.500 38.854

21+300 CL 85786.780 761212.900 38.674


L1 85760.510 761193.000 38.543
R1 85813.260 761232.900 38.987

21+325 CL 85801.910 761193.100 40.254


L1 85775.880 761172.800 49.987
R1 85827.250 761214.200 40.087

Pekanbaru, 28 Mei 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 1 Juni 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

20+907 CL 85547.752 761524.890 41.540


L1 85533.848 761512.616 40.130
R1 85563.048 761537.759 40.124

20+925 CL 85558.944 761510.828 39.765


L1 85534.679 761490.742 41.056
R1 85583.209 761530.915 39.578

20+943 CL 85570.097 761496.700 40.134


L1 85545.866 761476.565 39.878
R1 85594.320 761516.829 39.675

Pekanbaru, 1 Juni 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 2 Juni 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

21+125 CL 85680.770 761352.200 38.734


L 85658.050 761333.400 38.546 29.489632076332
R 85703.420 761371.100 38.760 29.4997033883498

21+150 CL 85695.930 761332.300 39.876


L 85672.620 761314.200 39.765 29.5121347923742
R 85719.120 761350.500 40.876 29.4790790222221

Pekanbaru, 2 Juni 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA INFRASTRUKTUR
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO)

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK BC 21+113
Surveyor : Muamar Mujab
Tanggal : 5 Juni 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING
BOX 21+113
OUTLET 85651.972 761349.149 39.324
OUTLET 85654.024 761346.409 39.456
OUTLET 85655.236 761344.947 37.321
OUTLET 85658.088 761341.331 37.245
OUTLET 85659.167 761339.679 39.113
OUTLET 85661.903 761336.413 39.368
INLET 85691.576 761379.296 39.498
INLET 85693.694 761376.177 39.365
INLET 85694.409 761375.181 37.534
INLET 85696.937 761371.977 37.643
INLET 85697.804 761370.888 39.478
INLET 85699.743 761368.189 39.543

Pekanbaru, 6 Juli 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 6 Juli 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

20+650 CL 85381.640 761721.000 46.542


R1 85382.130 761722.300 45.537
R2 85382.540 761722.400 46.402
R3 85402.540 761739.600 50.564

20+675 CL 85398.290 761702.300 45.765


R 85418.970 761721.200 50.789

20+700 CL 85415.080 761683.300 44.134


R1 85420.320 761685.200 43.741
R2 85430.600 761694.600 44.047
R3 85437.020 761701.100 44.633
R4 85440.470 761707.400 45.867

20+710 CL 85421.670 761675.800 44.280


R 85447.010 761699.900 45.765

Pekanbaru, 6 Juli 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 09 Juli 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

21+275 CL 85771.624 761232.864 40.876


L1 85791.051 761248.302 39.970
R1 85752.051 761217.310 41.210

21+290 CL 85780.783 761221.128 38.645


L1 85801.566 761236.752 38.813
R1 85760.124 761205.342 38.983

Pekanbaru, 09 Juli 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 27 Juli 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

21+090 CL 85659.610 761380.000 38.397


L 85639.680 761364.900 38.234
R 85679.500 761395.200 38.178

21+100 CL 85665.630 761372.100 38.223


L 85645.920 761356.700 38.123
R 85685.890 761386.700 38.215

21+110 CL 85671.680 761364.200 38.302


L 85651.800 761349.000 38.452
R 85691.580 761379.300 38.341

Pekanbaru, 27 Juli 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 27 Juli 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 2 Agustus 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

23+725 CL 87208.804 759248.916 42.709


L 87186.191 759232.404 42.301
R 87231.417 759265.428 42.975

23+750 CL 87223.339 759228.540 44.209


L1 87215.746 759223.448 44.533
L2 87210.605 759219.613 44.741
L3 87205.015 759215.713 46.074
R1 87233.516 759236.213 44.691
R2 87238.470 759239.715 44.528
R3 87243.489 759243.836 44.523
R4 87245.473 759245.690 44.511

23+775 CL 87237.723 759208.375 51.127


L1 87228.716 759201.536 48.385
L2 87224.172 759198.694 47.483
L3 87218.754 759194.203 48.147
R1 87242.945 759211.733 50.824
R2 87246.629 759214.307 51.150
R3 87248.026 759215.199 50.895
R4 87250.918 759217.269 51.132
R5 87253.164 759218.880 51.461
R6 87256.446 759221.731 51.441

Pekanbaru, 2 Agustus 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 9 Agustus 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

20+943 CL 85570.116 761496.680 39.087


L 85547.654 761477.544 39.345
R 85592.627 761515.743 39.633

20+950 CL 85574.437 761491.172 39.509


L 85551.719 761472.352 39.798
R 85597.419 761509.667 39.865

20+975 CL 85589.785 761471.474 42.130


L 85566.525 761452.534 40.671
R 85596.186 761476.436 44.015

20+985 CL 85595.866 761463.535 42.976


L 85577.664 761447.868 40.765

Pekanbaru, 9 Agustus 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 16 AGUSTUS 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+470 1 86462.971 760241.871 46.489


