You are on page 1of 4
0026 (0260006 , Trconring ll Alton Coal Development, LLC 4h e 483 Noth 100 West, Suite 1 AX Ceca City, Utah 88720 COP ¥ cu: Pisce Compttouow | Phone (435) 867-5331 « Fax (435) 867-1192 October 13, 2009 Daron R. Haddock Department of Natural Resources Utah Division of Oil, Gas & Mining 1594 West North Temple, Suite 1210 Salt Lake City, UT 84114 Re: Supplemental Information to Response of Technical Review (Task ID #3100) Coal Hollow Project, Kane County, Utah, C/025/0005 Dear Mr. Haddock: Based on discussions with UDOGM staff, Alton Coal Development is submitting this supplemental information for the Mining and Reclamation Plan, C/025/00S. Each item in this submittal is in response to specific requests made by the Division as part of the technical evaluation of the plan. Please let me know if there is any other assistance that we can provide. Sincerely, ‘Chris McCourt vein RECEIVED asa cg OCT 14 209 Orspeadable 94 eter ters oC ELC DIV.OF OIL, GAS & MINING (2500S. COPY crcinonronconmmarmocesane CONFIDENTIAL Permit Change [] New Permit [3] Renewal] Exploration[] Bond Release (] Transfer [7] Permittee: _Alton Coal Development, LLC Mine: _Coal Hollow Permit Number: _C/025/0005 Titie: _Mining and Reclamation Plan - Supplemental Information for Technical Review 2 ( Task ID #3100) Revisions Description, include reason for application and timing required to implement: ‘These documents are supplemental to the submission made by ACD dated August 27, 2009. Instructions: Ifyou answer yes to any ofthe first eight (ray) question, this application may require Public Notice publication. (Yes DQNo 1. Change in the size ofthe Permit Area? Actes: ____ Disturbed Area: Li increase [9 decrease, [Yes No 2. Isthe application submitted as a result ofa Division Order? DOH [Yes KJ No 3. Does the application include operations outside a previously identified Cumulative Hydrologic Impact Area? [Yes BRNo 4. Does the appliction include operations in hydrologic basins other than as curently approved? [Yes BJNo 5. Does the applicatfon result rom cancellation, reduction or increase of insurance of reclamation bond? [Yes!BNo 6. Does the application requte or include pubic notice publication? [dyes []No 7, Does the application require or include ownership, control, ight-of-entry, or compliance information? Yes BQ No 8. Isproposed activity within 100 fet of a public road or cemetery or 300 feet ofan occupied dwelling? ‘es Q] No 9. Is the application submited as a result of a Violation? NOV # [Yes BaNo 10. Is the application submitted as a result of ether lawe or regulations or policies? Explain: Yes CJNo 11. Does the application affect the surface landowner or change the post mining land use? [Yes No 12. Does the application require or include underground design or mine sequence and timing? (Modification of R2P2) [Yes [] No 13. Does the application require or include collection and reporting of any baseline information? [Yes No 14. Could the application have aay effect on wildlife or vegetation outside the curent disturbed area? Bd ¥es[] No. 15. Does the application require or include soll removal, storage or placement?” Bd ¥es(1No 16. Does the application requir or include vegetation monitoring, removal or revegetation activities? Y= No 17. Door h apleation requir or ioe constution motion eranaval of srs Bele? 18. Does the application require o include water monitoring, sediment or drainage contro! measures? Ba esc] No 19: Doct eppeaon eae ore cot depet map or caeltont (Yes B)No 20, Does the application require or include subsidence control or monitoring? 1 Yes Bq No 21. Have reclamation costs for bonding been provided? Gi Yes [No 22, Does the application involve a perennial steam, a stream buffer zone or discharges to a stream? Ed Yes E]No 23. Does the application affect permits issued by other agencies or permits issued to other entities? Please attach four (4) review copies of the application. Ifthe mine is on or adjacent to Forest Service land please submit five _(5) copies, thank you. (These number include w copy for he Price Fil Office) ie eee erage asa zal een alone een aoa iis coop co enn I ee me es eae fete nm habeet Neat re Zyl log mae ¢ For Office Use Only: Tavlgued Tracking | Received by OU, Gar & Mining, Number RECEIVED OCT 14 2009 DIV, OF OIL, GAS & MINING. ‘Foren DOGME CI (Revived Warch 12,2003) COPY. APPLICATION FOR COAL PERMIT PROCESSING led Schedule Of Changes to the Mining And Reclamation Plan Permittee: _Alton Coal Development, LLC Coal Hollow ‘Mining and Reclamation Plan - Supplemental Information for 1 Permit Number: _C/025/0005 ;chnical Review 2 ( Task ID #3100) Revisions Provide a detailed listing of all changes to the Mining and Reclamation Plan, which is required as a result of this proposed permit application. Individually list all maps and drawings that are added, replaced, or removed from the plan. Include changes to the table ‘of contents, section of the plan, or other information as needed to specifically locate, identify and revise the existing Mining and Reclamation Plan, Include page, section and drawing number as part ofthe description. DESCRIPTION OF MAP, TEXT, OR MATERIAL TO BE CHANGED CUAdd Bi Replace LC} Remove _Volume 7 Confidential, Appendix 1-1, 112.310 Members and Managers of Alton Coal page Tadd C)Replace ] Remove CJAdd CReplace CT) Remove Tadd Replace L] Remove CAdd C)Replace [] Remove (ClAdé Replace CL) Remove Chadd CReplace C)Remove Tadd CReplace [] Remove ChAdé Ci) Replace C) Remove DAdd (Replace [] Remove DAdd CReplace C)Remove Tadd Replace LC) Remove DAds Replace C)Remove Add Replace [Remove Chadd C)Replace [Remove ClAdd C)Replace CRemove Tadd Replace Remove Cade CReplace Remove CAdd Replace [] Remove Chadd O)Replace L)Remove LlAdd CyReptace [1] Remove Chadd CyReptace LC] Remove CAdd [Replace [) Remove Chadd C)Replace LC) Remove Chadd CReplace CO) Remove Chadd CyReplace CL] Remove ClAdd O)Replace [Remove Dadi [Replace [] Remove ‘Any other specific or special instruction required for insertion of this proposal into the Received by Oil, Gas & Mining Mining and Reclamation Plan. RECEIVED CONFIDENTIAL OCT 14 ang DMLOF OL, 64s & amy Fort DOGM - C2 (Revised March 12,2002)

You might also like