KAHRAL J) MAA
clo wee
Ub ples gl
(Qatar General Electricity & Water Corporation |
EPP-C1
Electricity Planning
Regulations for Supply
pote ving Py aaj statsry Planning Regus for Supply ur
cument Control
om oe Dormant ibe
EP Code of Practice Electricity Planning
anata or Sam
issue Approval
Prepared By Reviewed By ‘Approved By
a -
=
oe 7 een
romero | sods aa i
aru pi
Ries |
‘Radu Naseer Ab Nahia
Signatur: ‘Signature: ‘Signature:
(Sgr orpinatfiek — | (gue orginal paral) (Signe orginal ll
‘paates) seperately
Ee CTC
Issue No. Date Reason for issuing the document
00 20-02-2016 | First seus of the document
+ Tplomentation of KFISMS-PLO2 “information
‘Asset Management Poley" as rertioned in PO-
10 141972017 PQQ.Pt under section 4.0 and 5).
‘+ Revised to include Civil Defense and other
requirements
20 orior2018 | Revised customer substation load citeva
30 2OrTT2O18 _ | Revised Substation floor levels
Roview Frequency: Every Three Yearspeeked
rm
Contents Page
Title Page q
Document Control & Issue Record Page 2
Table of Contents 3
41. Purpose 4
2. Scope 4
3. Abbreviations, Definitions of Terms & Key References 4
4, Regulations 5
44 General Guidelines 6
42 Load Criteria 7
43. Industrial Development Areas 8
44 Infrastructure Areas 9
45 Non-Planned Areas (i. farms, izbas, etc.) 9
48 Independent Villas in One Plot 9
47 Supply to Compound 9
48 Substation Requirements 10
42° Civil Requirements "
4.10 Network Existing Inside Plots 7
4.11 Safety Requirements 7