Professional Documents
Culture Documents
Bonus Project
Bonus Project
Announcement:
This is a bonus project. Students completing this project could earn at most 10 bonus points toward their
final weighted grades for this course. Students not completing this project will not lose any points.
https://www.energy.gov/sites/prod/files/oeprod/DocumentsandMedia/BlackoutFinal-Web.pdf
1. The length of the project report should not exceed 10 pages (letter size).
2. Summarize what happened during the 2003 blackout. Clearly describe the sequence of different
events that led to the blackout (the cascading failure).
3. Identify the causes (contributing factors) for the 2003 blackout. Describe the roles of system
protection devices in this blackout.
4. Summarize the recommendations to prevent power grid blackouts in the future.
5. According to your understanding, analyze the inappropriate coordination of the protection devices
during the 2003 blackout, and make your suggestions for improving the protection device
coordination.