Professional Documents
Culture Documents
Contoh RAB Interior
Contoh RAB Interior
Program :
Kegiatan :
Pekerjaan :
Lokasi :
Tahun :
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOL SAT
( Rp) (Rp)
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi 5.833,90 M2 450,00 2.625.255,00
2 Pek. Barak Kerja 1,00 Ls 1.500.000,00 1.500.000,00
3 Pek. Papan Nama Proyek 1,00 Ls 250.000,00 250.000,00
SUB JUMLAH 4.375.255,00
II. PEKERJAAN RUANG KERJA SEKDA
1 Pek. Lemari Pakaian (120 x 60 x 210) Cm 1,00 Unit 850.000,00 850.000,00
2 Pek. Dinding Panel Uk. (400 x 300) Cm 1,00 Set 320.000,00 320.000,00
3 Pek. Wallpaper 89,50 M2 530.635,00 47.491.832,50
SUB JUMLAH 48.661.832,50
III. PEKERJAAN RAPAT SEKDA
1 Pek. Wallpaper 68,00 M2 530.635,00 36.083.180,00
SUB JUMLAH 36.083.180,00
IV. PEKERJAAN RUANG KERJA ASISTEN 1
1 Pek. Lemari Arsip Uk. (80 x 40 x 200) Cm 1,00 Unit 950.000,00 950.000,00
2 Pek. Wallpaper 53,35 M2 530.635,00 28.309.377,25
SUB JUMLAH 29.259.377,25
V. PEKERJAAN RUANG KERJA ASISTEN 2
1 Pek. Lemari Arsip Uk. (80 x 40 x 200) Cm 2,00 Unit 950.000,00 1.900.000,00
2 Pek. Wallpaper 53,38 M2 530.635,00 28.325.296,30
SUB JUMLAH 30.225.296,30
VI. PEKERJAAN RUANG KERJA ASISTEN 3
1 Pek. Lemari Arsip Uk. (80 x 40 x 200) Cm 2,00 Unit 950.000,00 1.900.000,00
2 Pek. Wallpaper 53,38 M2 530.635,00 28.325.296,30
SUB JUMLAH 30.225.296,30
VII. PEKERJAAN RUANG RAPAT & STAF ASISTEN
1 Pek. Meja Rapat Uk. (280 x 140) Cm 1,00 Unit 2.300.000,00 2.300.000,00
2 Pek. Meja Kerja Staf Uk. (120 x 60) Cm 3,00 Unit 950.000,00 2.850.000,00
SUB JUMLAH 5.150.000,00
VIII. PEKERJAAN AULA UTAMA
1 Pek. Wallpaper 375,00 M2 530.635,00 198.988.125,00
SUB JUMLAH 198.988.125,00
IX. PEKERJAAN AULA MELATI
1 Pek. Wallpaper 98,00 M2 530.635,00 52.002.230,00
SUB JUMLAH 52.002.230,00
X PEKERJAAN AULA MAWAR
1 Pek. Wallpaper 51,50 M2 530.635,00 27.327.702,50
SUB JUMLAH 27.327.702,50
XI PEKERJAAN RUANG AJUDAN WAKIL BUPATI
1 Pek. Wallpaper 40,80 M2 530.635,00 21.649.908,00
SUB JUMLAH 21.649.908,00
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOL SAT
( Rp) (Rp)
1 2 3 4 5 6
JUMLAH 843.636.640,80
PPn 10 % 84.363.664,08
JUMLAH TOTAL 928.000.304,88
DIBULATKAN 928.000.000,00
Terbilang : Sembilan Ratus Dua Puluh Delapan Juta Rupiah