2 86464.510 760241.130 45.062
3 86441.459 760259.556 51.033
4 86448.587 760270.346 51.581
5 86466.714 760264.051 47.018
6 86488.297 760299.715 49.392
7 86493.043 760295.445 48.028
8 86494.658 760294.667 47.058

Pekanbaru, 16 AGUSTUS 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 16 AGUSTUS 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 31 AGUSTUS 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+000 1 86207.228 760653.005 52.894


2 86196.384 760645.360 53.263
3 86187.123 760639.053 52.068
4 86184.227 760637.201 51.777
5 86189.484 760629.490 51.492
6 86193.715 760623.042 50.875
7 86196.929 760625.177 51.076
8 86205.295 760631.282 51.120
9 86216.739 760639.489 50.206
10 86228.033 760647.747 50.249
11 86237.251 760654.783 50.252
12 86236.168 760656.631 51.410
13 86233.115 760661.770 51.333
14 86230.086 760666.173 51.312
15 86228.364 760668.496 52.173
16 86226.753 760667.140 52.547
17 86221.169 760662.843 52.581
18 86215.164 760658.503 52.418

22+075 1 86261.998 760569.761 55.447


2 86254.903 760564.939 54.315
3 86245.065 760557.825 53.523
4 86242.693 760555.939 53.225
5 86249.975 760591.740 52.092
6 86250.819 760590.760 52.242
7 86248.050 760588.901 52.075
8 86248.734 760593.462 51.963
9 86243.234 760586.805 51.891
10 86232.531 760579.287 51.988
11 86227.621 760575.845 51.969
12 86221.565 760584.161 51.201
13 86220.094 760586.902 50.562
14 86218.687 760588.525 49.541
15 86217.051 760591.477 49.278
16 86231.183 760601.393 51.333
17 86229.589 760603.654 49.489
18 86237.598 760610.430 51.525
19 86236.356 760612.666 49.561
20 86244.368 760618.999 51.383
21 86259.406 760631.688 51.100
22 86265.024 760623.640 52.942
23 86251.756 760612.625 51.660
24 86258.859 760602.039 54.470
25 86256.994 760600.094 52.847

Pekanbaru, 31 AGUSTUS 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 2 SEPTEMBER 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+836.84 CL 86693.184 759971.942 41.540


L1 86676.784 759958.379 40.130
L2 86673.438 759957.851 41.029
R1 86709.602 759981.963 40.809
R2 86714.679 759984.314 43.010

22+850 CL 86700.746 759961.176 40.776


L1 86684.599 759949.773 39.878
L2 86679.975 759947.311 40.305
R1 86722.400 759974.524 40.864

Pekanbaru, 2 SEPTEMBER 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 12 SEPTEMBER 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

20+750
GEO 85436.859 761693.243 46.841
GEO 85443.054 761692.770 46.475
GEO 85445.763 761692.325 44.481
BOX 85447.708 761690.288 44.297
BOX 85450.069 761687.123 44.241
GEO 85451.384 761685.254 44.299
GEO 85456.166 761682.357 45.392
BOX 85438.931 761656.797 43.179
GEO 85437.597 761657.160 43.481
GEO 85436.725 761657.844 44.462
GEO 85430.081 761665.530 46.507
GEO 85447.739 761645.749 44.981
GEO 85443.788 761650.497 44.466
BOX 85441.305 761653.509 43.606
GEO 85419.680 761625.340 44.950
GEO 85423.439 761623.892 42.716
BOX 85429.589 761620.338 42.388
BOX 85432.271 761617.175 42.910
GEO 85434.081 761615.143 42.851
GEO 85437.089 761618.379 44.436
GEO 85441.915 761620.542 44.305
GEO 85451.350 761626.468 47.451
GEO 85451.137 761645.036 48.186

Pekanbaru, 12 SEPTEMBER 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 26 SEPTEMBER 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

21+275 CL 85771.624 761232.864 40.876


L1 85791.051 761248.302 39.970
R1 85752.051 761217.310 41.210

21+290 CL 85780.783 761221.128 38.645


L1 85801.566 761236.752 38.813
R1 85760.124 761205.342 38.983

Pekanbaru, 26 SEPTEMBER 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 4 Oktober 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+050 A 86236.885 760612.331 46.656


B 86232.656 760616.236 46.332
C 86209.240 760580.690 46.750
D 86205.628 760585.536 46.692
E 86223.750 760595.351 46.315
F 86219.545 760600.239 46.449
G 86244.704 760625.060 47.164
H 86242.226 760627.694 47.246
I 86261.090 760640.422 47.482
J 86256.032 760644.518 47.528

Pekanbaru, 4 Oktober 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 8 Oktober 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+050 1 86261.818 760640.549 48.438


LAYER 2 2 86257.153 760643.897 48.250
3 86249.397 760627.833 48.392
4 86245.749 760631.582 48.077
5 86236.670 760611.814 48.068
6 86233.297 760615.356 47.886
7 86221.239 760592.658 47.692
8 86216.722 760596.404 47.846
9 86209.435 760586.544 47.708
10 86215.662 760578.700 47.951
11 86222.321 760588.479 47.754
12 86220.206 760591.111 47.661

