You are on page 1of 7
STeGrence from Railway Tne’ SS .. 333k Gre v ge cam tow vege jo transformers [Reports _tegarcing —S The _T Th ; igi Prior pgtatiadion tans{ormer- The report ; oH Quick Chee Kis Transformer insdallation. Checked pe Fomplefed before the ore elect Below nod with system voltage Ciocey) not with Stondlarcl clisterbution volase Con = Hy ratings equ" .ge equal oF -Lv volioge &4Y bushings, Upper bushings, tank seals .etc cei teaks from lower Ore = Setise one = oartmgconts 61 oh tna A © Continuity of by winclngs, HY a : = Continuity dest for Hv is done for each t4P Position istance hetween Qrehing hones, for wkv 7S-domm OF noj 4o_Commissioning Kaviek checklot after installation Gncl_priov ‘the trans for mer, afder istatiation | = Mo GOCE On bushing = check the electrodes of bodly earth, Surge areesioy 2£0rth, neutral est | [- earthing connections done from copper wire OF strip only. | ~Condiowity of earth wire or Strip — HV surge arresdors fixed and properly earthed geparaie from nedie| = Earth resistance @F neutral ana body earth below 1o2 ~ Tap position 16 selected fo narminal position ar nat Ci,e00/ive2) ~ All Conducior ails properly fixed 40 lugs and Cannectect 10 bushings | [=H connectors properly crimped Or not for Hv Cur) tapping of He ke HRC fuses for HY and LY Ore used With correct ratieggs or NOt | | Leas are kept open or not 9 | ~ Ly tals belween FDS 4 Lv bushings are properly laid | -Down Conductors Gre fixed to the pole using stainless steel straps! — Erecy meter properly insta ‘ x, % Properly installed with the hight of 3m or not e thiegs that cre checked regarding to : under no lood. 4 ArCinsformer energizing | = check dhe open circuit Lv iveul volt J“ i = Phase cequence iS maich or oe we lage using preci wie = Energy tneter readings 18 matched oy NE System phase sequene Ok with [ ifigestince sitelog faite report 2 = Tmsulation recis ten with Sky Ti : ao - LV tine: Barth vesistance of Tank coy es - Hy Fuse Cul-Outl Switch ae ee ~ Bushings ~Aresters ~ Continuity of earth [ead 7 Sue Disconnecting Commissioning Of Disirip, oe mtion Substot ions — Test Report SyTrensiurmer sefialao wy No lad Lv vols ely Yd BI MaKe ta) Earth resistance westrel, body earth areas of wecinfacdure, 12) Mede ring phase SEguente, Neapocity Pa kwh mineier inibicn) Each ngs ayTap position 14) COntinady 128+ on CT wires from meler pannel Dore of Commissioning 15) pnewe sequence bedore energi sings Het ratio tesa energising gy pection : as feeder pare ld ; 1) Insulotion Sesistone Cus) DdLo Cuev) fuse rediog cay 4etminal tO body earth any terminal te n@udsal seas ta) Cusiome r Service Centre _ wy 4erminal 10 -body €arth aby Lotel Uuahoyit aid ay FO LY ts ee 3: ls)iv feeder date SIGNATURE OF TRAINEE. | REMARKS AND CERTIFICATION BY THE ENGINEER / T.O DATE: of the meter Caccuracy) Octo: # Diecieonic Meter > classi ener Single ehose/ Tr phase Smart Heler ¥ Electeo-trechantol_y class2 > error 2% meter <—D Giev Eulb— Binks accorcting to +E - Kwh value Of meier ay \ ’ Tou meter — 16co ime/kwh fer—sc0e imp/ewh x<—o Smart TR Port— Used do communicate with meser MEU. This iS O Serial commence methed bsecl do change the Led display fo view different 2- Only awailable in smart meters. from “the remote, remote failwe eatificedions e4c- anc OL commanicade with an extemal seer | END measee dhe ower clistebution system in each three phases by Ouaraging he amples pre clifined and configurable intervals. 3D with a foal me stamp in an send tne cata do the Sever octuws: af the wD. a do identify fares Categories of voltage interruptions Swels> Catagory | — Bomentary | Cakegory 2- Teepore's Category 3 - Pretend Param eters

You might also like