AND KIDATU LINES 2. CHECK STATUS OF UNITS WHICH WERE CONNECTED TO GRID 3. CHECK AVAILABILITY OF AUXILLIARY SUPPLY (DG SET) 4. OPEN IRINGA AND KIDATU CIRCUIT BREAKER 5. OPEN 33KV FEEDERS 6. TAKE NOTE OF TRIPPING INDICATIONS AND RESET BOTH ON VDU AND LOCAL CONTROL ROOM 7. START MACHINES TO ENERGIZE BUSBAR AND RESTORE AUXILLIARY SUPPLY FROM MACHINES. 8. COMMUNICATE WITH NGCC AND WAIT FOR INSTRUCTION 9. CLOSE 33KV FEEDERS 10. CLOSE 220KV LINES ACCORDING TO NGCC INSTRUCTIONS