Pile cap ,PC1

Pile Capacity = 60 MT

dia 500 mm
L = 15000 mm
E = 25000 N/sq.mm
A = 196349.5408 sq.mm
k = 5000 T/m

Pile location Pile cap thk (m) = 0.1 0.2 0.5 0.7 0.9 1.2
1.5 1.8 2 2.2 2.5
in pile cap STAAD Vertical Vertical Vertical Vertical Vertical
Vertical Vertical Vertical Vertical Vertical Vertical
Node L/C Fy Mton Fy Mton Fy Mton Fy Mton Fy Mton Fy
Mton Fy Mton Fy Mton Fy Mton Fy Mton Fy Mton
25 1 LOAD CASE 1 DL 221.01 359.76 395.299 397.495
398.327 398.884 399.159 399.322 399.399 399.46 399.53
31 1 LOAD CASE 1 DL 221.01 359.76 395.299 397.495
398.327 398.884 399.159 399.322 399.399 399.46 399.53
Central pile 61 1 LOAD CASE 1 DL 1115.959 560.96 418.802
410.021 406.693 404.464 403.365 402.711 402.404
402.161 401.878
91 1 LOAD CASE 1 DL 221.01 359.76 395.299 397.495
398.327 398.884 399.159 399.322 399.399 399.46 399.53
97 1 LOAD CASE 1 DL 221.01 359.76 395.299 397.495
398.327 398.884 399.159 399.322 399.399 399.46 399.53