%COMPLETE( act)
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
1.1 Collection of Maps, Designs, Drawings & Specifications 5/30/2018 93 8/31/2018 1% 20%
1.2 Survey all Area 5/30/2018 77 8/15/2018 2% 70%
1.3 Order, manufacture & delivery of pipes 7/25/2018 250 4/1/2019 72% 6%
CONSTRUCTION OF PUMPING MAINS & PUMPING STATIONS
2 (SEWER & STORM)
2.1 Construction of intermediat lift pumpstation 9/1/2018 200 3/20/2019 71% 4%
2.2 Construction of Pumping Stations 9/1/2018 350 8/17/2019 40% 10%
2.3 supply and install of Pumps & all equipment 8/1/2018 500 12/14/2019 34% 60%
2.4 Install Pumps & Force Mains 7/1/2018 60 8/30/2018 0%
3 CONSTRUCTION OF SEWERAGE NETWORKS
3.1 Cast manholes and network accessories, Coaring, Coating 5/30/2018 #VALUE! #VALUE!
3.2 Laying & Backfilling of pipe line sewer drain 5/31/2018 700 4/30/2020 33%
3.3 House service connection work 6/1/2018 500 10/14/2019 47%
3.4 Construction ventilation column 6/2/2018 800 8/10/2020 29%
3.5
4 CONSTRUCTION OF STORM WATER NETWORKS
4.1 Construction of manholes 5/30/2018 500 10/12/2019 47%
4.2 Laying of storm main 5/5/2019 600 12/25/2020 0%
4.3 Laying Backfilling of pipe line storm drain 8/8/2019 500 12/20/2020 0%
4.4 service work (gullys) 11/8/2019 496 3/18/2021 0%
4.5
5 CONSTRUCTION OF TRUNK SEWER
5.1 Construction of manholes 6/1/2018 500 10/14/2019 47%
5.2 Laying of sewer main 6/6/2018 500 10/19/2019 46%
5.3 Laying & Backfilling of pipe line 8/8/2019 500 12/20/2020 0%
5.4 Construction of ventilation column 11/8/2019 496 3/18/2021 0%
5.5 Disposal of surplus earth & cleaning the area 10/10/2018 700 9/9/2020 15%
5.6 Inter connection of left pumping mains 11/11/2018 600 7/3/2020 12%
CONSTRUCTION OF LEFT PUMPING STATION AND ANCILLARY
6 WORKS
6.1 Main Pumping Station Civil work 6/6/2018 500 10/19/2019 46%
6.2 Order, manufacture & delivery of Screw Pumps & all equipment 7/7/2019 500 11/18/2020 0%
6.3 Install & test Pumps 8/8/2019 500 12/20/2020 0%
6.4 Final inspections & handover Pumping Station 11/8/2019 496 3/18/2021 0%
7 CONSTRUCTION OF ROAD WORKS
7.1 Soil leveling & compaction 5/5/2019 500 9/16/2020 0%
7.2 Sub base work 7/7/2019 500 11/18/2020 0%
7.3 Asphalt concrete 8/8/2019 500 12/20/2020 0%
7.4 Walking way pavements 10/10/2018 700 9/9/2020 15%
7.5 Other misc road works 11/11/2018 600 7/3/2020 0%
Commissioning the scheme 11/8/2019 496 3/18/2021 0%
100% 100%
days after
today start starting
1 1 REDESIGNING
Preparation of Detailed Project Report,
2 1.1 Design & Drawings
1
3 1.2 Survey all Area 2
4 1.3 Order, manufacture & delivery of pipes 3
2.1 Laying of pumping Mains pipe lines 5
2.2 Testing of pumping Mains pipe lines 6
6 2.3 Construction of Pumping Stations 7
Order, manufacture & delivery of
7 2.4 Pumps & all equipment
8
8 2.5 Install & test Pumps & Rising Mains 9
Final inspections & handover Rising
9 2.6 Mains/Pumping StationsOF STORM
10
CONSTRUCTION
10 3
WATER NETWORKS
11