Pekanbaru, 8 Oktober 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 9 Oktober 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+050 1 86262.606 760638.001 49.345


LAYER 3 2 86259.685 760641.215 49.321
3 86235.565 760612.933 49.388
4 86238.632 760609.960 49.375
5 86211.001 760579.132 48.729
6 86208.423 760581.450 48.771

Pekanbaru, 9 Oktober 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 11 Oktober 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+050 1 86258.979 760639.765 50.126


LAYER 4 2 86262.609 760636.400 50.301
3 86240.445 760618.733 50.070
4 86245.160 760614.729 50.162
5 86221.868 760596.698 49.619
6 86226.499 760592.214 49.954
7 86238.804 760581.288 50.359
8 86225.587 760570.177 50.212
9 86211.734 760584.274 49.644

Pekanbaru, 11 Oktober 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 17 Oktober 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+050 1 86239.680 760553.842 51.296


LAYER 5 2 86247.719 760564.446 51.561
3 86252.501 760573.374 51.566
4 86238.393 760583.592 51.264
5 86247.201 760590.059 51.536
6 86252.210 760607.077 51.674
7 86262.731 760625.578 51.804
8 86255.398 760634.409 51.254
9 86243.603 760620.756 51.173
10 86236.096 760611.363 51.093
11 86227.804 760601.089 51.029
12 86215.882 760587.113 51.519

Pekanbaru, 17 Oktober 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 25 Oktober 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+050 1 86254.706 760633.385 52.238


LAYER 6 2 86237.863 760611.048 52.472
3 86218.816 760586.491 52.333
4 86229.918 760570.956 52.493
5 86242.849 760554.689 52.400
6 86255.922 760565.262 52.551
7 86247.554 760577.074 52.688
8 86254.390 760585.500 52763.000
9 86255.176 760586.447 52.750
10 86252.451 760588.554 52.612
11 86254.172 760592.348 52.848
12 86252.038 760594.626 52.722
13 86256.049 760600.851 52.757
14 86252.289 760610.565 52.221
15 86263.010 760623.900 52.293

Pekanbaru, 25 Oktober 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 30 Oktober 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

22+050 1 86244.404 760555.947 53.520


LAYER 7 2 86258.832 760567.620 53.675
3 86250.613 760577.779 53.542
4 86258.224 760585.166 53.784
5 86254.593 760590.298 53.876
6 86259.417 760596.933 53.456
7 86256.702 760611.685 54.314
8 86260.414 760616.236 53.447
9 86252.837 760627.575 53.598
10 86238.045 760609.816 53.607
11 86220.737 760587.089 53.197

21+975 1 86206.096 760631.731 47.162


LAYER 1 2 86197.311 760646.486 48.098
4 86183.045 760664.443 48.222
5 86179.464 760661.137 48.392
6 86168.537 760651.470 48.291
7 86178.992 760634.490 48.001
8 86188.965 760617.206 47.346
9 86197.116 760623.953 47.247

BC 22+850
22+850 CL 86700.746 759961.176 40.776
L1 86684.599 759949.773 39.878
L2 86679.975 759947.311 40.305
R1 86722.400 759974.524 40.864

22+866 CL 86707.520 759952.104 40.879


L 86691.548 759938.786 40.765
R 86724.764 759966.483 40.243

Pekanbaru, 30 Oktober 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 30 Oktober 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

21+975 1 86169.444 760655.904 49.296


LAYER 2 2 86183.588 760666.840 49.324
3 86194.468 760648.963 49.481
4 86199.630 760652.697 49.627
5 86203.394 760646.989 49.824
6 86212.660 760652.968 49.345
7 86218.669 760645.139 49.462
8 86189.282 760620.679 49.141

Pekanbaru, 30 Oktober 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)


Data Lapangan
OPNAME GEOTEK
Surveyor : Muamar Mujab
Tanggal : 10 November 2018
Merk/No. Alat : Topcon GTS 255

COORDINATE
STATION REMARK ELEVASI OPNAME
NORTHING EASTING

BC 22+870 1 86738.066 759954.731 40.123


2 86716.936 759938.462 40.342
3 86696.977 759922.999 40.378
4 86692.425 759934.552 40.452
5 86709.631 759948.703 40.119
6 86729.264 759965.576 40.574

Pekanbaru, 10 November 2018

Disetujui oleh: Diperiksa oleh: Dibuat oleh:


PT. HUTAMA KARYA (Persero) KONSULTAN PENGAWAS KONTRAKTOR
DIVISI PENGEMBANGAN JALAN PT. EGIS INTRENASIONAL INDONESIA PT. HUTAMA KARYA
TOL RUAS PEKANBARU - DUMAI – PT. BUANA ARCHICON (KSO) INFRASTRUKTUR

(……………………………………………..) (……………………………………………..) (………………………………)