You are on page 1of 14
OO +O00. 0188-0: 0-00-60 0-0-0-0-9-6-8:-0-0-% ' | ne eae a Chapter 2 Ole oe festa a pn crore SPECIFICATIONS q 17 | Rain water pipes 100mm dia “Running metre =| i - - — ve [Rc ig joe 1 | Pategicnamey — er ee ee White wating extemal walle 1 Theos oan fon is necessary 10 ort iil prepring the stints the qu ‘pci of ee sons “Hes anton wether Sal be way wera ad botom all be ecely el The bed of the tench shall be igh watered and wi 4 “Foci of able things found dig excavation shal propery of ie lnc of te efile in the plinth Shall be apr out ons of cnr they apply 1 the work 383 on govern nthe cote wien eo, eos brik ba, sone, ble salts reat rm the sme ae sul be wed ton, pipes an drain tei shale ested 108 12 Thelin sate done in ier nea 28m cach ay sain ces shall be red ut inal st tale watered, amined and cneaidatd before he suceeding eesary woking fet ne ings hor he evil sal be he SPE salle wed ren Wicks sal nae wank excep a canes Bick sal beak pointy ston th og identi pana pn the handle of te wowed AL "icomere ale aly i lab Fstres: Al iron fstres sich 38 pipe ots of waters, hol fs, et, shall be ce tar orcerant concrete ove Lececeee.

You might also like