11 3.1 Construction of manholes 12
12 3.2 Laying of storm main 13
Backfilling & testing of pipe line storm
13 3.3 drain 14
14 3.4 service connection work 15
Disposal of surplus earth & cleaning
15 3.5 the area 16
16 3.6 Inter connection of pumping mains 17
18 4.1 Construction of manholes 19
19 4.2 Laying of sewer main 20
Backfilling & testing of pipe line
20 4.3 21
sewer drain
21 4.4 House service connection work 22
Construction of cleanout & ventilation
22 4.5 23
column
23 4.6 Disposal of surplus earth & cleaning the 24
24 4.7 Inter connection of pumping mains 25
26 5.1 Construction of manholes 27
27 5.2 Laying of sewer main 28
Backfilling & testing of pipe line
28 5.3 29
sewer drain
29 5.4 Construction of ventilation column 30
Disposal of surplus earth & cleaning
30 5.5 31
the area
31 5.6 Inter connection of pumping mains
33 6.1 Main Pumping Station Civil work
Order, manufacture & delivery of
34 6.2 Screw Pumps & all equipment
35 6.3 Install & test Pumps
69%
225,000,000,000
1 235 12634408602.2 253% 0.0322580645 0.0003468609
1 235 15259740259.7 305% 3% 0.0004189359
1 179 3580000000 72% 3% 0.0001290323
1 141 3525000000 71% 3% 0.0001612903
Err:509 Err:509 3%
1 141 2014285714.29 40% 3% 9.21658986175115E-05
1 172 1720000000 34% 3% 6.45161290322581E-05
1 203 16916666666.7 338% 3% 0.0005376344
Err:509 Err:509 3%
1 235 3%
1 234 1671428571.43 33% 3% 4.60829493087558E-05
1 233 2330000000 47% 3% 6.45161290322581E-05
1 232 2320000000 46% 3% 6.45161290322581E-05
Err:509 Err:509 3% 4.03225806451613E-05
1 235 3%
1 233 3%
1 228 2280000000 46% 3% 6.45161290322581E-05
0 0 0 0% 3% 5.37634408602151E-05
0 0 0 0% 3% 6.45161290322581E-05
0 0 0 0% 3% 6.50364203954214E-05
0 0 3%
0 0 3%
0 0 3%
Err:509 Err:509 3% 6.45161290322581E-05
1 102 1020000000 20% 3% 6.45161290322581E-05
1 70 700000000 14% 3% 6.45161290322581E-05
0 0 0 0% 3% 6.50364203954214E-05
1 102 728571428.571 15% 3% 4.60829493087558E-05
66700101242.8 74% 100% 0.0025183735
0.0815123136 0.0008151231
0.0984499372
0.0230967742
0.0227419355
0.0129953917
0.0110967742
0.1091397849
0.0107834101
0.0150322581
0.0149677419
0.0147096774
0
0
0
0.0065806452
0.004516129
0
0.0047004608
0.4303232338
0%
10/12/2019
5/30/2018
1/20/2019 235
Duration
start End
(Days)
155,000,000,000 #VALUE!
14214
5/30/2018 1050 4/14/2021
ACT.
% COMP.
1% 20%
2% 70%
3% 6%
4% 0%
5% 4%
6% Err:509
7% 10%
8% 60%
9% 0%
10% Err:509
11% 0%
12% 0%
13% 0%
14% 0%
15% 0%
16% Err:509
17% 0%
18% 0%
19% 0%
20% 0%
21% 0%
22% 0%
23% Err:509
24% Err:509
25% 0%
26% 0%
27% 0%
28% 0%
29% 0%
30% 0%
31% 0%
32% 0%
33% 0%
34% 0%
35% 0%
36% 0%
37% 0%
38% 0%
39% 0%
40% 0%
41% 0%
42% Err:509
43% 0%
44% 0%
45% 0%
46%
47%
48%
49%
50%
51%
52%
53%
54%
55%
56%
57%
58%
59%
60%
61%
62%
63%
64%
65%
66%
67%
68%
69%
70%
71%
72%
73%
74%
75%
76%
77%
78%
79%
80%
81%
82%
83%
84%
85%
86%
87%
88%
89%
90%
91%
92%
93%
94%
95%
96%
97%
98%
99%
100%
%
0.0107526882 0 1 0% 100% 0.0322580645
