> ‘Sub: Contract No. MMROA/2B/MMRP/CA-06 :Part Design and construction of elevated viaduct
“3 and 6 elevated stations vz. MTNL Meto, SG Barve Marg, Kurla Termios, Kurla East, EEH
> ‘Echembur (Gxluding Architectural Fishing & Pre-Engineered steel root structure of
‘Stations from Chainage 46749 923m to $2665.389m of Line 28 (O.N. Nagar-Mandale) of
"Mumbai Metro all Project of MMRDA - Submission of Proect Quality Asirance plan
ear,
With eference to above sa subject work andas per Volume 3 Appendix pleas rd enclosed
eceith Project Quality Assurance Plan for your reference.
Hence you are requested to accord your approval the same.
Thanking you
MUMBAI METRO
‘Copy to-Chet Engineer (Chl Metro), MMOS MGA Concerta (GC)
on Uta
ie eaenC
comer aorlazua..
pe ow
F
E
4
3
e
4
E
e
RCC infra Ventures Lt.
1001, Glamcen, Central Avenue Road, Opp. LPs Church, Chembur (Est, Mumbai - 400.073,Toss
a Rea OFS
Sub Sode[tater Type Descpline] Yeor J 1D =
ta eg) IC =| 2018 | sae
pany | mezaceovy [sb compen
‘CTeontract etter io MBzRCc/25/cA06r54
‘Submission of Project Qualy Assurance Pan for your eirenee
[_—_Haracopy location]
fer ‘Quay Assurance Pan
eter [ol conndent |] Prony onan remem
cstoeoe | Westrited normal ff Remark
Ci cenera
rn Forinfomany
Wy. Projet Director
IF contract tin
firFrejec Orector
oy moj Oreor
eae aaa,
5, costing E08 costing
Program & Panning NProgram & Planing
te cviawac 3 civ anya
E algnment ack Vignment/Track
structural Deen Structural Design
I Geo-tec, C1 Geo-teeh.
IF aveitecture C2 arehitectre
Depot ifrastrctre
Project Execution 28-—
Project Execution?
Depot infrastructure
projet Execution 28,
C1 Project Execution 7
Deanne IF camer
5 Powertraction I Powerrrsction
C1 Depot ma IE epor map
System interface
system integration
IE: system interface
system interration
Core Clare
IE Telecommunicstion Es Telecommunication
I signaing signaling
1 Rotng Stock “Roling Stock
oan Conn
IE saferyease)
I Uuites, Trae & Assets
environmental
“Document Controt
Gen. Admin,
CL satetyse)
Unites. Tatieg Acsers
Environmental
Ei Document contol
[cen Adi,LZ 6S Fe :
PROJECT QUALITY ASSURANCE PLAN (PQAP)
Submitted to
MUMBAI METROPOLITAN REGION DEVELOPMENT
AUTHORITY
Part Design and Construction of elevated viaduct and 6
elevated stations viz. MTNL Metro, SG Barve Marg, Kurla
Terminous, Kurla East, EEH & Chembur [Excluding Architectural
Finishing & Pre-engineered steel roof structure of Stations] from
Chainage 46749.923 m to 52665.359 m of Line 28 Corridor [
D.N.Nagar to Mandale] of Mumbai Metro Rail Project of MMRDA.