TWFLUENT
00 m3/0
RAW. WATER]
TANK
10 Woy Divider Box
CONSTRUCTION CAMP AREA W.W.T 900M3/D
euock 1 = 90030
‘Siig Ret
BLOCK 2 = SO NSID lemianTe BLOCK 1)
{0 MSID (GWAR To BLOGK TI
BLOCK 4 = SDMSID (GnmaR ve BLOCK 1)
BLOGKS = 90 Na/O (anwar To BLOGK 1)
LOGE 6 = 90 NG/D lentan ro BLOGK
Teiman vo BLOCK 1)
BLOCK B= 90 3/0 Ienncan va BLOGK 1
BLOCK 9 = 90 W/O Inman To BLOCK 1
Treated Water
Treated Woter
Treated Water
Treated Water
Treoted Noter
Treated Nater
Treated Water
Treated Water
SIoroge Tank
‘EPPLUENT.
TIT
‘BLOCK 10 = 90 W/O Ismican Ta BLOGK 1
Treated Water
SEIRYU MAINTENANCE CO.LTD.
m
Tarra —| sa av sr]
wt NS eT aw Po [tatsono oo ss m7 Pa a su]
| wo | mo | 50
Goo ond
3.000 pensom x 300k/p.d
@ B00h/ped
1 Line = Wad. K lOLine,
Reference clr awimg
Ln
( About Space
eG
GENERAL SPESIFICATION
TPE WHT 500
B08 Inflow Waste Water Copacy {900 m¥/éa
‘Inflow BOD 00 dy BBE ma/t
Outfow B00 0 ma/t
| SEIRYU MAINTENANGE CO.LTD.
— vo [aaa Cg ROT BT] me |e
a ma oe
UPPER SECTION Seocwe! [iw [oe sera
Sea "rou recer are Pop rar] ccV
A
A SECTION
UW
GENERAL SPESIFICATION
Tee Wi 800,
Inflow Woste Water Copacity | 900 m3 /do
Inflow B00, 350_ma/t 300] ome /€
‘ution BOD 20 ma/L
SEIRYU MAINTENANCE CO.,LTD.
C SECTION Ly A — rl w]e
a Oe
eS Ee oe