0.012987013 0 2 0% 100% 0.0322580645
0.004 179 3 72% 100% 0.0322580645
0.005 141 4 71% 100% 0.0322580645
0.0028571429 141 5 40% 100% 0.0322580645
0.002 172 6 34% 100% 0.0322580645
0.0166666667 0 7 0% 100% 0.0322580645
#VALUE! 235 8 #VALUE! #VALUE! 0.0322580645
0.0014285714 234 9 33% 100% 0.0322580645
0.002 233 10 47% 100% 0.0322580645
0.00125 232 11 29% 100% 0.0322580645
0.002 235 12 47% 100% 0.0322580645
0.0016666667 0 13 0% 100% 0.0322580645
0.002 0 14 0% 100% 0.0322580645
0.002016129 0 15 0% 100% 0.0322580645
0.002 233 16 47% 100% 0.0322580645
0.002 228 17 46% 100% 0.0322580645
0.002 0 18 0% 100% 0.0322580645
0.002016129 0 19 0% 100% 0.0322580645
0.0014285714 102 20 15% 100% 0.0322580645
0.0016666667 70 21 12% 100% 0.0322580645
0.002 228 22 46% 100% 0.0322580645
0.002 0 23 0% 100% 0.0322580645
0.002 0 24 0% 100% 0.0322580645
0.002016129 0 25 0% 100% 0.0322580645
0.002 0 26 0% 100% 0.0322580645
0.002 0 27 0% 100% 0.0322580645
0.002 0 28 0% 100% 0.0322580645
0.0014285714 102 29 15% 100% 0.0322580645
0.0016666667 70 30 12% 100% 0.0322580645
0.002016129 0 31 0% 100% 0.0322580645
#VALUE! #VALUE!
Task No. Activity
-1 1 2 3
اعمااالإعادة ااالتصميم ACTIVITY-1
Task-1
Task-2
Task-3 اعداد الخرائط ،والتصاميم ،والرسومات & المواصفات
Task-4
Task-5 اعمال المساحة
Task-6
Task-7 استراد النابيب و تخزينها
ACTIVITY-2 ي
انشاء خطوط ااالدفع و ااالمحطات) ثااقيل و مطر (
Task-8 اعمال خطوط االدفع الرئيسي للمحطات
Task-9 اعمال الفحص لخطوط الدفع
Task-10 المباشرة في اعمال محطات الضخ
Task-11 تجهيز المضخات و الملحقات للمحطات و جميع المستلزمات
Task-12 العمال الميكانيكية و نصب ال مضخات
Task-13 الضخ التجريبي و الفحوصات الكاملة لعمال الضخ
اعمااالشاابكة ااالميه ااالمطرية ACTVITY-3
Task-15 اعمال صب المانهولت
Task-16 انشاء الخط المطري الناقل
Task-17 مد خطوط شبكة المجاري المطرية
Task-18 اعمال الكليات
Task-19 التخلص من المخلفات و التنظيف
Task-20
اعمااالااالشبكة ااالثقيلة ACTVITY-4
Task-22 اعمال صب المانهولت
Task-23
Task-24 مد خطوط المجاري الصرف الصحي
Task-25 اعمال ربط المنازل على شبكة الصرف الصحي
Task-26 اعمال ربط و انشاء أعمدة التنفيس
Task-27 التخلص من المخلفات و التنظيف
Task-28
ااالخط ااالناقل ACTVITY-5
Task-29
Task-30 اعمال صب المانهولت
Task-31 مد الخط الناقل
Task-32
Task-33 اعمال انشاءاعمدة التنفيس
Task-34 التخلص من المخلفات و التنظيف
Task-35 اعمال ربط خطوط مع المحطة
محطة السكرو
Task-36 اعمال تنفيذ محطة الضخ الرئيسية
Task-37 تجهيز المضخات و الملحقات للمحطات و جميع المستلزمات
Task-38 ربط المضخات و فحصها
Task-39 اعمال الضخ التجريبي
اعمااالااالبلدية ACTIVITY-7
Task-40 اعمال التسوية للشوارع و الحدل
Task-41 اعمال الدفن بالسبيس
Task-42 اعمال التبليط
Task-43 اعمال النهاءات للمانهولت و الكليات
Task-44 اعمال الرصفة
Task-45 العمال الملحقة بالشوارع
اكمال الملحقات و النواقص
50%
44%
33%
20%
40%
4 5 6 7 8 9 10 11 12 13
جدولة العمل للمشروع من المجاري كاملة القبلة والمطار والثقيلة والبلدية )عطاء رقم /10مجاري(2011/
24 25 26 27 28 29 30 31 32 33
34 35 36 37 38 39 40 41 42